|
 |
 |
 |
 |
 |
Plan Review Details - Permit 18030464
| Plan Review Stops For Permit 18030464 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2018-04-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-04-02 |
Time |
08:43 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-04-02 |
Time |
07:58 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2018-03-21 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-03-21 |
Time |
17:42 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-03-21 |
Time |
15:40 |
Sent To |
I |
|
| Notes |
| 2018-03-21 15:20:51 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | THERE IS A PERMIT #18020529 THAT WAS ISSUED TO REPLACE | | | THE EXISTING CAST IRON SEWER PIPES WITH PVC. IT APPEARS | | | THAT THIS PERMIT IS FOR REPLACING THE CONCRETE THAT WAS | | | CUT AND REMOVED TO ACCESS THE BUILDING DRAIN AND SEWER. | | | | | | 1) PROVIDE TWO SETS OF A FLOOR PLAN THAT SHOWS THE | | | DIMENSIONS AND THICKNESS OF THE CONCRETE THAT IS BEING | | | INSTALLED. FBC-R 606.1 | | | | | | 2) SHOW COMPLIANCE WITH FBC-R 318.1 FOR TERMITE | | | PROTECTION. | | | | | | 3) SHOW COMPLIANCE WITH FBC-R506.2.3 FOR A VAPOR | | | RETARDER (6-MIL POLYETHYLENE). | | | | | | 4) SHOW COMPLIANCE WITH FBC-R506.2.4.2 WHICH REQUIRES | | | FIBER MESH CONCRETE OR WELDED WIRE REINFORCEMENT WIRE | | | TO CONTROL CRACKING. | | | | | | 5) IN ORDER TO PREVENT SETTLEMENT OF THE PATCHED AREAS, | | | PROVIDE DETAILS ON DOWELING INTO THE EXISTING CONCRETE | | | PER ACI 332. FBC-R506.1 | | | | | | | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2018-04-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-04-02 |
Time |
08:43 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-03-22 |
Time |
11:40 |
Sent To |
|
|
| Notes |
| 2018-03-23 11:40:32 | RESUB ROUTED TO ZONING INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-03-21 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-03-21 |
Time |
17:42 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-03-09 |
Time |
12:46 |
Sent To |
|
|
| Notes |
| 2018-03-12 12:46:37 | ROUTED TO ZONING |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2018-04-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-04-02 |
Time |
07:58 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-04-02 |
Time |
07:58 |
Sent To |
|
|
| Notes |
| 2018-04-02 07:58:56 | APPROVED BY P. GRIELICH ON 3/27/18 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2018-03-14 |
|
|
Cont ID |
|
| Sent By |
PG |
Date |
2018-03-14 |
Time |
14:48 |
Rev Time |
0.00 |
| Received By |
pgreilic |
Date |
2018-03-14 |
Time |
10:36 |
Sent To |
B |
|
| Notes |
| 2018-03-14 14:51:23 | 1.) SHOW PROPOSED SETBACKS FOR PATIO (DISTANCE FROM | | | OUTSIDE OF PATIO TO SIDE AND REAR PROPERTY LINES) | | | | | | PAUL GREILICH, SENIOR PLANNER | | | 561-822-1443 | | | [email protected] |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |