Plan Review Details - Permit 18041054
Plan Review Stops For Permit 18041054
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2018-06-19 Cont ID  
Sent By rmcdouga Date 2018-06-19 Time 11:33 Rev Time 0.00
Received By rmcdouga Date 2018-06-19 Time 11:19 Sent To I
Notes
2018-06-19 11:27:43FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-06-11 Cont ID  
Sent By rmcdouga Date 2018-06-11 Time 13:39 Rev Time 0.00
Received By rmcdouga Date 2018-06-11 Time 13:39 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-05-03 Cont ID  
Sent By rmcdouga Date 2018-05-03 Time 08:24 Rev Time 0.00
Received By rmcdouga Date 2018-05-03 Time 08:07 Sent To I
Notes
2018-05-03 08:44:57PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE PLANS SHOW A SPA LOCATED IN THE CENTER OF A POOL
 OF WATER THAT IS ONLY 6 INCHES DEEP. THE WATER HAS TO
 BE OVER 24 INCHES DEEP IN ORDER TO MEET THE DEFINITION
 OF A SWIMMING POOL. THIS WOULD BE CONSIDERED A WADING
 POOL. FBC R 4501.2
  
 2) PROVIDE POOL AND SPA SECTION DETAILS THAT ACCURATELY
 REFLECT THE PROPOSED CONSTRUCTION. SHOW THE DEPTH OF
 THE POOL AND THE HEIGHT OF THE SPA WALLS ABOVE THE
 SURROUNDING WADING POOL. FBC 107.2.1

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2018-06-19 Cont ID  
Sent By rmcdouga Date 2018-06-19 Time 11:23 Rev Time 0.00
Received By rmcdouga Date 2018-06-19 Time 11:23 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-06-06 Cont ID  
Sent By jleahy Date 2018-06-06 Time 15:24 Rev Time 0.00
Received By jleahy Date 2018-06-06 Time 15:24 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-04-27 Cont ID  
Sent By jleahy Date 2018-04-27 Time 16:19 Rev Time 0.00
Received By jleahy Date 2018-04-27 Time 16:19 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status N Date 2018-06-07 Cont ID  
Sent By tklarge Date 2018-06-07 Time 03:15 Rev Time 0.00
Received By tklarge Date 2018-06-07 Time 03:15 Sent To  
Notes
2018-06-07 03:15:22THERE IS NO GAS ON THIS POOL. TKL.
  

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-06-07 Cont ID  
Sent By tklarge Date 2018-04-30 Time 13:49 Rev Time 0.00
Received By tklarge Date 2018-04-30 Time 13:41 Sent To  
Notes
2018-04-30 13:51:37THERE IS NO GAS ON THIS POOL. TKL.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-06-19 Cont ID  
Sent By rmcdouga Date 2018-06-19 Time 11:33 Rev Time 0.00
Received By rmcdouga Date 2018-06-12 Time 13:40 Sent To  
Notes
2018-06-14 13:40:38RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-06-11 Cont ID  
Sent By rmcdouga Date 2018-06-11 Time 13:39 Rev Time 0.00
Received By rmcdouga Date 2018-05-24 Time 13:14 Sent To  
Notes
2018-06-07 06:06:286/7 TO RM DESK
  
2018-05-25 13:14:59RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-05-03 Cont ID  
Sent By rmcdouga Date 2018-05-03 Time 08:48 Rev Time 0.00
Received By rmcdouga Date 2018-04-23 Time 12:32 Sent To  
Notes
2018-04-24 12:32:58ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 3 Status P Date 2018-06-19 Cont ID  
Sent By tklarge Date 2018-06-19 Time 07:20 Rev Time 0.00
Received By tklarge Date 2018-06-19 Time 06:38 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2018-06-07 Cont ID  
Sent By tklarge Date 2018-06-07 Time 03:15 Rev Time 0.00
Received By tklarge Date 2018-06-07 Time 03:05 Sent To  
Notes
2018-06-07 03:14:481) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS AS REQUIRED
 BY ANSI/APSP/ ICC-7 2013 SEC. 4.4.9, 4.4.9.1. THE
 MAXIMUM FLOW OF THE PUMP FROM THE PUMP CURVE IS NO
 LONGER PERMITTED TO BE USED.THE FLOW RATE SHALL BE
 DETERMINED BY USING COMPLETE SYSTEM TDH CALCULATIONS
 AND THEN LOOKING UP THE FLOW RATE USING THE
 MANUFACTURER'S CERTIFIED PUMP CURVE.2ND REQUEST.
 YOU HAVE PROVIDED THE TDH BUT WHERE ARE THE
 CALCULATIONS AS TO HOW YOU ARRIVED AT THIS NUMBER?
 2) SUBMIT TWO COPIES OF THE PUMP CURVE. THE TOTAL
 DYNAMIC HEAD MUST BE MATCHED AGAINST THE PUMP CURVE TO
 DETERMINE THE MAXIMUM SSYSTEM FLOW FOR THE SPECIFIC
 TDH. PLEASE REFER TO THE VERBIAGE IN COMMENT #1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-04-30 Cont ID  
Sent By tklarge Date 2018-04-30 Time 13:40 Rev Time 0.00
Received By tklarge Date 2018-04-30 Time 13:40 Sent To  
Notes
2018-04-30 13:50:401) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS AS REQUIRED
 BY ANSI/APSP/ ICC-7 2013 SEC. 4.4.9, 4.4.9.1. THE
 MAXIMUM FLOW OF THE PUMP FROM THE PUMP CURVE IS NO
 LONGER PERMITTED TO BE USED.THE FLOW RATE SHALL BE
 DETERMINED BY USING COMPLETE SYSTEM TDH CALCULATIONS
 AND THEN LOOKING UP THE FLOW RATE USING THE
 MANUFACTURER'S CERTIFIED PUMP CURVE.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop Z ZONING
Rev No 2 Status P Date 2018-05-29 Cont ID  
Sent By mcruz Date 2018-05-29 Time   Rev Time 0.00
Received By mcruz Date 2018-05-29 Time 14:07 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2018-04-26 Cont ID  
Sent By ajones Date 2018-04-26 Time 16:56 Rev Time 0.00
Received By ajones Date 2018-04-26 Time 16:56 Sent To I
Notes
2018-04-26 16:59:534/26/18- FAILED-
 1. SURVEY AND SITE PLANS SHOW DIFFERENT LOCATIONS FOR
 THE POOL/SPA.
 2. THE ZONING AND LAND DEVELOLPMENT REGULATIONS REQUIRE
 A 5 FOOT SETBACK FROM THE WATER EDGE TO THE SIDE AND
 REAR PROPERTY LINES.
  