| 2018-05-18 09:12:12 | FOUNDATION PERMIT #18040522 |
| | ORD. 4745-17 |
| | RESO. 350-17 |
| | PROJECT NAME: DRIVE SHACK |
| | |
| | ZONING CONTACT: HEATHER M. TRIBOU |
| | (561) 822-1562 |
| | [email protected] |
| | |
| | |
| | |
| | GENERAL COMMENTS |
| | |
| | --THE DRIVE SHACK PALM BEACH, LLC MUST SUPPLY AN |
| | EASEMENT OR OTHER FORM OF ACCEPTABLE AGREEMENT FOR THE |
| | ?CITY OF WEST PALM BEACH? SIGNAGE LOCATED ON THE NORTH |
| | SIDE OF THE PROPERTY AS INDICATED ON THE SITE PLAN |
| | (SP-1) WITH THE LAST REVISION DATED SEPTEMBER 29, 2017. |
| | THE EASEMENT WILL BE RECORDED BEFORE ISSUANCE OF |
| | CERTIFICATE OF OCCUPANCY. THE CONCEPTUAL DESIGN OF THE |
| | NEW SIGN SHALL BE APPROVED BY THE CITY BEFORE |
| | INSTALLATION WHICH IS SCHEDULED FOR 5/21/18. |
| | |
| | --FAA APPROVAL MUST BE PROVIDED BEFORE BUILDING PERMIT |
| | ISSUANCE. |
| | |
| | -- THE RECONFIGURATION OF DRIVEWAYS AT THE AIRPORT |
| | SOUTH OF FLORIDA MANGO ROAD AND THE NEW CIRCULAR DRIVE, |
| | INCLUDING ALL ENTRIES TO THE SITE, MUST HAVE COMPLETED |
| | CONSTRUCTION BEFORE FINAL INSPECTIONS. |
| | |
| | -- THIS PROJECT REQUIRES FOR THE PUBLIC ART ASSESSMENT |
| | (SEC. 98-129 OF CHAPTER 28 OF THE CITY OF WEST PALM |
| | BEACH CODE OF ORDINANCES). IT IS ENCOURAGED THAT THE |
| | ART BE INTEGRATED INTO THE SITE PLAN NOW TO ASSIST WITH |
| | MITIGATION OF THE FA?ADE ORIENTATION. |
| | |
| | SPECIFIC COMMENTS |
| | |
| | --BUILDING SIZE DIFFERS FROM APPROVED PLANS AND WILL |
| | REQUIRE A MINOR SITE PLAN AMENDMENT BEFORE CERTIFICATE |
| | OF OCCUPANCY. |
| | |
| | --PER TEAM EMAIL ON MAY 1, 2018 AND REMINDER EMAIL SENT |
| | BY BRENNEN DAUGHERTY ON MAY 11, 2018 THE FRONT |
| | ELEVATION DIFFERS FROM APPROVED PLANS AND EQUIVALENCY |
| | OF MATERIALS HAS NOT BEEN SATISFIED OF WHICH DESIGN MAY |
| | AFFECT FOUNDATION LOAD CALCULATIONS. PER THE LETTER |
| | SUMMITED DATED APRIL 23, 2018 WRITTEN BY BRIAN ADAMS OF |
| | MARCH ADAMS & ASSOCIATES AND SEALED BY JOE B. |
| | HUTCHERSON III, P.E. THE WEIGHT OF REPLACEMENT OF |
| | MATERIALS WILL BE PROVIDED IN DEFERRED SUBMITTAL. THIS |
| | PHASED PERMIT APPROVAL FOR THE FOUNDATION SHALL PROCEED |
| | AT HOLDERS OWN RISK. |
| | |