Plan Review Details - Permit 18031185
Plan Review Stops For Permit 18031185
Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2018-04-09 Time   Rev Time 0.00
Received By lmarchan Date 2018-03-27 Time 10:05 Sent To  
Notes
2018-03-28 10:05:43REVISION ROUTED TO CCOLE

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2018-04-09 Cont ID  
Sent By ccole Date 2018-04-09 Time 09:20 Rev Time 0.00
Received By ccole Date 2018-04-09 Time 09:20 Sent To I
Notes
2018-04-09 09:30:311ST REVIEW FBC-2014 MECHANICAL
 REVISION #18031185
 MASTER #17110531
 4/9/18
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) THE SCOPE OF THE MECHANICAL WORK FOR THE PROJECT HAS
 INCREASED TO INCLUDE ALL NEW VAV'S, DUCTWORK, AND AIR
 DEVICES IN THE SUITE. PLEASE PROVIDE THE INCREASED
 VALUE OF THE PROJECT THAT INCLUDES LABOR, MATERIALS,
 EQUIPMENT. DESIGN FEES, OVERHEAD AND PROFIT- SECTION
 109.3 WEST PALM BEACH AMENDMENTS TO THE FBC-17.
  
 2) M2.1: IDENTIFY ALL ROOMS AND SPACES SHOWN IN THE NEW
 MECHANICAL PLANS, AND PROVIDE MINIMUM VENTILATION
 CALCULATIONS PER TABLE 403.3.
  
 3) PROVIDE A REVISED REFLECTIVE CEILING PLAN.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved