Plan Review Details - Permit 18040237
Plan Review Stops For Permit 18040237
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2018-05-01 Cont ID  
Sent By rmcdouga Date 2018-05-01 Time 08:31 Rev Time 0.00
Received By rmcdouga Date 2018-05-01 Time 07:43 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2018-04-25 Cont ID  
Sent By rmcdouga Date 2018-04-25 Time 08:53 Rev Time 0.00
Received By rmcdouga Date 2018-04-24 Time 19:01 Sent To I
Notes
2018-04-24 19:08:41THE ENGINEER'S SEAL AND ORIGINAL HANDWRITTEN SIGNATURE
 IS REQUIRED ON THE GEOTECHNICAL ENGINEERING REPORTS
 THAT ARE SUBMITTED FOR PUBLIC RECORD. COPIES OR OTHER
 FACSIMILIES ARE NOT ACCEPTABLE. FAC 61G15-23.001 AND
 61G15-23.003

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-04-18 Cont ID  
Sent By rmcdouga Date 2018-04-18 Time 16:25 Rev Time 0.00
Received By rmcdouga Date 2018-04-18 Time 16:25 Sent To  
Notes
2018-04-18 16:02:36PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE CLEARING AND GRUBBING PERMIT INCLUDES PREPARING
 THE BUILDING PAD FOR THE STRUCTURE. THEREFORE, TWO SETS
 OF A SUBSURFACE SOILS REPORT ARE REQUIRED WITH THE
 SOILS ENGINEER'S RECOMMENDATIONS FOR STABILIZING THE
 SOIL IN ORDER TO SUPPORT THE PROPOSED CONSTRUCTION.
 2014 FBC-B 1803.5.2
  
 2) PROVIDE A LETTER THAT PROVIDES THE NAME OF THE
 COMPANY THAT WILL PROVIDE THE SOIL MONITORING TO VERIFY
 THAT THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS HAVE
 BEEN COMPLETED.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2018-04-16 Cont ID  
Sent By mgonzale Date 2018-04-16 Time   Rev Time 0.50
Received By mgonzale Date 2018-04-16 Time   Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-05-01 Cont ID  
Sent By rmcdouga Date 2018-05-01 Time 08:31 Rev Time 0.00
Received By rmcdouga Date 2018-04-25 Time 14:51 Sent To  
Notes
2018-04-26 14:51:47RESUB ROUTED TO RMCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-04-25 Cont ID  
Sent By rmcdouga Date 2018-04-25 Time 08:53 Rev Time 0.00
Received By rmcdouga Date 2018-04-23 Time 12:54 Sent To  
Notes
2018-04-24 12:54:12RESUB ROUTED TO RMCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-04-18 Cont ID  
Sent By rmcdouga Date 2018-04-18 Time 16:25 Rev Time 0.00
Received By rmcdouga Date 2018-04-05 Time 15:47 Sent To  
Notes
2018-04-18 12:36:254/18 - TO RM DESK
  
2018-04-06 15:47:18ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2018-04-09 Cont ID  
Sent By hmtribou Date 2018-04-09 Time 13:47 Rev Time 0.00
Received By hmtribou Date 2018-04-09 Time 13:47 Sent To ENG
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved