Plan Review Details - Permit 18031358
Plan Review Stops For Permit 18031358
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-04-10 Cont ID  
Sent By rmcdouga Date 2018-04-10 Time 07:16 Rev Time 0.00
Received By rmcdouga Date 2018-04-10 Time 06:56 Sent To  
Notes
2018-04-10 07:40:32FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-04-10 Cont ID  
Sent By jleahy Date 2018-04-10 Time 09:43 Rev Time 0.00
Received By jleahy Date 2018-04-10 Time 09:43 Sent To I
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-04-09 Cont ID  
Sent By tklarge Date 2018-04-09 Time 09:30 Rev Time 0.00
Received By tklarge Date 2018-04-09 Time 09:30 Sent To  
Notes
2018-04-09 09:31:05THERE IS NO GAS HEATER ON THIS POOL.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-04-10 Cont ID  
Sent By tklarge Date 2018-04-10 Time 15:54 Rev Time 0.00
Received By tklarge Date 2018-04-10 Time 15:54 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-04-10 Cont ID  
Sent By jleahy Date 2018-04-10 Time 09:43 Rev Time 0.00
Received By jleahy Date 2018-03-29 Time 13:38 Sent To  
Notes
2018-04-05 13:38:32ROUTED TO ZONING

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-04-10 Cont ID  
Sent By tklarge Date 2018-04-10 Time 15:54 Rev Time 0.00
Received By tklarge Date 2018-04-10 Time 15:54 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-04-09 Cont ID  
Sent By tklarge Date 2018-04-09 Time 09:30 Rev Time 0.00
Received By tklarge Date 2018-04-09 Time 06:00 Sent To  
Notes
2018-04-09 08:57:291) SUBMIT TWO NEW CLEAR AND LEGIBLE COPIES OF THE
 MANUFACTURER'S SPECIFICATIONS FOR THE PENTAIR STARGUARD
 MAIN DRAIN. THE FLOW RATE ON THE SPCIFICATIONS CANNOT
 BE READ. WPB AMEND. TO FBC SEC. 107.2.1.
 2) THE PLANS SHOW A CHANNEL DRAIN IN THE SPA. SUBMIT
 TWO COPIES OF THE MANUFACTURER'S SPECIFICATIONS FOR THE
 CHANNEL DRAIN. WPB AMEND. TO FBC SEC. 107.2.1.
 3) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS IN ACCORDANCE
 WITH APSP 7-2013 SEC. 4.4.9.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-04-05 Cont ID  
Sent By jroach Date 2018-04-05 Time 08:42 Rev Time 0.00
Received By jroach Date 2018-04-05 Time 08:42 Sent To  
Notes
***NONE***