Plan Review Details - Permit 18040871
Plan Review Stops For Permit 18040871
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-04-23 Cont ID  
Sent By jleahy Date 2018-04-23 Time 15:55 Rev Time 0.00
Received By jleahy Date 2018-04-23 Time 15:55 Sent To P
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2018-07-18 Cont ID  
Sent By tklarge Date 2018-07-18 Time 06:56 Rev Time 0.00
Received By tklarge Date 2018-07-16 Time 08:55 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2018-06-25 Cont ID  
Sent By tklarge Date 2018-06-25 Time 14:05 Rev Time 0.00
Received By tklarge Date 2018-06-25 Time 13:42 Sent To I
Notes
2018-06-25 13:48:231) INDICATE ON THE PLAN WHICH GAS SIZING TABLE IS BEING
 USED FOR THE SIZING OF THE LOW PRESSURE SYSTEM. THERE
 IS NO REFERENCE TO ANY TABLE. 2014 FBC-FUEL GAS
 SEC.402.3.
 2) THE SIZE OF THE HORIZONTAL GAS PIPING TO THE DRYERS
 MAY NOT BE ABLE TO BE 1/2" AS STATED IN THE PLAN REVIEW
 RESPONSE. THE SIZE WILL DEPEND ON THE SIZING TABLE
 BEING USED. THE PREVIOUS PLANS REFER TO TABLE 402.4 (1)
 FOR THE LOW PRESSURE SYSTEM AND THE 1/2 INCH LINE WILL
 NOT SUPPORT 495,000 BTU'S.
 3) MANUFACTURER'S INSTALLATION INSTRUCTIONS AND
 SPECIFICATIONS FOR THE REGULATORS, TANKLESS WATER
 HEATERS AND THE FLEX CONNECTOR FOR THE GENERATOR SHALL
 BE ONSITE FOR INSPECTION.
 4) SHT. P3.0 SHOWS THE GAS REGULATOR TO BE VENTED TO
 THE EXTERIOR AND SHT. P4.2 NOTES THE REGULATOR AS A
 NON-VENTING REGULATOR. WHICH IS IT? CLARIFY.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-06-03 Cont ID  
Sent By tklarge Date 2018-06-03 Time 04:11 Rev Time 0.00
Received By tklarge Date 2018-06-03 Time 04:10 Sent To  
Notes
2018-06-03 04:12:091) SUBMIT THE ADDITIONAL SHEETS FOR THE MANUFACTURER'S
 SPECIFICATIONS FOR THE TANKLESS WATER HEATERS. THERE
 ARE A TOTAL OF 2 OR 3 SHHETS. THE SPECIFICATIONS MUST
 SHOW THE WATER HEATER IS LISTED AND LABELED PER THE
 2014 FBC-FUEL GAS SEC. 301.3.TWO COPIES OF THE
 SPECIFICATIONS ARE REQUIRED PER WPB AMEND. TO FBC SEC.
 107.2.1.
 2) SHT. P1.0 - SHOW THE LOCATION OF THE GAS METER ON
 THE PLAN. WPB AMEND. TO FBC SEC. 107.2.1.
 3) SHOW THE LOCATION OF THE MP REGULATOR FOR THE
 GENERATOR.WPB AMEND. TO FBC SEC. 107.2.1.
 4) SHOW THE SIZE OF THE HORIZONTAL GAS PIPNG TO THE
 DRYERS.
 5) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FLEX
 CONNECTOR FOR THE GENERATOR. THE FLEX CONNECTOR SHALL
 BE APPROVED TO FLOW THE MAXIMUM BTU LOAD FOR THE
 GENERATOR. 2017 FBCR SEC. 411.1.3.2.THE CONNECTOR SHALL
 HAVE THE CAPACITY FOR THE TOTAL DEMAND OF THE CONNECTED
 APPLIANCE 2014 FBC-FUEL GAS SEC. 411.1.3.2.
 6) SHT. P4.2 - THE GAS SYSTEM SIZING AT THE METER IS
 STILL OVERSIZED. YOU SHOW THE SYSTEM AS BEING 2 PSI
 FROM THE GAS PURVEYOR ON SHT. P3.0 AND ALSO NOTE THIS
 ON SHT.P4.2. YOU SHOW AN MP REGULATOR ON THE GAS MAIN
 DOWNSSTREAM OF THE GAS METER AND SHUTOFF VALVE. WHAT IS
 THE PRESSURE ON THE SYSTEM DOWNSTREAM OF THIS
 REGULATOR? IF INDEED IT IS LESS THAN 2 PSI AT THIS
 POINT THEN ALL YOUR PE IS UNDERSIZED. THE PE PIPE WOULD
 HAVE TO BE OVER 4 INCHES IN DIAMETER TO HANDLE THE
 TOTAL BTU LOAD AT 250 FEET IN LENGTH. SECONDLY, IT IS
 NOT EVEN POSSIBLE TO SUPPLY A 2 INCH PE LINE FROM A 5
 INCH LINE AT THE SAME LOW PRESSURE.THE PLAN SHOWS MP
 REGULATORS SUPPLYING THE GAS EQUIPMENT/APPLIANCES. IF
 THE SYSTEM IS LESS THAN 2 PSI IN THE STRUCTURE, WHY THE
 NEED FOR THE REGULATORS? REMOVE THE REGULATOR
 DOWNSTREAM OF THE METER AND THE SIZE OF THE SCH. 40
 METALLIC PIPE FOR A 2 PSI SYSTEM DOWNSTREAM OF THE GAS
 METER CAN BE 2 INCH BASED ON 2014 FBC-FUEL GAS TABLE
 402.4 (5). AS DESIGNED, THE SYSTEM IS CONFUSING AND
 DOES NOT CCOMPLY WITH THE GAS CODE.
  
 NOTE: I SUGGEST CONTACTING THIS PLAN REVIEWER TO
 DISCUSS THE SIZING OF THE GAS SYSTEM.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date   Cont ID  
Sent By   Date 2018-07-25 Time   Rev Time 0.00
Received By lmarchan Date 2018-07-24 Time 10:26 Sent To  
Notes
2018-07-25 10:26:42RESUB ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date   Cont ID  
Sent By   Date 2018-07-18 Time   Rev Time 0.00
Received By lmarchan Date 2018-07-06 Time 10:44 Sent To  
Notes
2018-07-11 10:44:45RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2018-06-25 Cont ID  
Sent By tklarge Date 2018-06-25 Time 14:06 Rev Time 0.00
Received By tklarge Date 2018-06-15 Time 09:51 Sent To  
Notes
2018-06-19 09:51:19RESUB ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-06-05 Cont ID  
Sent By ccole Date 2018-06-05 Time 09:23 Rev Time 0.00
Received By ccole Date 2018-05-24 Time 13:46 Sent To  
Notes
2018-05-25 13:46:58RESUB OF REVISION ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-05-25 Cont ID  
Sent By lmarchan Date 2018-05-25 Time 13:45 Rev Time 0.00
Received By lmarchan Date 2018-05-24 Time 10:47 Sent To  
Notes
2018-05-24 10:48:12INSPECTION LOGS ROUTED TO DOUG HARVEY PER HIS
 INSTRUCTIONS

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2018-04-27 Time   Rev Time 0.00
Received By lmarchan Date 2018-04-19 Time 14:58 Sent To  
Notes
2018-04-20 14:58:18REVISION ROUTED TO JLEAHY

Review Stop M MECHANICAL (A/C)
Rev No 5 Status P Date 2018-07-25 Cont ID  
Sent By ccole Date 2018-07-25 Time 17:25 Rev Time 0.00
Received By ccole Date 2018-07-25 Time 17:25 Sent To I
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 4 Status F Date 2018-07-18 Cont ID  
Sent By ccole Date 2018-07-18 Time 10:57 Rev Time 0.00
Received By ccole Date 2018-07-18 Time 10:57 Sent To I
Notes
2018-07-18 11:05:204TH REVIEW FBC-2014 MECHANICAL
 MASTER PERMIT #16110067
 REVISION PERMIT #18040871
 6/5//18
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) THIS IS THE 4TH REQUEST FOR COMPLETE ENGINEERING FOR
 INSTALLATION OF THE RTU'S AND DOAS-1. THE CORRECTED AND
 RESUBMITTED PLANS ARE PROVIDING ONLY THE UNIT
 ATTACHMENT TO THE CURBS BUT THE REMAINING DETAILS HAVE
 NOT BEEN PROVIDED. AS A RESULT, I HAVE CALLED THE MEP
 ENGINEER OF RECORD BRUCE CIARLARIELLO PE. WHO STATED
 THAT THE REMAINING DETAILS-
  
 ROOF OPENING FRAMING AND CURB TO ROOF STRUCTURE
 ATTACHMENT- ARE THE RESPONSIBILTY OF THE STRUCTURAL
 ENGINEER. PLEASE SEE COMMENT #1 FROM THE 1ST REVIEW
 DATED 4/27/18.
  
 2) PROVIDE COMPLETE ENGINEERED DETAILS FOR INSTALLATION
 OF THE NEW RTU'S INCLUDING THE NEW ROOF OPENINGS AND
 REINFORCEMENTS, CURB ATTACHMENTS TO THE STRUCTURE, AND
 UNIT ATTACHEMENTS TO THE CURBS- SECTION 301.15
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
  
 UPON RECEIPT OF THESE COMMENTS, PLEASE CONTACT ME AT
 YOUR EARLIEST CONVENIENCE.
  
 THANK YOU,
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2018-06-21 Cont ID  
Sent By ccole Date 2018-06-21 Time 15:02 Rev Time 0.00
Received By ccole Date 2018-06-21 Time 12:03 Sent To  
Notes
2018-06-21 15:13:483RD REVIEW FBC-2014 MECHANICAL
 MASTER PERMIT #16110067
 REVISION PERMIT #18040871
 6/5//18
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET M3.0: THE REQUESTED WIND LOAD ENGINEERING FOR
 THE RTU AND DOAS INSTALLATIONS IS INCOMPLETE. DETAILS
 LACKING: A) THE ROOF OPENING FRAMING AND
 REINFORCEMENTS. B) THE CURB ATTACHMENT TO THE ROOF
 STRUCTURE. C) THE LENGTH OF THE 1/2" ANCHOR BOLTS
 SPECIFIED TO ANCHOR THE DOAS TO THE CURB. D)
 MANUFACTURER'S SPECIFICATIONS FOR THE FACTORY CURBS.
  
 PLEASE NOTE THAT THE REMAINING ENGINEERING CAN BE A
 DEFERRED SUBMITTAL BY REQUEST.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2018-06-05 Cont ID  
Sent By ccole Date 2018-06-05 Time 09:10 Rev Time 0.00
Received By ccole Date 2018-06-04 Time 17:47 Sent To I
Notes
2018-06-05 09:14:472ND REVIEW FBC-2014 MECHANICAL
 MASTER PERMIT #16110067
 REVISION PERMIT #18040871
 6/5//18
  
 1) THE PLANS WERE RESUBMITTED WITHOUT ANY CORRECTIONS
 OR REVISIONS MADE TO THE MECHANICAL DRAWINGS BASED ON
 THE 1ST REVIEW COMMENTS. I HAVE REPRINTED THE 1ST
 REVIEW COMMENTS BELOW: PLEASE COMPLY.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
  
 1ST REVIEW FBC-2014 MECHANICAL
 MASTER PERMIT #16110067
 REVISION PERMIT #18040871
 4/27/18
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) THE CHANGE FROM FAN COIL SYSTEMS TO THE NEW RTU'S
 WILL REQUIRE UPDATES AND REVISIONS TO SHEETS M3.2
 (EQUIPMENT SCHEDULES), M3.3 (PRESSURIZATION CALCULATION
 TABLES AND HEAT PUMP SCHEDULE), & M4 (CONTROL
 DIAGRAMS). PLEASE PROVIDE THE REVISED SHEETS AND LIST
 THE REVISION NUMBERS AND DATES IN THE MARGINS OF ALL
 THE REVISED SHEETS- SECTION 107.2.1 WEST PALM BEACH
  
 AMENDMENTS TO THE FBC-14.
  
