| Plan Review Stops For Permit 18040522 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2018-05-17 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-05-17 |
Time |
09:43 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-05-16 |
Time |
18:22 |
Sent To |
|
|
| Notes |
| 2018-05-17 09:48:12 | THIS IS A PHASED PERMIT, IN ACCORDANCE WITH FBC 105.13, | | | FOR THE FOUNDATION AND FIRST FLOOR SLAB. THE HOLDER OF | | | SUCH PERMIT FOR THE FOUNDATION OR OTHER PARTS OF A | | | BUILDING OR STRUCTURE SHALL PROCEED AT THE HOLDER'S OWN | | | RISK WITH THE BUILDING OPERATION AND WITHOUT ASSURANCE | | | THAT A PERMIT FOR THE ENTIRE STRUCTURE WILL BE GRANTED. | | | THIS PROVISION IS ONLY FOR THE FLORIDA BUILDING CODE. | | | ALL OTHER AGENCY APPROVALS NECESSARY FOR CONSTRUCTION | | | MUST BE SECURED PRIOR TO THIS PROVISION BEING APPLIED. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2018-05-04 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-05-04 |
Time |
15:46 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-05-04 |
Time |
08:35 |
Sent To |
|
|
| Notes |
| 2018-05-04 16:11:42 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC FIFTH EDITION (2014) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | FOUNDATION AND SLAB ONLY PERMIT | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) THIS PROPERTY IS LOCATED IN A SPECIAL FLOOD HAZARD | | | AREA ( FLOOD ZONE AE). THE BASE FLOOD ELEVATION IS 12.7 | | | FT. (NAVD88) PLUS THE TWO FOOT FREEBOARD REQUIRED BY | | | THE CITY'S FLOOD ORDINANCE. THEREFORE, THE REQUIRED | | | FINISHED FLOOR ELEVATION IS 14.7 FT. (NAVD 88) OR | | | HIGHER. SUBMIT A PRE-CONSTRUCTION ELEVATION CERTIFICATE | | | SHOWING THAT THE PROPOSED CONSTRUCTION IS IN | | | COMPLIANCE. CITY ORDINANCES ARTICLE XVII FLOOD | | | PREVENTION AND CONTROL SECTION 94-546 | | | | | | 2) IMPACT FEE COMMENTS MUST BE ADDRESSED. | | | | | | 3) THE THIN BRICK VENEER AND THE OTHER ITEMS FROM THE | | | PREVIOUS BUILDING REVIEW COMMENTS NOT REQUIRED FOR THE | | | FOUNDATION/ FIRST FLOOR SLAB PERMIT WILL BE ADDRESSED | | | WHEN THE CONSTRUCTION DOCUMENTS FOR THE REST OF THE | | | PROJECT ARE REVIEWED. | | | | | | 4) 105.13 PHASED PERMIT APPROVAL. AFTER SUBMITTAL OF | | | THE APPROPRIATE CONSTRUCTION DOCUMENTS, THE BUILDING | | | OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT FOR THE | | | CONSTRUCTION OF FOUNDATIONS OR ANY OTHER | | | PART OF A BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION | | | DOCUMENTS FOR THE WHOLE BUILDING OR STRUCTURE HAVE BEEN | | | SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE FOUNDATION | | | OR OTHER PARTS OF A BUILDING OR STRUCTURE SHALL PROCEED | | | AT THE HOLDER'S OWN RISK WITH THE BUILDING OPERATION | | | AND WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE | | | STRUCTURE WILL BE GRANTED. CORRECTIONS MAY BE REQUIRED | | | TO MEET THE REQUIREMENTS OF THE TECHNICAL CODES. THIS | | | PROVISION IS ONLY FOR THE FLORIDA BUILDING CODE. ALL | | | OTHER AGENCY APPROVALS NECESSARY FOR CONSTRUCTION MUST | | | BE SECURED PRIOR TO THIS PROVISION BEING APPLIED. | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2018-04-30 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-04-30 |
Time |
17:05 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-04-30 |
Time |
16:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
N |
Date |
2018-05-16 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-05-16 |
Time |
16:58 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-05-16 |
Time |
16:58 |
Sent To |
|
|
| Notes |
| 2018-05-16 16:59:02 | ENGINEERING NOT REVIEWED; OK TO ISSUE PER M.GONZALEZ | | | | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
N |
Date |
2018-04-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-04-24 |
Time |
16:12 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-04-24 |
Time |
16:12 |
Sent To |
|
|
| Notes |
| 2018-04-24 16:12:33 | BOND RECEIVED, OK TO PASS ENGINEERING PER MG | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2018-05-18 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2018-05-18 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2018-05-17 |
Time |
17:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2018-05-04 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2018-05-04 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2018-04-17 |
Time |
09:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2018-05-21 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2018-05-21 |
Time |
10:01 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2018-05-10 |
Time |
09:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2018-05-04 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-05-04 |
Time |
17:07 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-04-16 |
Time |
12:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-04-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-04-24 |
Time |
15:57 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-04-16 |
Time |
11:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
4 |
Status |
P |
Date |
2018-09-06 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-09-06 |
Time |
19:00 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-09-06 |
Time |
19:00 |
Sent To |
|
|
| Notes |
| 2018-09-06 19:00:46 | MU-2018-014951-0000 | | | $56,524.64 | | | PAID WITH REVISION 18071337, EXPAND FOUNDATION PERMIT | | | TO VERTICAL STRUCTURE | | | |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
3 |
Status |
N |
Date |
2018-07-27 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-06-01 |
Time |
08:37 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-06-01 |
Time |
08:37 |
Sent To |
|
|
| Notes |
| 2018-07-27 19:02:40 | IMPACT FEES WILL NEED TO BE PAID BEFORE STRUCTURE CAN | | | GO VERTICAL. |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
F |
Date |
2018-05-17 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-05-17 |
Time |
18:23 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-05-17 |
Time |
18:23 |
Sent To |
|
|
| Notes |
| 2018-05-17 18:24:31 | BEFORE A PERMIT TO CONSTRUCT CAN BE ISSUED, IMPACT FEES | | | MUST BE PAID TO PALM BEACH COUNTY. UPON APPROVAL, ONE | | | SET OF PLANS SHALL BE SIGNED OUT AND SUBMITTED TO PALM | | | BEACH COUNTY FOR AN IMPACT FEE REVIEW. THE PLANS WITH | | | THE IMPACT FEE STAMP AND A COPY OF THE PAID RECEIPT | | | MUST BE RETURNED TO THE CITY BUILDING DEPARTMENT BEFORE | | | THE BUILDING PERMIT CAN BE ISSUED. FOR INFORMATION CALL | | | PALM BEACH COUNTY IMPACT FEES AT (561) 233-5025. |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2018-05-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-05-03 |
Time |
09:57 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-05-03 |
Time |
09:57 |
Sent To |
|
|
| Notes |
| 2018-05-03 09:57:01 | BEFORE A PERMIT TO CONSTRUCT CAN BE ISSUED, IMPACT FEES | | | MUST BE PAID TO PALM BEACH COUNTY. UPON APPROVAL, ONE | | | SET OF PLANS SHALL BE SIGNED OUT AND SUBMITTED TO PALM | | | BEACH COUNTY FOR AN IMPACT FEE REVIEW. THE PLANS WITH | | | THE IMPACT FEE STAMP AND A COPY OF THE PAID RECEIPT | | | MUST BE RETURNED TO THE CITY BUILDING DEPARTMENT BEFORE | | | THE BUILDING PERMIT CAN BE ISSUED. FOR INFORMATION CALL | | | PALM BEACH COUNTY IMPACT FEES AT (561) 233-5025. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2018-05-21 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2018-05-21 |
Time |
09:59 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2018-05-21 |
Time |
09:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2018-05-01 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2018-05-01 |
Time |
09:39 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2018-05-01 |
Time |
07:16 |
Sent To |
|
|
| Notes |
| 2018-05-01 10:19:01 | 1ST REVIEW: FBC 2014 5TH EDITION | | | | | | PLUMBING COMMENTS: | | | | | | 1. THE SANITARY ISOMETRIC IS INCOMPLETE IT IS MISSING | | | THE SECTION THAT IS UPSTREAM OF THE BRANCH FOR S-4 IT | | | IS ALSO MISSING THE SECTION FOR THE DRAINS IN THE | | | FROZEN STORAGE 01.03.02 AND THE SANITARY THAT IS IN | | | AREA A. FOR THE FOUNDATION PERMIT PLEASE PROVIDE A | | | COMPLETE SANITARY ISOMETRIC INCLUDING ONLY THE | | | UNDERGROUND PIPING DO NOT INCLUDE PIPING ABOVE THE | | | SLAB, WATER PIPING BELOW SLAB, STORM DRAIN PIPING BELOW | | | SLAB AND A GREASE WASTE ISOMETRIC WITH UNDERGROUND | | | PIPING ONLY. PER WPB AMEND TO FBC 107.2.1 | | | | | | 2. SHT. P2-0-B IS SHOWING AN S-10 SOIL STACK THE | | | ISOMETRIC ON SHT. P4-1 SHOWS THAT SAME STACK AS S-3 | | | PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1 | | | | | | 3. SHT. P2-0-B THE STACK BETWEEN S-7 AND S-9 IS NOT | | | LABELED PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1 | | | | | | 4. IF YOU WISH TO RECEIVE AN APPROVED REVIEW FOR THE | | | GREASE INTERCEPTORS UNDER THE FOUNDATION PERMIT PLEASE | | | INCLUDE THE SIZING CALCULATION ADDRESSING THE COMMENTS | | | UNDER PERMIT # 17120261 | | | | | | 5. SHT. P2-0-B SHOWS THREE GREASE INTERCEPTORS SHTS. | | | C6.00 AND C6.02 SHOWS ONLY 2 PLEASE CLARIFY-AND SHOW | | | THE CORRECT NUMBER ON ALL PLAN SHEETS. PER WPB AMEND TO | | | FBC 107.2.1 | | | | | | IF YOU WISH TO DISCUS THESE COMMENTS TO EXPEDITE THE | | | FOUNDATION PERMIT PLEASE CONTACT GEORGE JOHNSON @ | | | 561-805-6711 | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | | THE PREVIOUSLY REVIEWED SHEETS. | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2018-05-16 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-05-16 |
Time |
17:19 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-05-16 |
Time |
17:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2018-05-04 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-05-04 |
Time |
17:02 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-05-04 |
Time |
17:01 |
Sent To |
|
|
| Notes |
| 2018-05-04 17:03:20 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | | | | 1. CIVIL PAGES ARE NOT DIGITALLY SIGNED AND SEALED. IF | | | THE CIVIL ENGINEER DOES NOT HAVE A DIGITAL SEAL, A | | | SIGNED AND SEALED PAPER ORIGINAL MAY BE SUBMITTED. | | | | | | 2. OTHER DIGITAL SIGNATURES AND SEALS ARE IN ACCORDANCE | | | WITH FS471, FS481, BUT SHEETS SUBMITTED NEXT REVIEW | | | CYCLE NEED REVIEW. | | | |
|
|
| Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
| Rev No |
1 |
Status |
P |
Date |
2018-05-04 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-05-04 |
Time |
15:45 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-05-04 |
Time |
15:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2018-05-18 |
|
|
Cont ID |
|
| Sent By |
hmtribou |
Date |
2018-05-18 |
Time |
09:33 |
Rev Time |
0.00 |
| Received By |
hmtribou |
Date |
2018-05-18 |
Time |
09:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2018-04-19 |
|
|
Cont ID |
|
| Sent By |
HT |
Date |
2018-04-19 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
2018-04-19 |
Time |
|
Sent To |
I |
|
| Notes |
| 2018-04-19 09:07:09 | ORD. 4745-17 | | | RESO. 350-17 | | | PROJECT NAME: DRIVE SHACK | | | | | | ZONING CONTACT: HEATHER M. TRIBOU | | | (561) 822-1562 | | | [email protected] | | | | | | | | | | | | GENERAL COMMENTS | | | | | | --THE RESPONSE TO COMMENTS INDICATE THAT THE CIVIL | | | CONSULTANTS WILL COORDINATE THIS, BUT THE SITE DEMO | | | PLANS INDICATE THE CURRENT SIGN NOT BEING REMOVED AND | | | THE SITE LAYOUT PLANS DO NOT INDICATE REPLACEMENT SIGN. | | | THE DRIVE SHACK PALM BEACH, LLC MUST SUPPLY AN EASEMENT | | | OR OTHER FORM OF ACCEPTABLE AGREEMENT FOR THE ?CITY OF | | | WEST PALM BEACH? SIGNAGE LOCATED ON THE NORTH SIDE OF | | | THE PROPERTY AS INDICATED ON THE SITE PLAN (SP-1) WITH | | | THE LAST REVISION DATED SEPTEMBER 29, 2017. THE | | | EASEMENT WILL BE RECORDED BEFORE ISSUANCE OF | | | CERTIFICATE OF OCCUPANCY. THE CONCEPTUAL DESIGN OF THE | | | NEW SIGN SHALL BE APPROVED BY THE CITY BEFORE | | | INSTALLATION WHICH IS SCHEDULED FOR 5/21/18. | | | | | | --FAA APPROVAL MUST BE PROVIDED BEFORE BUILDING PERMIT | | | ISSUANCE. | | | | | | -- THE RECONFIGURATION OF DRIVEWAYS AT THE AIRPORT | | | SOUTH OF FLORIDA MANGO ROAD AND THE NEW CIRCULAR DRIVE, | | | INCLUDING ALL ENTRIES TO THE SITE, MUST HAVE COMPLETED | | | CONSTRUCTION BEFORE FINAL INSPECTIONS. | | | | | | -- THIS PROJECT REQUIRES FOR THE PUBLIC ART ASSESSMENT | | | (SEC. 98-129 OF CHAPTER 28 OF THE CITY OF WEST PALM | | | BEACH CODE OF ORDINANCES). IT IS ENCOURAGED THAT THE | | | ART BE INTEGRATED INTO THE SITE PLAN NOW TO ASSIST WITH | | | MITIGATION OF THE FA?ADE ORIENTATION. | | | | | | SPECIFIC COMMENTS | | | | | | --BUILDING SIZE DIFFERS FROM APPROVED PLANS AND WILL | | | REQUIRE A MINOR SITE PLAN AMENDMENT BEFORE CERTIFICATE | | | OF OCCUPANCY. | | | | | | --FRONT ELEVATION DIFFERS FROM APPROVED PLANS, MORE | | | SPECIFICALLY, NOW THE PROMINENT ENTRY DOES NOT EXIST. | | | THE ENTRY HAS GONE FROM A HORIZONTAL VENEER TO A SCORED | | | VENEER. PART OF THE MAJOR SITE PLAN APPROVAL, SHOWN AS | | | EXHIBIT F IN THE RESOLUTION, IS MORE DESIRABLE AND | | | ATTRACTIVE DEVELOPMENT (SEC.94-207 (1)) OF THE | | | PROMINENT ENTRY AS DISCUSSED IN PLANNING BOARD AND CITY | | | COMMISSION. MATCH ENTRY ELEVATIONS TO APPROVED DRAWING | | | OR SUBMIT FOR REVISED SITE PLAN APPROVAL BEFORE PERMIT | | | ISSUANCE. THESE CHANGES MAKE ALTER FOUNDATION LOAD | | | CALCULATIONS. | | | | | | --SUPPORTING STRUCTURES FOR FENCE POSTS MAY NOT BE IN | | | SETBACK. APPROVED PLANS DO NOT SHOW GUYWIRES IN | | | SETBACKS. | | | | | | |
|
|