Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-06-29 Cont ID  
Sent By tklarge Date 2018-06-29 Time 14:51 Rev Time 0.00
Received By tklarge Date 2018-06-22 Time 15:34 Sent To I
Notes
2018-06-25 15:34:35RESUB OF REVISION ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2018-05-21 Time   Rev Time 0.00
Received By lmarchan Date 2018-05-07 Time 14:59 Sent To  
Notes
2018-05-08 14:59:19REVISION ROUTED TO TKLARGE

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2018-06-27 Cont ID  
Sent By ccole Date 2018-06-27 Time 10:04 Rev Time 0.00
Received By ccole Date 2018-06-27 Time 07:13 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2018-05-21 Cont ID  
Sent By ccole Date 2018-05-21 Time 12:09 Rev Time 0.00
Received By ccole Date 2018-05-21 Time 12:09 Sent To I
Notes
2018-05-21 13:09:291ST REVIEW FBC-2017 MECHANICAL
 PERMIT #18050282
 5/21/18
  
 CODES IN EFFECT:
 FBC BC- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC MC- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC RE- FLORIDA RESIDENTIAL CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC-SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) THE SUBMITTED PLANS FROM DME BREWING SOLUTIONS ARE
 SCHEMATIC THAT WILL REQUIRE MODIFICATIONS TO DEPICT THE
 ACTUAL FIELD INSTALLATION.THE DRAWINGS WILL ALSO
 REQUIRE SHOP DRAWING APPROVALS STAMPS BY THE MEP
 ENGINEER OF RECORD (PLEASE NOTE THAT DME BREWING
 SOLUTIONS IS A CANADIAN COMPANY WITH CANADIAN ENGINEERS
 THAT ARE NOT LICENSED TO DESIGN IN THE STATE OF
 FLORIDA).
  
 PLEASE NOTE THAT THE MAIN PERMIT FOR THE PROJECT
 (#17010884) WAS APPROVED BY REQUEST WITH A LIST OF
 DEFERRED SUBMITTALS THAT MUST BE ADDRESSED UNDER THIS
 SUBMITTAL APPLICATION, OR UNDER A SEPARATE SUBMITTAL
 APPLICATION. PLEASE SEE THE LIST ON SHEET CVR OF THE
 PERMITTED PLANS, AND ALSO PRINTED BELOW.
  
 5) PROVIDE AN EQUIPMENT SCHEDULE FOR THE BOILER, BOILER
 VENT PIPE, AND SUBMIT MANUFACTURER'S SPECIFICATIONS FOR
 EACH. PROVIDE A DIMENSIONED ELEVATION VIEW THAT
 INDICATES THE TOTAL VENT RUN FROM THE OUTLET OF THE
 BOILER TO THE TERMINATION CAP ABOVE THE ROOF. INDICATE
 HOW THE VENT WILL BE SUPPORTED AND ANCHORED TO THE ROOF
 STRUCTURE.
  
 6) PROVIDE STEAM PIPING DRAWINGS THAT SHOW THE PIPING
 RUNS, TYPES AND SIZES OF PIPE AND PIPE INSULATION.
  
 7) M2.1: PROVIDE A COMBUSTION AIR CALCULATION FOR THE
 BOILER PER SECTION 304 FBC-14 FUEL GAS. IT APPEARS BY
 THE DRAWING THAT THE ONE-PERMANENT-OPENING METHOD IS
 BEING PROVIDED. PLEASE SEE SECTION 304.6.2 AND RELOCATE
 THE OPENING OF THE AIR INTAKE TO A LOCATION WITHIN 12
 INCHES OF THE TOP OF THE ENCLOSURE.
  
 8) PROVIDE AN EQUIPMENT PLAN AND SCHEDULES FOR THE
 BREWERY TANKS AND KETTLES. LABEL EACH PIECE OF
 EQUIPMENT AND SHOW THE REQUIRED WORKING CLEARANCES.
 PLEASE NOTE COMPLIANCE WITH SECTION 1003.1 MAY BE
 REQUIRED FOR THE EQUIPMENT.
  
 9) PROVIDE AN EQUIPMENT SCHEDULE FOR THE CHILLER, AND
 CHILLED WATER PIPING PLANS THAT SHOW PIPING RUNS, TYPES
 AND SIZES OF PIPES AND PIPE INSULATIONS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-06-29 Cont ID  
Sent By tklarge Date 2018-06-29 Time 14:50 Rev Time 0.00
Received By tklarge Date 2018-06-29 Time 14:09 Sent To I
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-05-13 Cont ID  
Sent By tklarge Date 2018-05-13 Time 13:32 Rev Time 0.00
Received By tklarge Date 2018-05-12 Time 09:50 Sent To  
Notes
2018-05-13 13:13:22THE FOLLOWING PROVISOS WERE PLACED ON THE ORIGINAL SET
 OF PLANS AS THESE ITEMS HAVE NOT BEEN ADDRESSED AS YET.
 SUBMIT ALL THE REQUIRED DOCUMENTATION, SPECIFICATIONS,
 DRAWINGS AND INFORMATION LISTED IN THE PROVISOS.
 NOTE: PERMIT #18040927 WAS ISSUED WITH ONLY AN
 APPLICATION BEING SUBMITTED. IT DOES NOT APPEAR AS
 THOUGH ANY PLANS ADDRESSING MY PROVISOS HAVE BEEN
 SUBMITTED.
  
 THE FOLLOWING ITEMS WILL BE CONSIDERED DEFERRED
 SUBMITTALS. COMPLETE PLANS AND SPECIFICATIONS SHALL BE
 SUBMITTED FOR REVIEW FOR THE FOLLOWING ITEMS PRIOR TO
 THE INSTALLATION OF NOTED SYSTEMS:
 1) BOILER AND ASSOCIATED PIPING AND VENT - SUBMIT AN
 EQUIPMENT SCHEDULE FOR THE BOILER, BOILER VENT PIPE(S),
 AND MANUFACTURER'S SPECIFICATIONS FOR EACH. PROVIDE A
 DIMENSIONAL ELEVATION VIEW THAT SHOWS THE TOTAL VENT
 RUN FROM THE OUTLET OF THE BOILER TO THE TERMINATION
 CAP ABOVE THE ROOF. SHOW HOW THE VENT WILL BE SUPPORTED
 AND ANCHORED TO THE ROOF STRUCTURE.
 2) STEAM PIPING - PROVIDE STEAM PIPING DRAWINGS THAT
 SHOW THE PIPING RUNS, TYPES AND SIZES OF PIPES & PIPE
 INSULATION.
 3) SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE,
 TERMINATION POINT, HEIGHT ABOVE THE ROOF AND ANCHORING
 DETAILS OF THE GAS VENT(S) PER 2014 FBC-FUEL GAS SECS.
 502 THRU 505.
 ADDITIONAL COMMENTS:
 4) THE SUBMITTED PLANS FROM DME BREWING SOLUTIONS ARE
 SCHEMATIC THAT WILL REQUIRE MODIFICATIONS TO DEPICT THE
 ACTUAL FIELD INSTALLATION.THE DRAWINGS WILL ALSO
 REQUIRE SHOP DRAWING APPROVALS STAMPS BY THE MEP
 ENGINEER OF RECORD (PLEASE NOTE THAT DME BREWING
 SOLUTIONS IS A CANADIAN COMPANY WITH CANADIAN ENGINEERS
 THAT ARE NOT LICENSED TO DESIGN IN THE STATE OF
 FLORIDA).
 5) PROVIDE A COMBUSTION AIR CALCULATION FOR THE BOILER
 PER SECTION 304 FBC-14 FUEL GAS.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  