 2) PROVIDE COMPLETE ENGINEERED DETAILS FOR INSTALLATION
 OF THE NEW RTU'S INCLUDING THE NEW ROOF OPENINGS AND
 REINFORCEMENTS, CURB ATTACHMENTS TO THE STRUCTURE, AND
 UNIT ATTACHEMENTS TO THE CURBS- SECTION 301.15
  
 3) M1.2, NOTE #5: SUPPORT SPACING FOR CONDENSATE PIPING
 SHALL BE 4'-0" O.C.- TABLE 305.4
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2018-04-27 Cont ID  
Sent By ccole Date 2018-04-27 Time 09:36 Rev Time 0.00
Received By ccole Date 2018-04-27 Time 09:18 Sent To I
Notes
2018-04-27 10:01:541ST REVIEW FBC-2014 MECHANICAL
 MASTER PERMIT #16110067
 REVISION PERMIT #18040871
 4/27/18
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) THE CHANGE FROM FAN COIL SYSTEMS TO THE NEW RTU'S
 WILL REQUIRE UPDATES AND REVISIONS TO SHEETS M3.2
 (EQUIPMENT SCHEDULES), M3.3 (PRESSURIZATION CALCULATION
 TABLES AND HEAT PUMP SCHEDULE), & M4 (CONTROL
 DIAGRAMS). PLEASE PROVIDE THE REVISED SHEETS AND LIST
 THE REVISION NUMBERS AND DATES IN THE MARGINS OF ALL
 THE REVISED SHEETS- SECTION 107.2.1 WEST PALM BEACH
  
 AMENDMENTS TO THE FBC-14.
  
 2) PROVIDE COMPLETE ENGINEERED DETAILS FOR INSTALLATION
 OF THE NEW RTU'S INCLUDING THE NEW ROOF OPENINGS AND
 REINFORCEMENTS, CURB ATTACHMENTS TO THE STRUCTURE, AND
 UNIT ATTACHEMENTS TO THE CURBS- SECTION 301.15
  
 3) M1.2, NOTE #5: SUPPORT SPACING FOR CONDENSATE PIPING
 SHALL BE 4'-0" O.C.- TABLE 305.4
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 4 Status P Date 2018-07-18 Cont ID  
Sent By tklarge Date 2018-07-18 Time 06:56 Rev Time 0.00
Received By tklarge Date 2018-07-16 Time 08:55 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status F Date 2018-06-25 Cont ID  
Sent By tklarge Date 2018-06-25 Time 13:42 Rev Time 0.00
Received By tklarge Date 2018-06-25 Time 08:27 Sent To  
Notes
2018-06-25 13:42:001) MEANS FOR CONTROLLING EXPANSION SHALL BE PROVIDED BY
 AN EXPANSION TANK OR A THERMAL EXPANSION VALVE. ANY
 PRESSURE INCREASES DUE TO THERMAL EXPANSION OF THE
 WATER BEING HEATED MUST BE CONTROLLED TO PREVENT THE
 PRESSURE DOWNSTREAM OF A PRESSURE - REDUCING VALVE FROM
 BECOMING GREATER THAN THE SETTING OF THE VALVE.2014
 FBC-PLUMBING SEC.607.3 .
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2018-06-03 Cont ID  
Sent By tklarge Date 2018-06-03 Time 03:56 Rev Time 0.00
Received By tklarge Date 2018-06-03 Time 02:23 Sent To M
Notes
2018-06-03 03:53:201) SUBMIT THE ADDITIONAL SHEETS FOR THE MANUFACTURER'S
 SPECIFICATIONS FOR THE TANKLESS WATER HEATERS. THERE
 ARE A TOTAL OF 2 OR 3 SHHETS. THE SPECIFICATIONS MUST
 SHOW THE WATER HEATER IS LISTED AND LABELED PER THE
 2014 FBC-FUEL GAS SEC. 301.3.TWO COPIES OF THE
 SPECIFICATIONS ARE REQUIRED PER WPB AMEND. TO FBC SEC.
 107.2.1.
 2) MEANS SHALL BE PROVIDED FOR THERMAL EXPANSION FOR
 THE HOT WATER SYSTEM SINCE THESE TANKLESS WATER HEATERS
 ARE EQUIPPED WITH A BUFFER TANK AND A RECIRCULATION
 PUMP. 2014 FBC-PLUMBING SEC.607.3.
 3) THE ENTIRE RECIRCULATING LINE SHALL BE INSULATED
 WITH MINIMUM 1 INCH INSULATION INCLUDING THE FIRST 8
 FEET OF ALL BRANCH LINES PER 2014 FBC-PLUMBING SEC.
 607.5 , 2014 ENERGY CODE SEC. C404.5.
 4) SHT. P1.0 - SHOW THE LOCATION OF THE GAS METER ON
 THE PLAN. WPB AMEND. TO FBC SEC. 107.2.1.
 5) SHOW THE LOCATION OF THE MP REGULATOR FOR THE
 GENERATOR.WPB AMEND. TO FBC SEC. 107.2.1.
 6) SHOW THE SIZE OF THE HORIZONTAL GAS PIPNG TO THE
 DRYERS.
 7) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FLEX
 CONNECTOR FOR THE GENERATOR. THE FLEX CONNECTOR SHALL
 BE APPROVED TO FLOW THE MAXIMUM BTU LOAD FOR THE
 GENERATOR. 2017 FBCR SEC. 411.1.3.2.THE CONNECTOR SHALL
 HAVE THE CAPACITY FOR THE TOTAL DEMAND OF THE CONNECTED
 APPLIANCE 2014 FBC-FUEL GAS SEC. 411.1.3.2.
 8) SHT. P4.2 - THE GAS SYSTEM SIZING AT THE METER IS
 STILL OVERSIZED. YOU SHOW THE SYSTEM AS BEING 2 PSI
 FROM THE GAS PURVEYOR ON SHT. P3.0 AND ALSO NOTE THIS
 ON SHT.P4.2. YOU SHOW AN MP REGULATOR ON THE GAS MAIN
 DOWNSSTREAM OF THE GAS METER AND SHUTOFF VALVE. WHAT IS
 THE PRESSURE ON THE SYSTEM DOWNSTREAM OF THIS
 REGULATOR? IF INDEED IT IS LESS THAN 2 PSI AT THIS
 POINT THEN ALL YOUR PE IS UNDERSIZED. THE PE PIPE WOULD
 HAVE TO BE OVER 4 INCHES IN DIAMETER TO HANDLE THE
 TOTAL BTU LOAD AT 250 FEET IN LENGTH. SECONDLY, IT IS
 NOT EVEN POSSIBLE TO SUPPLY A 2 INCH PE LINE FROM A 5
 INCH LINE AT THE SAME LOW PRESSURE.THE PLAN SHOWS MP
 REGULATORS SUPPLYING THE GAS EQUIPMENT/APPLIANCES. IF
 THE SYSTEM IS LESS THAN 2 PSI IN THE STRUCTURE, WHY THE
 NEED FOR THE REGULATORS? REMOVE THE REGULATOR
 DOWNSTREAM OF THE METER AND THE SIZE OF THE SCH. 40
 METALLIC PIPE FOR A 2 PSI SYSTEM DOWNSTREAM OF THE GAS
 METER CAN BE 2 INCH BASED ON 2014 FBC-FUEL GAS TABLE
 402.4 (5). AS DESIGNED, THE SYSTEM IS CONFUSING AND
 DOES NOT CCOMPLY WITH THE GAS CODE.
  
 NOTE: I SUGGEST CONTACTING THIS PLAN REVIEWER TO
 DISCUSS THE SIZING OF THE GAS SYSTEM.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-04-24 Cont ID  
Sent By tklarge Date 2018-04-24 Time 09:26 Rev Time 0.00
Received By tklarge Date 2018-04-24 Time 06:00 Sent To  
Notes
2018-04-24 09:26:361) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATIONS FOR THE NAVIEN TANKLESS WATER HEATERS.
 WPB AMEND. TO FBC SEC. 107.2.1, 2014 FBC-FUEL GAS
 SEC.305.1. THE INSTALLATION MANUAL SHALL BE ONSITE FOR
 INSPECTION.
 2) SHT. P-3 - DETAIL 7 NOTES "GAS PRESSURE REGULATOR
 REDUCE GAS TO 2" WC." IS THIS SUPPOSED TO READ 2 PSI?
 CLARIFY.
 3) SHT. P1.0 - DETAIL 1 - INDICATE THE TYPE OF MATERIAL
 TO BE USED FOR THE EXHAUST AND INTAKE VENTS OF THE
 TANKLESS WATER HEATERS.. THE TYPE OF MATERIAL SHALL
 COMPLY WITH THE REQUIREMENTS OF THE NAVIEN INSTALLATION
 MANUAL.
 4) SHT. P4.2 - GAS FIXTURE LOAD SUMMARY - PLEASE REVISE
 THE TOTAL LOAD TO 4066.6 BTU'S.
 5) SHT. P4.2 - IF THE GAS PRESSURE IS 2 PSI COMING FROM
 THE GAS UTILITY WHY IS 5 INCH SCH. 40 BEING INSTALLED
 DOWNSTREAM OF THE GAS METER AND NEW GAS REGULATOR? THE
 5 INCH LINE IS OVERSIZED.CLARIFY.
 6) SIZE THE SCH. 40 LINE IN ITS ENTIRETY FROM THE GAS
 METER TO THE GROUND PENETRATION POINT.
 7) SHOW THE DISTANCE FROM EACH MP REGULATOR TO THE MOST
 REMOTE OUTLET ON EACH BRANCH LINE PER THE 2017 FBC-FUEL
 GAS SEC.402.4.1, 402.4.2.
 8) SHOW THE LOCATION OF ALL MEDIUM PRESSURE REGULATORS.
 WPB AMEND. TO FBC SEC. 107.2.1.
 9) SHT. P4.1 - SIZE THE HOT WATER RECIRCULATION LINE TO
 THE TANKLESS WATER HEATERS.
 10) SHT. 3.0 - DETAIL 7 SHOWS A 3/4 INCH GAS LINE TO
 THE TANKLESS WATER HEATERS BUT SHEET P4.2 SHOWS A 2
 INCH GAS LINE.CLARIFY.
 11) SHT.P3.0 - DETAIL 7 - IN ADDITION TO SHOWING A 3/4
 GAS CONNECTION TO THE TANKLESS WATER HEATERS, THE
 PIPING DIAGRAM SHOWS FOUR ADDITIONAL OUTLETS THAT
 APPEAR TO BE SEDIMENT TRAPS.IF THAT IS THE INTENT, THE
 LOCATION OF THESE TRAPS WILL ACCOMPLISH NOTHING.
 CLARIFY. SEDIMENT TRAPS SHALL BE LOCATED IN ACCORDANCE
 WITH THE 2017 FBC-FUEL GAS SEC. 408.4.
 12) SHOW THE LOCATION OF THE EXHAUST AND INTAKE VENTS
 ON THE PARTIAL ROOF PLAN. WPB AMEND. TO FBC SEC.
 107.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved