| 2018-07-30 14:25:05 | ****CORRECTIONS**** |
| | W.P.B. PERMIT: 18050313 |
| | |
| | DYLAN BATTLES |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6718 |
| | |
| | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | |
| | 1. OK. |
| | |
| | 2. WHEN COMPLETING THE INSTALLATION SCHEDULE, PLEASE |
| | NOTE PAGE 13 OF 20, FACTORS APPLY DEPENDING ON |
| | SUBSTRATE, EDGE DISTANCE AND FASTENER. FOR FASTENER, IF |
| | USING TAPCON, BE SPECIFIC AS TO WHICH TAPCON (TAPCON |
| | W/ADVANCED THREADFORM TECHNOLOGY REQUIRES A .9 FACTOR). |
| | 2.1. THE EDGE DISTANCE DOESN'T MEET THE TABLE ON PAGE |
| | 13 OF 20. |
| | IF YOU USE ALL POINT ANCHORS AS SPECIFIED THAN YOUR |
| | MINIMUM EDGE DISTANCE WOULD BE 3.5" AND YOU WOULD USE |
| | FACTOR .78*10(ANCHOR SPACING) FOR A NEW ANCHOR SPACING |
| | OF 7.8". |
| | PLEASE LOOK AT THIS TABLE EDGE DISTANCE VS. SPACING |
| | SCHEDULE FOR ANCHORS AND CHOOSE THE ANCHOR AND SPACING |
| | THAT WORKS BEST FOR YOUR PROJECT. |
| | CALL IF ANY QUESTIONS ABOUT THE EDGE SPACING. |
| | DYLAN BATTLES 561-805-6718. |
| | |
| | ALSO, THE I.D. NO. 4&5 FROM SALES SHEET DON'T MATCH THE |
| | SUBMITTAL SHEET OPENING 4&5. I HAVE NO COMMENT ON THAT |
| | BECAUSE IT WON'T CHANGE SPACING VALUES, BUT YOU MAY |
| | WANT TO VERIFY THE SIZE BEFORE FABRICATION. |
| | |
| | NOTE: |
| | -PLEASE PROVIDE COMMENT RESPONSE SHEET TO EXPLAIN HOW |
| | EACH COMMENT IS BEING ADDRESSED. |
| | -ADDITIONAL COMMENTS MAY BE FORTHCOMING PENDING REVIEW |
| | OF MATERIALS REQUESTED. |
| | -WHEN RESUBMITTING, PROVIDE TWO IDENTICAL COLLATED SETS |
| | OF DOCUMENTS FOR ISSUANCE. OLD SHEETS (BOTH SETS) |
| | SHOULD BE RETAINED IN THE PACKAGE; PLEASE DO NOT |
| | DISCARD ANY DOCUMENTS. THEY SHOULD BE BOUND TOGETHER |
| | SEPARATELY FROM THE TWO ISSUANCE SETS AND MARKED "VOID" |
| | OR "OLD SHEETS". PLEASE DO NOT STAMP THE PLANS VOID AS |
| | APPLICANTS ARE INADVERTENTLY STAMPING SHEETS THAT WE |
| | NEED "VOID", RENDERING THEM NOT USABLE. |
| | |