Plan Review Stops For Permit 18050850
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-05-25 Cont ID  
Sent By rmcdouga Date 2018-05-25 Time 10:09 Rev Time 0.00
Received By rmcdouga Date 2018-05-25 Time 10:09 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-05-31 Cont ID  
Sent By jleahy Date 2018-05-31 Time 16:37 Rev Time 0.00
Received By jleahy Date 2018-05-31 Time 16:37 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2018-06-27 Cont ID  
Sent By thunt Date 2018-06-27 Time 20:02 Rev Time 0.00
Received By thunt Date 2018-06-27 Time 20:02 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2018-06-11 Cont ID  
Sent By thunt Date 2018-06-11 Time 17:14 Rev Time 0.00
Received By thunt Date 2018-06-11 Time 16:27 Sent To  
Notes
2018-06-11 16:42:4306/11/2018 2ND GAS REVIEW**DENIED**
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1) THE GAS METER AC-250 HAS A MAX OUTPUT OF 560 BTU'S @
 12" W.C AND 610 BTU'S @ 2PSI AND WOULD BE UNDERSIZED.
 1" SCH 40 PIPING BASED OFF FBC FUEL AND GAS 402.4 (1)
 LIST A MAX BTU FLOW OF 514 BTU'S. YOU ENTIRE SYSTEM IS
 UNDERSIZED .WHAT IS YOUR INTENT ON UPGRADING IF
 NECESSARY AS PER YOUR COMMENT ON THE PLAN? FBC 107.2.1
  
 2) YOU REFERENCE NFPA 15 ON YOUR PLAN. NFPA 15 DOES NOT
 APPLY TO ANYTHING ON THIS PERMIT APPLICATION. PLEASE
 CORRECT. FBC 107.2.1
  
 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. 2014 FGC SEC.410.1, 2017 FBC-RES. SEC.
 G2421.1.
  
 4) THE DORMONT FLEX CONNECT IS NOT PART OF THE U.L
 LISTING OF THIS GENERATOR. CALL'S TO GENERAC ABOUT THIS
 ISSUE HAVE GONE UNANSWERED IN THE PAST WITH CALLS TO
 DORMONT SAYING THAT THIS FLEX CONNECTOR IS ONLY
 APPROVED AS LABEL. THIS SAME CONNECTED IS SUPPLIED FOR
 ALL THERE GENERATORS UP TO 42KW. THE CHART PROVIDED BY
 DORMONT WILL BE WHAT THE INSPECTOR GOES BY ON THE
 INSPECTION.
  
 5) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1)
 THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8,
 G2413.1, G2413.2, & G2413.3.
  
  
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-06-02 Cont ID  
Sent By tklarge Date 2018-06-02 Time 04:48 Rev Time 0.00
Received By tklarge Date 2018-06-02 Time 04:37 Sent To I
Notes
2018-06-02 04:47:591) ) THE PLANS INDICATE AN EXISTING GAS METER. THE BTU
 LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE
 TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING
 SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING
 SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING
 SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS
 THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH
 APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH
 APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF
 PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE
 EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE
 SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE
 REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES.
 FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR
 SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3.
 2) THE GAS PLAN SHOWS A LESS THAN 2 PSI SYSTEM SO WHY
 IS THERE A REGULATOR AT THE GENERATOR? CLARIFY.
 3) SHOW THE TYPE OF PIPE AND PIPE SIZE AT THE OUTLET OF
 THE GAS METER.
 4) SUBMIT THE MANUF. SPECIFICATIONS FOR THE GAS FLEX
 CONNECTOR FOR THE GENERATOR.THE FLEX CONNECTOR SHALL BE
 APPROVED TO FLOW THE MAXIMUM BTU LOAD FOR THE
 GENERATOR. 2017 FBCR SEC. G2422.1 (8).
 5) THE TRACER WIRE OR TAPE SHALL NOT BE IN DIRECT
 CONTACT WITH
 THE POLYAMIDE OR POLYETHYLENE PIPE PER NFPA-15
 SEC.6.9.4.6.
 6) SEDIMENT TRAP IS REQUIRED PER 2017 FBC - FUEL GAS
 SEC. 408.4.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
  
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2018-05-23 Cont ID  
Sent By destabro Date 2018-05-23 Time 14:11 Rev Time 0.00
Received By destabro Date 2018-05-23 Time 14:11 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-06-27 Cont ID  
Sent By thunt Date 2018-06-27 Time 20:02 Rev Time 0.00
Received By thunt Date 2018-06-15 Time 13:45 Sent To I
Notes
2018-06-18 13:45:38RESUB ROUTED TO THUNT

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-06-11 Cont ID  
Sent By thunt Date 2018-06-11 Time 17:25 Rev Time 0.00
Received By thunt Date 2018-06-08 Time 12:37 Sent To I
Notes
2018-06-11 12:38:05RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-06-02 Cont ID  
Sent By tklarge Date 2018-06-02 Time 04:48 Rev Time 0.00
Received By tklarge Date 2018-05-17 Time 14:02 Sent To I
Notes
2018-05-18 14:02:35ROUTED TO HISTORIC INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2018-05-23 Cont ID  
Sent By destabro Date 2018-05-23 Time 14:10 Rev Time 0.00
Received By destabro Date 2018-05-23 Time 14:10 Sent To HIST
Notes
***NONE***