Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2018-07-16 Cont ID  
Sent By shill Date 2018-07-16 Time 16:13 Rev Time 0.00
Received By shill Date 2018-07-16 Time 16:13 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2018-06-27 Cont ID  
Sent By shill Date 2018-06-27 Time 12:52 Rev Time 0.00
Received By shill Date 2018-06-27 Time 12:52 Sent To  
Notes
2018-06-27 12:48:23****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 1. WHEN RESUBMITTING, PROVIDE TWO IDENTICAL COLLATED
 SETS OF DOCUMENTS FOR ISSUANCE. OLD SHEETS (BOTH SETS)
 SHOULD BE RETAINED IN THE PACKAGE; PLEASE DO NOT
 DISCARD ANY DOCUMENTS. THEY SHOULD BE BOUND TOGETHER
 SEPARATELY FROM THE TWO ISSUANCE SETS AND MARKED "VOID"
 OR "OLD SHEETS". PLEASE DO NOT STAMP THE PLANS VOID AS
 APPLICANTS ARE INADVERTENTLY STAMPING SHEETS THAT WE
 NEED "VOID", RENDERING THEM NOT USABLE.
  
 2. THE PROPOSED IMPROVEMENT IS LOCATED IN A SPECIAL
 FLOOD HAZARD AREA. SEE CITY OF WEST PALM BEACH
 MUNICIPAL CODE SECTION 18-290, ALTHOUGH TEMPORARY
 CONSTRUCTION TRAILERS ARE EXEMPT FROM THE REQUIREMENTS
 OF THE FLORIDA BUILDING CODE, THEY ARE NOT EXEMPT FROM
 FLOOD REQUIREMENTS (FEDERAL).
  
 REVISE PLAN TO SHOW PROPOSED ELEVATION OF THE FINISHED
 FLOOR AND/OR DRY FLOODPROOFING. THE DESIGN FLOOD
 ELEVATION AT THIS LOCATION IS 14.7 NAVD88 (12.7 BFE +
 2' FREEBOARD). IF ANY PORTION OF THE STRUCTURE
 INCLUDING FOUNDATION IS BELOW DFE, IT IS TO BE MADE OF
 FLOOD RESISTANT MATERIALS AND BE DESIGNED TO RESIST
 FLOOD LOADS; REVISE PLAN ACCORDINGLY.
  
 2ND REVIEW:
  
 SEE THE NOTE ON THE SIGNED AND SEALED PLAN, SHEET C1,
 FLOOD NOTES. APPLICANT PROPOSES TO HAVE FINISHED FLOOR
 MEET FREEBOARD, BUT BLOCKS ON LIMEROCK BASE WILL BE
 BELOW THE DESIGN FLOOD ELEVATION. THIS IS TO RESIST
 FLOOD LOADS, BUT IS SPECIFICALLY EXCLUDED FROM THE
 ENGINEERING. ADDRESS BY EITHER HAVING ENGINEER DESIGN A
 FOUNDATION/SUPPORT WHICH IS DESIGNED TO RESIST FLOOD
 LOADS, OR PROPOSE INSTALLATION WHICH MEETS FREEBOARD
 REQUIREMENT.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-06-07 Cont ID  
Sent By shill Date 2018-06-07 Time 09:07 Rev Time 0.00
Received By shill Date 2018-06-07 Time 09:07 Sent To  
Notes
2018-06-07 09:26:50****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 1. WHEN RESUBMITTING, PROVIDE TWO IDENTICAL COLLATED
 SETS OF DOCUMENTS FOR ISSUANCE. OLD SHEETS (BOTH SETS)
 SHOULD BE RETAINED IN THE PACKAGE; PLEASE DO NOT
 DISCARD ANY DOCUMENTS. THEY SHOULD BE BOUND TOGETHER
 SEPARATELY FROM THE TWO ISSUANCE SETS AND MARKED "VOID"
 OR "OLD SHEETS". PLEASE DO NOT STAMP THE PLANS VOID AS
 APPLICANTS ARE INADVERTENTLY STAMPING SHEETS THAT WE
 NEED "VOID", RENDERING THEM NOT USABLE.
  
 2. THE PROPOSED IMPROVEMENT IS LOCATED IN A SPECIAL
 FLOOD HAZARD AREA. SEE CITY OF WEST PALM BEACH
 MUNICIPAL CODE SECTION 18-290, ALTHOUGH TEMPORARY
 CONSTRUCTION TRAILERS ARE EXEMPT FROM THE REQUIREMENTS
 OF THE FLORIDA BUILDING CODE, THEY ARE NOT EXEMPT FROM
 FLOOD REQUIREMENTS (FEDERAL).
  
 REVISE PLAN TO SHOW PROPOSED ELEVATION OF THE FINISHED
 FLOOR AND/OR DRY FLOODPROOFING. THE DESIGN FLOOD
 ELEVATION AT THIS LOCATION IS 14.7 NAVD88 (12.7 BFE +
 2' FREEBOARD). IF ANY PORTION OF THE STRUCTURE
 INCLUDING FOUNDATION IS BELOW DFE, IT IS TO BE MADE OF
 FLOOD RESISTANT MATERIALS AND BE DESIGNED TO RESIST
 FLOOD LOADS; REVISE PLAN ACCORDINGLY.
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-06-27 Cont ID  
Sent By ppetty Date 2018-06-27 Time 09:52 Rev Time 0.00
Received By ppetty Date 2018-06-27 Time 09:52 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-05-31 Cont ID  
Sent By jleahy Date 2018-05-31 Time 11:37 Rev Time 0.00
Received By jleahy Date 2018-05-31 Time 11:37 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2018-06-15 Cont ID  
Sent By pleduc Date 2018-06-15 Time   Rev Time 0.00
Received By pleduc Date 2018-06-15 Time 13:29 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2018-05-15 Cont ID  
Sent By pleduc Date 2018-05-15 Time   Rev Time 0.00
Received By pleduc Date 2018-05-14 Time 15:31 Sent To  
Notes
2018-05-15 14:17:17THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
  
 1) THE SEPARATION DISTANCE OF THE TWO PROPOSED TRAILERS
 DOES NOT MEET THE REQUIRMENTS OF NFPA 241.
  
 THE PROPOSED TRAILERS ARE INDICATEDED AS 60 WIDE ON THE
 EXPOSED SIDES. THE SEPARATION IS INDICATED AS 31'. THE
 CODE REQUIRES 50'.
  
 FIRE SPRINKLER PROTECTION WOULD BE REQUIRED TO REDUCE
 THE 50' BY 75%.
  
 ADDITIONALLY, THERE IS NO INDICATION OF THE SEPARATION
 DISTANCE FROM THE NEAREST NEW BUILDING STRUCTURE.
  
  
 CONSTRUCTION TRAILERS
  
 PER NFPA 241, 4.2 TEMPORARY OFFICES AND SHEDS; TABLE
 4.2.1 SEPARATION DISTANCES, FIRE SPRINKLERS ARE
 REQUIRED IN EACH TRAILER.
 4.2.1* SEPARATION DISTANCES BETWEEN BUILDINGS UNDER
 CONSTRUCTION AND CONSTRUCTION-RELATED STRUCTURES, SUCH
 AS TEMPORARY OFFICES, TRAILERS, SHEDS, AND OTHER
 FACILITIES FOR THE STORAGE OF TOOLS AND MATERIALS
 HAVING COMBUSTIBLE CONSTRUCTION OR CONTENTS, SHALL BE
 IN ACCORDANCE WITH TABLE 4.2.1.
  
 1) 20 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 30 FEET
 2) 30 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 35 FEET
 3) 40 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 40 FEET
 4) 50 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 45 FEET
 5) 60 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 50 FEET
 6) GREATER THAN 60 FEET EXPOSED LENGTH SHALL BE
 SEPARATED FROM ADJACENT STRUCTURES BY AT LEAST 60 FEET
 **A 75 PERCENT REDUCTION IN SEPARATION DISTANCES SHALL
 BE PERMITTED TO BE APPLIED, PROVIDED AUTOMATIC
 SPRINKLER PROTECTION IS USED IN THE EXPOSING STRUCTURE.
  
 NOTES:
 (1) WHERE THE SEPARATION DISTANCE BETWEEN TEMPORARY
 STRUCTURES IS LESS THAN THE MINIMUM SEPARATION
 DISTANCE, THEN THE EXPOSING WALL LENGTH SHALL BE
 CONSIDERED TO BE THE SUM OF THE INDIVIDUAL EXPOSING
 WALL LENGTHS OF THE TEMPORARY STRUCTURES.
 (2) A 75 PERCENT REDUCTION IN SEPARATION DISTANCES
 SHALL BE PERMITTED TO BE APPLIED, PROVIDED AUTOMATIC
 SPRINKLER PROTECTION IS USED IN THE EXPOSING STRUCTURE.
 (3) THE SEPARATION DISTANCES APPLY TO SINGLE-LEVEL
 STRUCTURES ONLY. THIS TABLE DOES NOT APPLY TO
 MULTILEVEL, UNSPRINKLERED STRUCTURES. A LEVEL, WHERE
 APPLYING THIS TABLE, IS 3600 MM (144 IN.).
  
 4.2.2* DETACHMENT BETWEEN TEMPORARY STRUCTURES,
 ADEQUATE TEMPORARY FIXED FIRE PROTECTION SYSTEMS, AND
 PORTABLE EQUIPMENT SHALL BE PROVIDED AS REQUIRED BY THE
 AUTHORITY HAVING JURISDICTION.
  
  
 PLEASE REVIEW AND CORRECT OR JUSTIFY WITH SPECIFIC CODE
 REFERENCES.
  
  
  
  
 2) PLEASE PROVIDE THE DETAILS OF ANY PROPOSED RAMPS,
 STEPS, DECKING, WALKWAYS, ETC, ASSOCIATED WITH THESE
 TRAILERS.
  
  
  
 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
  
 4)ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-06-29 Cont ID  
Sent By gjohnson Date 2018-06-29 Time 09:10 Rev Time 0.00
Received By gjohnson Date 2018-06-13 Time 10:54 Sent To  
Notes
2018-06-14 10:54:59B09

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-06-07 Cont ID  
Sent By shill Date 2018-06-07 Time 09:26 Rev Time 0.00
Received By shill Date 2018-05-09 Time 15:35 Sent To  
Notes
2018-05-09 15:35:35B15

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2018-05-18 Cont ID  
Sent By hmoser Date 2018-05-18 Time 14:04 Rev Time 0.00
Received By hmoser Date 2018-05-18 Time 14:01 Sent To  
Notes
***NONE***

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status P Date 2018-07-16 Cont ID  
Sent By shill Date 2018-07-16 Time 16:13 Rev Time 0.00
Received By shill Date 2018-07-16 Time 16:13 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-06-29 Cont ID  
Sent By gjohnson Date 2018-06-29 Time 09:09 Rev Time 0.00
Received By gjohnson Date 2018-06-29 Time 09:09 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-05-22 Cont ID  
Sent By gjohnson Date 2018-05-22 Time 09:34 Rev Time 0.00
Received By gjohnson Date 2018-05-22 Time 06:07 Sent To  
Notes
2018-05-22 09:34:181ST REVIEW: FBC 2017 6TH EDITION
  
 PLUMBING COMMENTS:
  
 1. PROVIDE DOCUMENTATION OF STATE APPROVAL FOR A
 MODULAR BUILDING. PER WPB AMEND TO FBC 107.3
  
 2. SHOW LOCATION AND SIZE OF SANITARY HOLDING TANKS ON
 SITE PLAN. PER WPB AMEND TO FBC 107.2.1
  
 3. PROVIDE DOCUMENTATION OF PUMPOUT SCHEDULE FOR
 SANITARY HOLING TANKS. PER WPB AMEND TO FBC 107.2.1
  
 4. SHOW LOCATION AND SIZE OF WATER SERVICE AND
 BACKFLOWS FOR EACH TRAILER. PER WPB AMEND TO FBC
 107.2.1
  
 5. PLEASE PLACE NOTE ON SITE PLAN A BACKFLOW IS
 REQUIRED AT THE WATER METER AND SHALL HAVE SEPARATE
 PERMIT. PER WPB CROSS CONNECTION MANUAL. PER WPB AMEND
 TO FBC 107.2.1
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date 2018-06-27 Cont ID  
Sent By hmtribou Date 2018-06-27 Time 14:19 Rev Time 0.00
Received By hmtribou Date 2018-06-27 Time 14:19 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2018-05-18 Cont ID  
Sent By HT Date 2018-05-18 Time 10:25 Rev Time 0.00
Received By hmtribou Date 2018-05-18 Time 10:25 Sent To  
Notes
2018-05-18 10:25:30ALL SUCH STRUCTURES, INCLUDING TRAILERS, SHALL BE
 REMOVED WITHIN SEVEN DAYS OF THE FINAL CONSTRUCTION
 INSPECTION BY THE CITY AND PRIOR TO THE ISSUANCE OF A
 CERTIFICATE OF OCCUPANCY.