Plan Review Details - Permit 18040058
Plan Review Stops For Permit 18040058
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2018-06-25 Cont ID  
Sent By rmcdouga Date 2018-06-25 Time 18:01 Rev Time 0.00
Received By rmcdouga Date 2018-06-25 Time 16:08 Sent To P
Notes
2018-06-25 16:39:53FBC-R4501.19 FINAL ELECTRICAL AND BARRIER CODE
 INSPECTION SHALL BE COMPLETED PRIOR TO FILLING THE POOL
 WITH WATER.
 THIS PROJECT IS LOCATED IN A SPECIAL FLOOD HAZARD AREA
 (FLOOD ZONE AE), THE POOL EQUIPMENT IS REQUIRED TO BE
 ELEVATED TO THE HEIGHT OF THE FINISH FLOOR OF THE
 DWELLING. FBC-R322
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2018-05-25 Cont ID  
Sent By rmcdouga Date 2018-05-25 Time 14:47 Rev Time 0.00
Received By rmcdouga Date 2018-05-25 Time 13:31 Sent To P
Notes
2018-05-25 14:47:26PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) NOT COMPLIED. NEW COMMENT: (THE CITY OF WEST PALM
 BEACH REQUIRES A SEPARATE PERMIT FOR POOLS INCLUDING
 THE POOL SHELLS. THEY ARE NOT INCLUDED WITH THE PERMITS
 FOR THE DWELLING.) THE VALUE FOR THE POOL AND SPA
 APPEARS TO BE LOW. SUBMIT A COPY OF THE SIGNED CONTRACT
 TO VERIFY THE VALUE. FBC 109.3 BUILDING PERMIT
 VALUATION. FOR PERMITTING PURPOSES, VALUATION OF
 BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE
 TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL,
 INTERIOR FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND
 DESIGN FEES, MARKETING COSTS, OVERHEAD AND PROFIT;
 EXCLUDING ONLY LAND VALUE. VALUATION REFERENCES MAY
 INCLUDE THE LATEST PUBLISHED DATA OF NATIONAL
 CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT,
 MEANS, ETC.), AS PUBLISHED BY INTERNATIONAL CODE
 CONGRESS. FINAL BUILDING PERMIT VALUATION SHALL BE SET
 BY THE BUILDING OFFICIAL.
  
 2) COMPLIED.
  
 3) NOT COMPLIED. NEW COMMENT. (SUBMIT TWO SETS OF THE
 PILE PLACEMENT PLANS FOR THE POOL.) THIS PROJECT IS
 LOCATED IN AN AREA KNOWN TO HAVE QUESTIONABLE SOILS.
 SUBMIT TWO SETS OF A SUB-SURFACE SOIL INVESTIGATION
 REPORT WITH STRUCTURAL POOL SOIL BEARING REQUIREMENTS.
 R401.4 SOIL TESTS. WHERE QUANTIFIABLE DATA CREATED BY
 ACCEPTED SOIL SCIENCE METHODOLOGIES INDICATE EXPANSIVE,
 COMPRESSIBLE, SHIFTING OR OTHER QUESTIONABLE SOIL
 CHARACTERISTICS ARE LIKELY TO BE PRESENT, THE BUILDING
 OFFICIAL SHALL DETERMINE WHETHER TO REQUIRE A SOIL TEST
 TO DETERMINE THE SOIL'S CHARACTERISTICS AT A PARTICULAR
 LOCATION. THIS TEST SHALL BE DONE BY AN APPROVED AGENCY
 USING AN APPROVED METHOD.
  
 4) NOTE: THIS PROJECT IS LOCATED IN A SPECIAL FLOOD
 HAZARD AREA (FLOOD ZONE AE), THE POOL EQUIPMENT IS
 REQUIRED TO BE ELEVATED TO THE HEIGHT OF THE FINISH
 FLOOR OF THE DWELLING. FBC-R322
  
 5) NOT COMPLIED. NEW COMMENT. (A SEPARATE PERMIT IS
 REQUIRED FOR THE POOL WHICH INCLUDES THE POOL
 STRUCTURAL SHELL. SUBMIT ALL STRUCTURAL DOCUMENTS FOR
 THE POOL WITH THE POOL PERMIT.) ON SHEET S-2 THE POOL
 DEEP END SECTION HAS THE STEEL REINFORCING NOTES
 CROSSED OUT. PLEASE CLARIFY AND PROVIDE THIS
 INFORMATION FOR THIS PROJECT. FBC 107.2.1.2 & CITY OF
 WEST PALM BEACH FLOOD ORDINANCE
  
 6) PARTICALLY COMPLIED. NEW COMMENT: (THE CHANGE IN
 SLOPE BETWEEN THE SHALLOW AND DEEP AREA APPEARS TO BE 4
 FT RATHER THAN THE REQUIRED 6 FT FROM THE SHALLOW END.
 SPECIFY THE POOL FLOOR SLOPES ON THE PLANS.) SPECIFY
 THE SLOPE OF THE POOL FLOOR ON SHEET 2 OF THE PLANS.
 ANSI/APSP/ICC-5 SECTION 5.5 STATES THAT THE SLOPE OF
 THE FLOOR FROM THE SHALLOW END WALL TOWARDS THE DEEP
 AREA SHALL NOT EXCEED A 1:7 INCLINE TO THE POINT OF THE
 FIRST SLOPE CHANGE. CHANGES IN SLOPE BETWEEN SHALLOW
 AND DEEP AREAS SHALL BE AT A WATER DEPTH OF 2 FT 9 IN
 AND BE AT LEAST 6 FT FROM THE SHALLOW END. THE SLOPE OF
 THE FLOOR SHALL NOT EXCEED 1:3 INCLINE AFTER THE BREAK.
 FBC-R 4501.6
  
 7) COMPLIED.
  
 8) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT A
 RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW
 COMMENTS HAS BEEN ADDRESSED.
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-04-17 Cont ID  
Sent By rmcdouga Date 2018-04-17 Time 10:22 Rev Time 0.00
Received By rmcdouga Date 2018-04-17 Time 08:19 Sent To E
Notes
2018-04-17 09:26:57PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE VALUE FOR THE POOL AND SPA APPEARS TO BE LOW.
 SUBMIT A COPY OF THE SIGNED CONTRACT TO VERIFY THE
 VALUE. FBC 109.3 BUILDING PERMIT VALUATION. FOR
 PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS
 SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 2) PLAN SHEETS 3 AND 4 ARE MISSING FROM THE
 CONSTRUCTION DOCUMENTS. FBC 107.2.1
  
 3) THIS PROJECT IS LOCATED IN AN AREA KNOWN TO HAVE
 QUESTIONABLE SOILS. SUBMIT TWO SETS OF A SUB-SURFACE
 SOIL INVESTIGATION REPORT WITH STRUCTURAL POOL SOIL
 BEARING REQUIREMENTS. R401.4 SOIL TESTS. WHERE
 QUANTIFIABLE DATA CREATED BY ACCEPTED SOIL SCIENCE
 METHODOLOGIES INDICATE EXPANSIVE, COMPRESSIBLE,
 SHIFTING OR OTHER QUESTIONABLE SOIL CHARACTERISTICS ARE
 LIKELY TO BE PRESENT, THE BUILDING OFFICIAL SHALL
 DETERMINE WHETHER TO REQUIRE A SOIL TEST TO DETERMINE
 THE SOIL?S CHARACTERISTICS AT A PARTICULAR LOCATION.
 THIS TEST SHALL BE DONE BY AN APPROVED AGENCY USING AN
 APPROVED METHOD.
  
 4) THIS PROJECT IS LOCATED IN A SPECIAL FLOOD HAZARD
 AREA (FLOOD ZONE AE), THE POOL EQUIPMENT IS REQUIRED TO
 BE ELEVATED TO THE HEIGHT OF THE FINISH FLOOR OF THE
 DWELLING. FBC-R322
  
 5) ON SHEET S-2 THE POOL DEEP END SECTION HAS THE STEEL
 REINFORCING NOTES CROSSED OUT. PLEASE CLARIFY AND
 PROVIDE THIS INFORMATION FOR THIS PROJECT. FBC
 107.2.1.2 & CITY OF WEST PALM BEACH FLOOD ORDINANCE
  
 6) SPECIFY THE SLOPE OF THE POOL FLOOR ON SHEET 2 OF
 THE PLANS. ANSI/APSP/ICC-5 SECTION 5.5 STATES THAT THE
 SLOPE OF THE FLOOR FROM THE SHALLOW END WALL TOWARDS
 THE DEEP AREA SHALL NOT EXCEED A 1:7 INCLINE TO THE
 POINT OF THE FIRST SLOPE CHANGE. CHANGES IN SLOPE
 BETWEEN SHALLOW AND DEEP AREAS SHALL BE AT A WATER
 DEPTH OF 2 FT 9 IN AND BE AT LEAST 6 FT FROM THE
 SHALLOW END. THE SLOPE OF THE FLOOR SHALL NOT EXCEED
 1:3 INCLINE AFTER THE BREAK. FBC-R 4501.6
  
 7) PLEASE CLARIFY WHAT IS A MOD POOL FLOOR AS SHOWN ON
 POOL SPA SECTION E ON SHEET 2. FBC 107.2.1
  
 8) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT A
 RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW
 COMMENTS HAS BEEN ADDRESSED.
  
  
  
  
  

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2018-06-28 Cont ID  
Sent By thunt Date 2018-06-27 Time 17:57 Rev Time 0.00
Received By jleahy Date 2018-06-28 Time 08:16 Sent To I
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-05-29 Cont ID  
Sent By jleahy Date 2018-05-29 Time 14:01 Rev Time 0.00
Received By jleahy Date 2018-05-29 Time 14:01 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-04-18 Cont ID  
Sent By jleahy Date 2018-04-18 Time 10:25 Rev Time 0.00
Received By jleahy Date 2018-04-18 Time 10:25 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status N Date 2018-06-26 Cont ID  
Sent By thunt Date 2018-06-26 Time 17:41 Rev Time 0.00
Received By thunt Date 2018-06-26 Time 17:40 Sent To  
Notes
2018-06-26 17:41:39A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE
 REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK.
 PROVIDE COMPLETE PLANS AND GAS RISER THAT REFLECTS THE
 ENTIRE SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC
 SEC. 107.2.1.

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2018-05-31 Cont ID  
Sent By thunt Date 2018-05-31 Time 16:06 Rev Time 0.00
Received By thunt Date 2018-05-31 Time 16:05 Sent To  
Notes
2018-05-31 16:09:2905/31/2018 2ND GAS REVIEW**DENIED**
  
 NONE OF THESE COMMENTS FROM THE 1ST GAS REVIEW HAV
 EBEEN ADDRESSED. ANY PLAN REVIEW BEING DENIED 3X FOR
 THE SAME COMMENTS IS SUBJECT TO A 4X PLAN REVIEW FEE.
 FL ST. STATUE 553.80 (2B)
  
  
 YOU HAVE SUBMITTED A GAS PERMIT APPLICATION BUT HAVE
 NOT INCLUDED ANY INFORMATION ON THE GAS SYSTEM. I HAVE
 INCLUDED A GAS PERMIT CHECK LIST IN YOUR PERMIT PACKET
 AND HIGHLIGHTED THE REQUIRED FIELDS YOU WILL NEED TO
 ADDRESS.
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 GAS PERMIT APPLICATION REQUIREMENTS
  
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL
 GAS, SECS. 402.4.1, 402.4.2. OR 2017 FBC-RES SEC.
 G2413.4.1, G2413.4.2.
  
 2. SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE
 CORRUGATED STAINLESS STEEL TUBING
  
 (IF APPLICABLE) FOR EACH PIPE SIZE. WPB AMENDMENTS TO
 FBC SEC.107.2.1.
  
 3. TYPE OF GAS (LP OR NATURAL).WPB AMEND. TO FBC SEC.
 107.2.1.
  
 4. LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS
 SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37)
 OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES
 G2413.4 (1 ) THROUGH G2413.4 (21).
  
 5.SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017
 FBC-FUEL GAS SEC.402.4.1, 402.4.2, OR 2017 FBC-RES.
 SEC. G 2413.4.1, G2413.4.2.
  
 6. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1.
  
  
 7. SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1)
 THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8,
 G2413.1, G2413.2, & G2413.3.
  
 8. SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS.
 A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY
 AHEAD OF EACH MP REGULATOR. 2017 FBC-FUEL GAS
 SEC.409.4, FBC-RESIDENTIAL SEC. G 2420.4.
  
 9. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. 2014 FGC SEC.410.1, 2017 FBC-RES. SEC.
 G2421.1.
  
 10.SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE
 APPLIANCE. COMPLY WITH 2017 FBC-FUEL GAS SEC. 402.4.1
 OR 2017 FBC-RES. SEC. G2413.4.1, G2413.4.2 FOR THE
 PROPER PIPE SIZE AND BTU LOAD.
  
  
  
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-04-11 Cont ID  
Sent By thunt Date 2018-04-11 Time 16:16 Rev Time 0.00
Received By thunt Date 2018-04-11 Time 16:16 Sent To  
Notes
2018-04-11 16:19:4904/11/2018 1ST GAS REVIEW**DENIED**
  
 YOU HAVE SUBMITTED A GAS PERMIT APPLICATION BUT HAVE
 NOT INCLUDED ANY INFORMATION ON THE GAS SYSTEM. I HAVE
 INCLUDED A GAS PERMIT CHECK LIST IN YOUR PERMIT PACKET
 AND HIGHLIGHTED THE REQUIRED FIELDS YOU WILL NEED TO
 ADDRESS.
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 GAS PERMIT APPLICATION REQUIREMENTS
  
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL
 GAS, SECS. 402.4.1, 402.4.2. OR 2017 FBC-RES SEC.
 G2413.4.1, G2413.4.2.
  
 2. SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE
 CORRUGATED STAINLESS STEEL TUBING
  
 (IF APPLICABLE) FOR EACH PIPE SIZE. WPB AMENDMENTS TO
 FBC SEC.107.2.1.
  
 3. TYPE OF GAS (LP OR NATURAL).WPB AMEND. TO FBC SEC.
 107.2.1.
  
 4. LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS
 SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37)
 OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES
 G2413.4 (1 ) THROUGH G2413.4 (21).
  
 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017
 FBC-FUEL GAS SEC.402.4.1, 402.4.2, OR 2017 FBC-RES.
 SEC. G 2413.4.1, G2413.4.2.
 .
  
 6. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1.
  
  
 7. SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1)
 THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8,
 G2413.1, G2413.2, & G2413.3.
  
 8. SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS.
 A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY
 AHEAD OF EACH MP REGULATOR. 2017 FBC-FUEL GAS
 SEC.409.4, FBC-RESIDENTIAL SEC. G 2420.4.
  
 9. SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. 2014 FGC SEC.410.1, 2017 FBC-RES. SEC.
 G2421.1.
  
 10.SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE
 APPLIANCE. COMPLY WITH 2017 FBC-FUEL GAS SEC. 402.4.1
 OR 2017 FBC-RES. SEC. G2413.4.1, G2413.4.2 FOR THE
 PROPER PIPE SIZE AND BTU LOAD.
  
  
  
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-06-28 Cont ID  
Sent By jleahy Date 2018-06-28 Time 08:16 Rev Time 0.00
Received By jleahy Date 2018-06-18 Time 14:58 Sent To I
Notes
2018-06-19 14:58:15ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-05-31 Cont ID  
Sent By thunt Date 2018-05-31 Time 16:09 Rev Time 0.00
Received By thunt Date 2018-05-17 Time 14:14 Sent To  
Notes
2018-05-18 14:14:58RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-04-18 Cont ID  
Sent By jleahy Date 2018-04-18 Time 10:25 Rev Time 0.00
Received By jleahy Date 2018-04-03 Time 09:42 Sent To  
Notes
2018-04-04 09:42:41ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 3 Status P Date 2018-06-27 Cont ID  
Sent By thunt Date 2018-06-26 Time 17:41 Rev Time 0.00
Received By thunt Date 2018-06-26 Time 17:41 Sent To E
Notes
2018-06-26 17:53:23RED LINING OF PLANS APPROVED BY KENT KIMES.

Review Stop P PLUMBING
Rev No 2 Status F Date 2018-05-31 Cont ID  
Sent By thunt Date 2018-05-31 Time 15:56 Rev Time 0.00
Received By thunt Date 2018-05-31 Time 15:56 Sent To  
Notes
2018-05-31 16:05:2105/31/2018 2ND PLUMBING REVIEW**DENIED**
  
 COMMENTS NOT ANSWERED FROM 1ST REVIEW
  
 1) TOTAL JOB VALVE SEEMS LOW. PER WPB AMEND 109.3
 PROVIDE A SIGN BONA FIDE CONTRACT.
  
 2) PROVIDE A DETAIL ON WHERE THE AUTO FILL CONNECTION
 WILL BE MADE AND LOCATION OF THE BACKFLOW. ALSO A
 SEPERATE PERMIT FOR THE ISOLATION BACK IS REQUIRED AND
 CITY ORD #2853-95 ALSO REQUIRES A RPZ AT THE METER
 WHICH YOU CAN DO BOTH BACKFLOWS ON 1 PERMIT.
  
 NEW COMMENTS:
  
 1) SHT. S-1 REFERS TO AIR TEST OF PVC PIPING. PLASTIC
 PIPING IS NOT APPROVED TO BE TESTED BY MEANS OF AIR.
 FBC P 312.1
  
 2) SHT. 2 SAYS POOL PIPING IS NOT SUBJECT TO THE FBC
 PLUMBING 2017 AND TO SEE BOAF INTERPRETATION. I WAS NOT
 ABLE TO LOCATE ANY INTERPRETATION JUST A QUESTION
 REGRADING THE USE OF FLEX PVC. REMOVE ENTIRE COMMENT.
 FBC 107.2.1
  
 3) SHT .2 SAYS CONTRACTOR MAY PLUMB THE POOL IN ANY
 OTHER WAY TO IMPROVE EFFICIENCY. NO CHANGE FROM THE
 APPROVED PLAN ARE PERMITTED IN THE FIELD WITH OUT A
 REVISION. REMOVE ENTIRE COMMENT. FBC 107.2.1
  
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-04-12 Cont ID  
Sent By thunt Date 2018-04-12 Time 07:40 Rev Time 0.00
Received By thunt Date 2018-04-12 Time 07:39 Sent To  
Notes
2018-04-12 07:47:5004/12/2018 1ST PLUMBING REVIEW**DENIED**
  
 1) TOTAL JOB VALVE SEEMS LOW. PER WPB AMEND 109.3
 PROVIDE A SIGN BONA FIDE CONTRACT.
  
 2) PROVIDE A DETAIL ON WHERE THE AUTO FILL CONNECTION
 WILL BE MADE AND LOCATION OF THE BACKFLOW. ALSO A
 SEPERATE PERMIT FOR THE ISOLATION BACK IS REQUIRED AND
 CITY ORD #2853-95 ALSO REQUIRES A RPZ AT THE METER
 WHICH YOU CAN DO BOTH BACKFLOWS ON 1 PERMIT.
  
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  

Review Stop Z ZONING
Rev No 3 Status P Date 2018-06-21 Cont ID  
Sent By mcruz Date 2018-06-21 Time 11:21 Rev Time 0.00
Received By mcruz Date 2018-06-21 Time 11:08 Sent To P
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2018-06-21 Cont ID  
Sent By mcruz Date 2018-05-22 Time   Rev Time 0.00
Received By mcruz Date 2018-05-22 Time   Sent To PC
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2018-04-09 Cont ID  
Sent By ajones Date 2018-04-09 Time 17:05 Rev Time 0.00
Received By ajones Date 2018-04-09 Time 17:05 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved