| Plan Review Stops For Permit 18040339 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2018-06-15 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-06-15 |
Time |
14:12 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-06-15 |
Time |
14:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2018-04-20 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-04-20 |
Time |
18:48 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-04-20 |
Time |
18:48 |
Sent To |
|
|
| Notes |
| 2018-04-20 18:48:50 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | | | | 1. THE FLAME SPREAD TEST (ASTME-84), SENT VIA EMAIL, | | | WAS PERFORMED WITH A FIBER CEMENT BOARD TOWARDS THE | | | FLAME IN THE STEINER TUNNEL. THIS IS NOT THE FLOORING | | | MATERIAL PROPOSED (FIBER CEMENT BOARD). IT IS NOT CLEAR | | | WHY THEY DID NOT HAVE THE TEST DONE WITH THE | | | UNDERLAYMENT SIDE TO FLAME, OR HAVE A SAMPLE TESTED | | | WHICH WAS THE FLOORING ASSEMBLY PROPOSED - LVT AND | | | UNDERLAYMENT ON A SUPPORTING NON COMBUSTIBLE BOARD OR | | | SLAB, FBC B 603.1. | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-04-20 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-04-20 |
Time |
18:48 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-04-09 |
Time |
12:51 |
Sent To |
|
|
| Notes |
| 2018-04-10 12:51:34 | SUBMITTAL ROUTED TO SHILL |
|
|
|