| Plan Review Stops For Permit 18040871 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2018-04-23 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-04-23 |
Time |
15:55 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-04-23 |
Time |
15:55 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
3 |
Status |
P |
Date |
2018-07-18 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-07-18 |
Time |
06:56 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-07-16 |
Time |
08:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2018-06-25 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-06-25 |
Time |
14:05 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-06-25 |
Time |
13:42 |
Sent To |
I |
|
| Notes |
| 2018-06-25 13:48:23 | 1) INDICATE ON THE PLAN WHICH GAS SIZING TABLE IS BEING | | | USED FOR THE SIZING OF THE LOW PRESSURE SYSTEM. THERE | | | IS NO REFERENCE TO ANY TABLE. 2014 FBC-FUEL GAS | | | SEC.402.3. | | | 2) THE SIZE OF THE HORIZONTAL GAS PIPING TO THE DRYERS | | | MAY NOT BE ABLE TO BE 1/2" AS STATED IN THE PLAN REVIEW | | | RESPONSE. THE SIZE WILL DEPEND ON THE SIZING TABLE | | | BEING USED. THE PREVIOUS PLANS REFER TO TABLE 402.4 (1) | | | FOR THE LOW PRESSURE SYSTEM AND THE 1/2 INCH LINE WILL | | | NOT SUPPORT 495,000 BTU'S. | | | 3) MANUFACTURER'S INSTALLATION INSTRUCTIONS AND | | | SPECIFICATIONS FOR THE REGULATORS, TANKLESS WATER | | | HEATERS AND THE FLEX CONNECTOR FOR THE GENERATOR SHALL | | | BE ONSITE FOR INSPECTION. | | | 4) SHT. P3.0 SHOWS THE GAS REGULATOR TO BE VENTED TO | | | THE EXTERIOR AND SHT. P4.2 NOTES THE REGULATOR AS A | | | NON-VENTING REGULATOR. WHICH IS IT? CLARIFY. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2018-06-03 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-06-03 |
Time |
04:11 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-06-03 |
Time |
04:10 |
Sent To |
|
|
| Notes |
| 2018-06-03 04:12:09 | 1) SUBMIT THE ADDITIONAL SHEETS FOR THE MANUFACTURER'S | | | SPECIFICATIONS FOR THE TANKLESS WATER HEATERS. THERE | | | ARE A TOTAL OF 2 OR 3 SHHETS. THE SPECIFICATIONS MUST | | | SHOW THE WATER HEATER IS LISTED AND LABELED PER THE | | | 2014 FBC-FUEL GAS SEC. 301.3.TWO COPIES OF THE | | | SPECIFICATIONS ARE REQUIRED PER WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | 2) SHT. P1.0 - SHOW THE LOCATION OF THE GAS METER ON | | | THE PLAN. WPB AMEND. TO FBC SEC. 107.2.1. | | | 3) SHOW THE LOCATION OF THE MP REGULATOR FOR THE | | | GENERATOR.WPB AMEND. TO FBC SEC. 107.2.1. | | | 4) SHOW THE SIZE OF THE HORIZONTAL GAS PIPNG TO THE | | | DRYERS. | | | 5) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FLEX | | | CONNECTOR FOR THE GENERATOR. THE FLEX CONNECTOR SHALL | | | BE APPROVED TO FLOW THE MAXIMUM BTU LOAD FOR THE | | | GENERATOR. 2017 FBCR SEC. 411.1.3.2.THE CONNECTOR SHALL | | | HAVE THE CAPACITY FOR THE TOTAL DEMAND OF THE CONNECTED | | | APPLIANCE 2014 FBC-FUEL GAS SEC. 411.1.3.2. | | | 6) SHT. P4.2 - THE GAS SYSTEM SIZING AT THE METER IS | | | STILL OVERSIZED. YOU SHOW THE SYSTEM AS BEING 2 PSI | | | FROM THE GAS PURVEYOR ON SHT. P3.0 AND ALSO NOTE THIS | | | ON SHT.P4.2. YOU SHOW AN MP REGULATOR ON THE GAS MAIN | | | DOWNSSTREAM OF THE GAS METER AND SHUTOFF VALVE. WHAT IS | | | THE PRESSURE ON THE SYSTEM DOWNSTREAM OF THIS | | | REGULATOR? IF INDEED IT IS LESS THAN 2 PSI AT THIS | | | POINT THEN ALL YOUR PE IS UNDERSIZED. THE PE PIPE WOULD | | | HAVE TO BE OVER 4 INCHES IN DIAMETER TO HANDLE THE | | | TOTAL BTU LOAD AT 250 FEET IN LENGTH. SECONDLY, IT IS | | | NOT EVEN POSSIBLE TO SUPPLY A 2 INCH PE LINE FROM A 5 | | | INCH LINE AT THE SAME LOW PRESSURE.THE PLAN SHOWS MP | | | REGULATORS SUPPLYING THE GAS EQUIPMENT/APPLIANCES. IF | | | THE SYSTEM IS LESS THAN 2 PSI IN THE STRUCTURE, WHY THE | | | NEED FOR THE REGULATORS? REMOVE THE REGULATOR | | | DOWNSTREAM OF THE METER AND THE SIZE OF THE SCH. 40 | | | METALLIC PIPE FOR A 2 PSI SYSTEM DOWNSTREAM OF THE GAS | | | METER CAN BE 2 INCH BASED ON 2014 FBC-FUEL GAS TABLE | | | 402.4 (5). AS DESIGNED, THE SYSTEM IS CONFUSING AND | | | DOES NOT CCOMPLY WITH THE GAS CODE. | | | | | | NOTE: I SUGGEST CONTACTING THIS PLAN REVIEWER TO | | | DISCUSS THE SIZING OF THE GAS SYSTEM. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2018-07-25 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2018-07-24 |
Time |
10:26 |
Sent To |
|
|
| Notes |
| 2018-07-25 10:26:42 | RESUB ROUTED TO CCOLE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2018-07-18 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2018-07-06 |
Time |
10:44 |
Sent To |
|
|
| Notes |
| 2018-07-11 10:44:45 | RESUB ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2018-06-25 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-06-25 |
Time |
14:06 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-06-15 |
Time |
09:51 |
Sent To |
|
|
| Notes |
| 2018-06-19 09:51:19 | RESUB ROUTED TO CCOLE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2018-06-05 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2018-06-05 |
Time |
09:23 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2018-05-24 |
Time |
13:46 |
Sent To |
|
|
| Notes |
| 2018-05-25 13:46:58 | RESUB OF REVISION ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2018-05-25 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2018-05-25 |
Time |
13:45 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2018-05-24 |
Time |
10:47 |
Sent To |
|
|
| Notes |
| 2018-05-24 10:48:12 | INSPECTION LOGS ROUTED TO DOUG HARVEY PER HIS | | | INSTRUCTIONS |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2018-04-27 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2018-04-19 |
Time |
14:58 |
Sent To |
|
|
| Notes |
| 2018-04-20 14:58:18 | REVISION ROUTED TO JLEAHY |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
5 |
Status |
P |
Date |
2018-07-25 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2018-07-25 |
Time |
17:25 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2018-07-25 |
Time |
17:25 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
4 |
Status |
F |
Date |
2018-07-18 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2018-07-18 |
Time |
10:57 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2018-07-18 |
Time |
10:57 |
Sent To |
I |
|
| Notes |
| 2018-07-18 11:05:20 | 4TH REVIEW FBC-2014 MECHANICAL | | | MASTER PERMIT #16110067 | | | REVISION PERMIT #18040871 | | | 6/5//18 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) THIS IS THE 4TH REQUEST FOR COMPLETE ENGINEERING FOR | | | INSTALLATION OF THE RTU'S AND DOAS-1. THE CORRECTED AND | | | RESUBMITTED PLANS ARE PROVIDING ONLY THE UNIT | | | ATTACHMENT TO THE CURBS BUT THE REMAINING DETAILS HAVE | | | NOT BEEN PROVIDED. AS A RESULT, I HAVE CALLED THE MEP | | | ENGINEER OF RECORD BRUCE CIARLARIELLO PE. WHO STATED | | | THAT THE REMAINING DETAILS- | | | | | | ROOF OPENING FRAMING AND CURB TO ROOF STRUCTURE | | | ATTACHMENT- ARE THE RESPONSIBILTY OF THE STRUCTURAL | | | ENGINEER. PLEASE SEE COMMENT #1 FROM THE 1ST REVIEW | | | DATED 4/27/18. | | | | | | 2) PROVIDE COMPLETE ENGINEERED DETAILS FOR INSTALLATION | | | OF THE NEW RTU'S INCLUDING THE NEW ROOF OPENINGS AND | | | REINFORCEMENTS, CURB ATTACHMENTS TO THE STRUCTURE, AND | | | UNIT ATTACHEMENTS TO THE CURBS- SECTION 301.15 | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | | KEEP THEM WITH THE SUBMITTALS. | | | | | | | | | UPON RECEIPT OF THESE COMMENTS, PLEASE CONTACT ME AT | | | YOUR EARLIEST CONVENIENCE. | | | | | | THANK YOU, | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
F |
Date |
2018-06-21 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2018-06-21 |
Time |
15:02 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2018-06-21 |
Time |
12:03 |
Sent To |
|
|
| Notes |
| 2018-06-21 15:13:48 | 3RD REVIEW FBC-2014 MECHANICAL | | | MASTER PERMIT #16110067 | | | REVISION PERMIT #18040871 | | | 6/5//18 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) SHEET M3.0: THE REQUESTED WIND LOAD ENGINEERING FOR | | | THE RTU AND DOAS INSTALLATIONS IS INCOMPLETE. DETAILS | | | LACKING: A) THE ROOF OPENING FRAMING AND | | | REINFORCEMENTS. B) THE CURB ATTACHMENT TO THE ROOF | | | STRUCTURE. C) THE LENGTH OF THE 1/2" ANCHOR BOLTS | | | SPECIFIED TO ANCHOR THE DOAS TO THE CURB. D) | | | MANUFACTURER'S SPECIFICATIONS FOR THE FACTORY CURBS. | | | | | | PLEASE NOTE THAT THE REMAINING ENGINEERING CAN BE A | | | DEFERRED SUBMITTAL BY REQUEST. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | | KEEP THEM WITH THE SUBMITTALS. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2018-06-05 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2018-06-05 |
Time |
09:10 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2018-06-04 |
Time |
17:47 |
Sent To |
I |
|
| Notes |
| 2018-06-05 09:14:47 | 2ND REVIEW FBC-2014 MECHANICAL | | | MASTER PERMIT #16110067 | | | REVISION PERMIT #18040871 | | | 6/5//18 | | | | | | 1) THE PLANS WERE RESUBMITTED WITHOUT ANY CORRECTIONS | | | OR REVISIONS MADE TO THE MECHANICAL DRAWINGS BASED ON | | | THE 1ST REVIEW COMMENTS. I HAVE REPRINTED THE 1ST | | | REVIEW COMMENTS BELOW: PLEASE COMPLY. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | | KEEP THEM WITH THE SUBMITTALS. | | | | | | | | | 1ST REVIEW FBC-2014 MECHANICAL | | | MASTER PERMIT #16110067 | | | REVISION PERMIT #18040871 | | | 4/27/18 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) THE CHANGE FROM FAN COIL SYSTEMS TO THE NEW RTU'S | | | WILL REQUIRE UPDATES AND REVISIONS TO SHEETS M3.2 | | | (EQUIPMENT SCHEDULES), M3.3 (PRESSURIZATION CALCULATION | | | TABLES AND HEAT PUMP SCHEDULE), & M4 (CONTROL | | | DIAGRAMS). PLEASE PROVIDE THE REVISED SHEETS AND LIST | | | THE REVISION NUMBERS AND DATES IN THE MARGINS OF ALL | | | THE REVISED SHEETS- SECTION 107.2.1 WEST PALM BEACH | | | | | | AMENDMENTS TO THE FBC-14. | | | | | | 2) PROVIDE COMPLETE ENGINEERED DETAILS FOR INSTALLATION | | | OF THE NEW RTU'S INCLUDING THE NEW ROOF OPENINGS AND | | | REINFORCEMENTS, CURB ATTACHMENTS TO THE STRUCTURE, AND | | | UNIT ATTACHEMENTS TO THE CURBS- SECTION 301.15 | | | | | | 3) M1.2, NOTE #5: SUPPORT SPACING FOR CONDENSATE PIPING | | | SHALL BE 4'-0" O.C.- TABLE 305.4 | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | | KEEP THEM WITH THE SUBMITTALS. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2018-04-27 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2018-04-27 |
Time |
09:36 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2018-04-27 |
Time |
09:18 |
Sent To |
I |
|
| Notes |
| 2018-04-27 10:01:54 | 1ST REVIEW FBC-2014 MECHANICAL | | | MASTER PERMIT #16110067 | | | REVISION PERMIT #18040871 | | | 4/27/18 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) THE CHANGE FROM FAN COIL SYSTEMS TO THE NEW RTU'S | | | WILL REQUIRE UPDATES AND REVISIONS TO SHEETS M3.2 | | | (EQUIPMENT SCHEDULES), M3.3 (PRESSURIZATION CALCULATION | | | TABLES AND HEAT PUMP SCHEDULE), & M4 (CONTROL | | | DIAGRAMS). PLEASE PROVIDE THE REVISED SHEETS AND LIST | | | THE REVISION NUMBERS AND DATES IN THE MARGINS OF ALL | | | THE REVISED SHEETS- SECTION 107.2.1 WEST PALM BEACH | | | | | | AMENDMENTS TO THE FBC-14. | | | | | | 2) PROVIDE COMPLETE ENGINEERED DETAILS FOR INSTALLATION | | | OF THE NEW RTU'S INCLUDING THE NEW ROOF OPENINGS AND | | | REINFORCEMENTS, CURB ATTACHMENTS TO THE STRUCTURE, AND | | | UNIT ATTACHEMENTS TO THE CURBS- SECTION 301.15 | | | | | | 3) M1.2, NOTE #5: SUPPORT SPACING FOR CONDENSATE PIPING | | | SHALL BE 4'-0" O.C.- TABLE 305.4 | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | | KEEP THEM WITH THE SUBMITTALS. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2018-07-18 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-07-18 |
Time |
06:56 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-07-16 |
Time |
08:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
F |
Date |
2018-06-25 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-06-25 |
Time |
13:42 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-06-25 |
Time |
08:27 |
Sent To |
|
|
| Notes |
| 2018-06-25 13:42:00 | 1) MEANS FOR CONTROLLING EXPANSION SHALL BE PROVIDED BY | | | AN EXPANSION TANK OR A THERMAL EXPANSION VALVE. ANY | | | PRESSURE INCREASES DUE TO THERMAL EXPANSION OF THE | | | WATER BEING HEATED MUST BE CONTROLLED TO PREVENT THE | | | PRESSURE DOWNSTREAM OF A PRESSURE - REDUCING VALVE FROM | | | BECOMING GREATER THAN THE SETTING OF THE VALVE.2014 | | | FBC-PLUMBING SEC.607.3 . | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2018-06-03 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-06-03 |
Time |
03:56 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-06-03 |
Time |
02:23 |
Sent To |
M |
|
| Notes |
| 2018-06-03 03:53:20 | 1) SUBMIT THE ADDITIONAL SHEETS FOR THE MANUFACTURER'S | | | SPECIFICATIONS FOR THE TANKLESS WATER HEATERS. THERE | | | ARE A TOTAL OF 2 OR 3 SHHETS. THE SPECIFICATIONS MUST | | | SHOW THE WATER HEATER IS LISTED AND LABELED PER THE | | | 2014 FBC-FUEL GAS SEC. 301.3.TWO COPIES OF THE | | | SPECIFICATIONS ARE REQUIRED PER WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | 2) MEANS SHALL BE PROVIDED FOR THERMAL EXPANSION FOR | | | THE HOT WATER SYSTEM SINCE THESE TANKLESS WATER HEATERS | | | ARE EQUIPPED WITH A BUFFER TANK AND A RECIRCULATION | | | PUMP. 2014 FBC-PLUMBING SEC.607.3. | | | 3) THE ENTIRE RECIRCULATING LINE SHALL BE INSULATED | | | WITH MINIMUM 1 INCH INSULATION INCLUDING THE FIRST 8 | | | FEET OF ALL BRANCH LINES PER 2014 FBC-PLUMBING SEC. | | | 607.5 , 2014 ENERGY CODE SEC. C404.5. | | | 4) SHT. P1.0 - SHOW THE LOCATION OF THE GAS METER ON | | | THE PLAN. WPB AMEND. TO FBC SEC. 107.2.1. | | | 5) SHOW THE LOCATION OF THE MP REGULATOR FOR THE | | | GENERATOR.WPB AMEND. TO FBC SEC. 107.2.1. | | | 6) SHOW THE SIZE OF THE HORIZONTAL GAS PIPNG TO THE | | | DRYERS. | | | 7) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FLEX | | | CONNECTOR FOR THE GENERATOR. THE FLEX CONNECTOR SHALL | | | BE APPROVED TO FLOW THE MAXIMUM BTU LOAD FOR THE | | | GENERATOR. 2017 FBCR SEC. 411.1.3.2.THE CONNECTOR SHALL | | | HAVE THE CAPACITY FOR THE TOTAL DEMAND OF THE CONNECTED | | | APPLIANCE 2014 FBC-FUEL GAS SEC. 411.1.3.2. | | | 8) SHT. P4.2 - THE GAS SYSTEM SIZING AT THE METER IS | | | STILL OVERSIZED. YOU SHOW THE SYSTEM AS BEING 2 PSI | | | FROM THE GAS PURVEYOR ON SHT. P3.0 AND ALSO NOTE THIS | | | ON SHT.P4.2. YOU SHOW AN MP REGULATOR ON THE GAS MAIN | | | DOWNSSTREAM OF THE GAS METER AND SHUTOFF VALVE. WHAT IS | | | THE PRESSURE ON THE SYSTEM DOWNSTREAM OF THIS | | | REGULATOR? IF INDEED IT IS LESS THAN 2 PSI AT THIS | | | POINT THEN ALL YOUR PE IS UNDERSIZED. THE PE PIPE WOULD | | | HAVE TO BE OVER 4 INCHES IN DIAMETER TO HANDLE THE | | | TOTAL BTU LOAD AT 250 FEET IN LENGTH. SECONDLY, IT IS | | | NOT EVEN POSSIBLE TO SUPPLY A 2 INCH PE LINE FROM A 5 | | | INCH LINE AT THE SAME LOW PRESSURE.THE PLAN SHOWS MP | | | REGULATORS SUPPLYING THE GAS EQUIPMENT/APPLIANCES. IF | | | THE SYSTEM IS LESS THAN 2 PSI IN THE STRUCTURE, WHY THE | | | NEED FOR THE REGULATORS? REMOVE THE REGULATOR | | | DOWNSTREAM OF THE METER AND THE SIZE OF THE SCH. 40 | | | METALLIC PIPE FOR A 2 PSI SYSTEM DOWNSTREAM OF THE GAS | | | METER CAN BE 2 INCH BASED ON 2014 FBC-FUEL GAS TABLE | | | 402.4 (5). AS DESIGNED, THE SYSTEM IS CONFUSING AND | | | DOES NOT CCOMPLY WITH THE GAS CODE. | | | | | | NOTE: I SUGGEST CONTACTING THIS PLAN REVIEWER TO | | | DISCUSS THE SIZING OF THE GAS SYSTEM. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2018-04-24 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-04-24 |
Time |
09:26 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-04-24 |
Time |
06:00 |
Sent To |
|
|
| Notes |
| 2018-04-24 09:26:36 | 1) SUBMIT TWO COPIES OF THE MANUFACTURER'S | | | SPECIFICATIONS FOR THE NAVIEN TANKLESS WATER HEATERS. | | | WPB AMEND. TO FBC SEC. 107.2.1, 2014 FBC-FUEL GAS | | | SEC.305.1. THE INSTALLATION MANUAL SHALL BE ONSITE FOR | | | INSPECTION. | | | 2) SHT. P-3 - DETAIL 7 NOTES "GAS PRESSURE REGULATOR | | | REDUCE GAS TO 2" WC." IS THIS SUPPOSED TO READ 2 PSI? | | | CLARIFY. | | | 3) SHT. P1.0 - DETAIL 1 - INDICATE THE TYPE OF MATERIAL | | | TO BE USED FOR THE EXHAUST AND INTAKE VENTS OF THE | | | TANKLESS WATER HEATERS.. THE TYPE OF MATERIAL SHALL | | | COMPLY WITH THE REQUIREMENTS OF THE NAVIEN INSTALLATION | | | MANUAL. | | | 4) SHT. P4.2 - GAS FIXTURE LOAD SUMMARY - PLEASE REVISE | | | THE TOTAL LOAD TO 4066.6 BTU'S. | | | 5) SHT. P4.2 - IF THE GAS PRESSURE IS 2 PSI COMING FROM | | | THE GAS UTILITY WHY IS 5 INCH SCH. 40 BEING INSTALLED | | | DOWNSTREAM OF THE GAS METER AND NEW GAS REGULATOR? THE | | | 5 INCH LINE IS OVERSIZED.CLARIFY. | | | 6) SIZE THE SCH. 40 LINE IN ITS ENTIRETY FROM THE GAS | | | METER TO THE GROUND PENETRATION POINT. | | | 7) SHOW THE DISTANCE FROM EACH MP REGULATOR TO THE MOST | | | REMOTE OUTLET ON EACH BRANCH LINE PER THE 2017 FBC-FUEL | | | GAS SEC.402.4.1, 402.4.2. | | | 8) SHOW THE LOCATION OF ALL MEDIUM PRESSURE REGULATORS. | | | WPB AMEND. TO FBC SEC. 107.2.1. | | | 9) SHT. P4.1 - SIZE THE HOT WATER RECIRCULATION LINE TO | | | THE TANKLESS WATER HEATERS. | | | 10) SHT. 3.0 - DETAIL 7 SHOWS A 3/4 INCH GAS LINE TO | | | THE TANKLESS WATER HEATERS BUT SHEET P4.2 SHOWS A 2 | | | INCH GAS LINE.CLARIFY. | | | 11) SHT.P3.0 - DETAIL 7 - IN ADDITION TO SHOWING A 3/4 | | | GAS CONNECTION TO THE TANKLESS WATER HEATERS, THE | | | PIPING DIAGRAM SHOWS FOUR ADDITIONAL OUTLETS THAT | | | APPEAR TO BE SEDIMENT TRAPS.IF THAT IS THE INTENT, THE | | | LOCATION OF THESE TRAPS WILL ACCOMPLISH NOTHING. | | | CLARIFY. SEDIMENT TRAPS SHALL BE LOCATED IN ACCORDANCE | | | WITH THE 2017 FBC-FUEL GAS SEC. 408.4. | | | 12) SHOW THE LOCATION OF THE EXHAUST AND INTAKE VENTS | | | ON THE PARTIAL ROOF PLAN. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|