Plan Review Details - Permit 18050790
Plan Review Stops For Permit 18050790
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-06-30 Cont ID  
Sent By shill Date 2018-06-30 Time 15:59 Rev Time 0.00
Received By shill Date 2018-06-30 Time 15:59 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-06-07 Cont ID  
Sent By shill Date 2018-06-07 Time 18:40 Rev Time 0.00
Received By shill Date 2018-06-07 Time 18:40 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-07-02 Cont ID  
Sent By jpearson Date 2018-07-02 Time 07:53 Rev Time 0.00
Received By jpearson Date 2018-07-02 Time 07:53 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-06-11 Cont ID  
Sent By jpearson Date 2018-06-11 Time 08:05 Rev Time 0.00
Received By jpearson Date 2018-06-11 Time 08:05 Sent To  
Notes
2018-06-11 08:05:41CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2017 6TH ED.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. THE NEC AND FBC SPECIFIED FOR DESIGN IS NOT THE
 CURRENT CODE. PROVIDE CORRECTION. FBC PREFACE (ALSO SEE
 CURRENT CODES ABOVE)
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2018-06-11 Cont ID  
Sent By scaldero Date 2018-06-11 Time 13:16 Rev Time 0.00
Received By scaldero Date 2018-06-11 Time 13:08 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2018-07-02 Time   Rev Time 0.00
Received By cpuell Date 2018-06-21 Time 09:33 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-06-12 Cont ID  
Sent By cpuell Date 2018-06-12 Time 16:13 Rev Time 0.00
Received By cpuell Date 2018-05-17 Time 09:42 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2018-06-12 Cont ID  
Sent By gjohnson Date 2018-06-12 Time 10:21 Rev Time 0.00
Received By gjohnson Date 2018-06-12 Time 10:21 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2018-06-30 Cont ID  
Sent By shill Date 2018-06-30 Time 15:59 Rev Time 0.00
Received By shill Date 2018-06-30 Time 15:59 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2018-06-07 Cont ID  
Sent By shill Date 2018-06-07 Time 18:42 Rev Time 0.00
Received By shill Date 2018-06-07 Time 18:42 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved