Plan Review Details - Permit 18030202
Plan Review Stops For Permit 18030202
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-04-09 Cont ID  
Sent By aclange Date 2018-04-09 Time 13:48 Rev Time 0.00
Received By aclange Date 2018-04-09 Time 13:43 Sent To  
Notes
2018-04-09 13:48:53PREVIOUSLY REVIEWED. NO OTHER CHANGES OTHER THAN
 MECHANICAL RESUBMITTAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-03-19 Cont ID  
Sent By jwitmer Date 2018-03-19 Time 07:37 Rev Time 0.00
Received By aclange Date 2018-03-13 Time 13:03 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-03-21 Cont ID  
Sent By jleahy Date 2018-03-21 Time 12:10 Rev Time 0.00
Received By jleahy Date 2018-03-21 Time 12:10 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2018-03-20 Cont ID  
Sent By pleduc Date 2018-03-20 Time   Rev Time 0.00
Received By pleduc Date 2018-03-13 Time 11:02 Sent To  
Notes
2018-03-20 13:36:51THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 1) THERE IS A FIREPLACE INDICATED ON SHEET A6-31 AS
 HEARTHCABINET MODEL NUMBER HC92000. I COULD NOT FIND
 SPEC SHEETS WITH THIS SUBMITTAL NOR ONLINE TO VERIFY
 ITS LISTING OR INSTALL RECOMMENDATIONS.
  
 AS TO NOT HOLD UP THIS PROJECT, PLEASE PROVIDE THE
 SPECS AND LISTING AND ENSURE BOTH ARE COMPLIED WITH FOR
 THE INSTALLATION.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2018-04-23 Time   Rev Time 0.00
Received By lmarchan Date 2018-04-05 Time 07:46 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-03-23 Cont ID  
Sent By gjohnson Date 2018-03-23 Time 07:30 Rev Time 0.00
Received By gjohnson Date 2018-03-07 Time 08:00 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2018-05-07 Cont ID  
Sent By ccole Date 2018-05-07 Time 12:21 Rev Time 0.00
Received By ccole Date 2018-04-20 Time 17:07 Sent To  
Notes
2018-05-07 08:18:59MECHANICAL PROVISO
 5/7/2018
  
 1) IN RESPONSE TO COMMENT #2 FROM THE 1ST REVIEW
 CONCERNING THE INSTALLATION OF THE FIRE/SMOKE DAMPERS
 IN THE FLAMEBAR DUCTS, THE INSTALLATIONS ARE GRANTED A
 PROVISO PENDING FIELD APPROVAL BY CHIEF HAROLD MOSER.
2018-04-23 12:23:142ND REVIEW FBC-2010 MECHANICAL
 THE BRISTOL
 REVISION #18030202
 MASTER #15111020
 4/23/18
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) IN RESPONSE TO COMMENT #2 FROM THE 1ST REVIEW
 CONCERNING THE INSTALLATION OF THE FIRE/SMOKE DAMPERS
 IN THE FLAMEBAR DUCTS, THE INSTALLATIONS ARE GRANTED A
 PROVISO PENDING FIELD APPROVAL BY CHIEF HAROLD MOSER.
  
 3) PLEASE EITHER UPDATE SHEET M2.55B (18-19 TIER 2) TO
 MATCH THE REVISIONS SHOWN ON M2.55C (19 TIER 2) , OR
 ELIMINATE M2.55B AND REVISE M2.55C TO INCLUDE THE 18TH
 FLOOR.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2018-03-21 Cont ID  
Sent By ccole Date 2018-03-21 Time 15:28 Rev Time 0.00
Received By ccole Date 2018-03-19 Time 18:00 Sent To  
Notes
2018-03-21 16:00:511ST REVIEW FBC-2010 MECHANICAL
 THE BRISTOL
 REVISION #18030202
 MASTER #15111020
 3/21/18
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEETS M2.05- M2.25: PLEASE CLARIFY THE PURPOSE OF
 THE NEW SMOKE DAMPERS SHOWN ON THE O/A DUCT DROPS IN
 THE NORTH AND SOUTH CORE CEILINGS. CLARIFY HOW THE
 DAMPERS ARE TO BE ACTUATED AND IF THEY ARE PART OF THE
 SMOKE CONTROL SYSTEM. UPDATE ALL CONTROL DETAILS IF
 APPLICABLE. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR
 THE DAMPERS AND PROVIDE INSTALLATION DETAILS ON THE
 PLAN.
  
 2) M2.05- M2.25 PROVIDE MANUFACTURER'S SPECIFICATIONS
 FOR THE FIRE/SMOKE DAMPERS SHOWN IN THE CORES WHERE THE
 FLAMEBAR DUCT CONNECTS WITH THE CONVENTIONAL DUCTWORK.
 THE SPECS MUST INDICATE THAT THE PROPOSED INSTALLATIONS
 ARE CONSISTENT WITH THE UL 555, UL 555S, AND/OR UL 555C
 TESTING STANDARDS- SECTION 607.3.1.
  
 3) M2.26: IT APPEARS THAT THE 12X12 AIR INTAKE BY THE
 NEW EF-R2 IS MISLABELED AND SHOULD BE LABELED AS AN
 EXHAUST OUTLET.
  
 4) M.55B: BESIDES THE RELOCATION OF ONE HP, THE PLAN IS
 ALSO INDICATING OTHER HP CHANGES THROUGHOUT THE SPACE.
 PLEASE PROVIDE A MORE DESCRIPTIVE NARRATIVE THAT
 ITEMIZES ALL THE CHANGES, AND UPDATED ENERGY AND AC
 CALCULATIONS IF APPLICABLE.
  
 5) M.55C: TO HELP EXPEDITE THE REVIEW, PLEASE UPLOAD
 THE ORIGINAL PLAN SHEET FOR COMPARISON.
  
 6) M2.57B & M2.58B: THE DETAIL OF THE REROUTED DUCTS IN
 THE UTILITY ROOM IS INCOMPLETE- THE RETURN GRILLS AND
 FSD'S ARE NOT SHOWN.
  
 7) M61.A: NO DUCTS ARE SHOWN ON THE PLAN- PLEASE
 CLARIFY.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2018-03-23 Cont ID  
Sent By gjohnson Date 2018-03-23 Time 07:25 Rev Time 0.00
Received By gjohnson Date 2018-03-23 Time 05:03 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2018-03-19 Cont ID  
Sent By aclange Date 2018-03-19 Time 07:37 Rev Time 0.00
Received By aclange Date 2018-03-19 Time 07:37 Sent To  
Notes
2018-04-23 13:12:53MECH SIGS GOOD- CCOLE-4/23/18
2018-03-23 07:29:413/23/18 DIG SIG OK ON PLUMB/GPJ
2018-03-21 17:40:04MECH DIG/SIGS GOOD- CCOLE-3/21/18
2018-03-19 07:37:33SIGNATURES OK

Review Stop Z ZONING
Rev No 1 Status P Date 2018-03-21 Cont ID  
Sent By jroach Date 2018-03-21 Time 16:23 Rev Time 0.00
Received By jroach Date 2018-03-21 Time 16:23 Sent To  
Notes
2018-03-21 16:24:41PLEASE NOTE THAT ALL PROVISOS LISTED ON THE ORIGINAL
 APPROVED PERMIT REVIEW REMAIN ACTIVE AND SHALL BE
 ADDRESSED ACCORDINGLY.
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 F: 561.822.1460
  
 E: [email protected]
  
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved