Plan Review Details - Permit 18031350
Plan Review Stops For Permit 18031350
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-04-10 Cont ID  
Sent By rmcdouga Date 2018-04-10 Time 06:52 Rev Time 0.00
Received By rmcdouga Date 2018-04-10 Time 06:52 Sent To  
Notes
2018-04-10 07:41:07FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-04-10 Cont ID  
Sent By jleahy Date 2018-04-10 Time 09:47 Rev Time 0.00
Received By jleahy Date 2018-04-10 Time 09:47 Sent To I
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-04-06 Cont ID  
Sent By thunt Date 2018-04-06 Time 15:37 Rev Time 0.00
Received By thunt Date 2018-04-06 Time 15:37 Sent To  
Notes
2018-04-06 15:38:30A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE
 REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK.
 PROVIDE COMPLETE PLANS AND GAS RISER THAT REFLECTS THE
 ENTIRE SCOPE OF GAS WORK TO BE DONE. AT THIS TIME. WPB
 AMEND. TO FBC SEC. 107.2.1.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-04-10 Cont ID  
Sent By tklarge Date 2018-04-10 Time 16:03 Rev Time 0.00
Received By tklarge Date 2018-04-10 Time 16:03 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-04-10 Cont ID  
Sent By jleahy Date 2018-04-10 Time 09:47 Rev Time 0.00
Received By jleahy Date 2018-03-29 Time 11:20 Sent To  
Notes
2018-03-30 11:20:55ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-04-10 Cont ID  
Sent By tklarge Date 2018-04-10 Time 16:03 Rev Time 0.00
Received By tklarge Date 2018-04-10 Time 16:03 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-04-09 Cont ID  
Sent By thunt Date 2018-04-06 Time 15:38 Rev Time 0.00
Received By tklarge Date 2018-04-06 Time 15:38 Sent To  
Notes
2018-04-09 11:34:391) SUBMIT TWO NEW CLEAR AND LEGIBLE COPIES OF THE
 MANUFACTURER'S SPECIFICATIONS FOR THE PENTAIR STARGUARD
 MAIN DRAIN. THE FLOW RATE ON THE SPCIFICATIONS CANNOT
 BE READ. WPB AMEND. TO FBC SEC. 107.2.1.
 2) THE PLANS SHOW A CHANNEL DRAIN IN THE SPA. SUBMIT
 TWO COPIES OF THE MANUFACTURER'S SPECIFICATIONS FOR THE
 CHANNEL DRAIN. WPB AMEND. TO FBC SEC. 107.2.1.
 3) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS IN ACCORDANCE
 WITH APSP 7-2013 SEC. 4.4.9.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-04-05 Cont ID  
Sent By jroach Date 2018-04-05 Time 08:29 Rev Time 0.00
Received By jroach Date 2018-04-05 Time 08:29 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved