Plan Review Details - Permit 18020762
Plan Review Stops For Permit 18020762
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2018-03-26 Cont ID  
Sent By rmcdouga Date 2018-03-26 Time 18:03 Rev Time 0.00
Received By rmcdouga Date 2018-03-26 Time 18:02 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2018-03-15 Cont ID  
Sent By rmcdouga Date 2018-03-15 Time 07:59 Rev Time 0.00
Received By rmcdouga Date 2018-03-15 Time 07:16 Sent To I
Notes
2018-03-15 08:24:55PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE SPECIFICATIONS SUBMITTED ARE FOR A 24 KW KOHLER
 GENERATOR WITH MODEL NUMBER 24 RCL. THE AMERICAST
 GENERATOR PAD ENGINEERING DOES NOT LIST THE 24 KW
 KOHLER, MODEL 24 RCL. SUBMIT TWO SETS OF ENGINEERING
 AND SPECIFICATIONS THAT MATCH. FBC 107.2.1
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-03-06 Cont ID  
Sent By rmcdouga Date 2018-03-06 Time 19:00 Rev Time 0.00
Received By rmcdouga Date 2018-03-06 Time 19:00 Sent To I
Notes
2018-03-06 19:03:16PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE GENERATOR PAD DRAWINGS HAVE SEVERAL REFERENCES
 TO THE FBC FIFTH EDITION (2014). THE FBC SIXTH EDITION
 (2017) WENT INTO EFFECT ON JANUARY 1, 2018. ALL NEW
 PERMITS APPLIED FOR ON OR AFTER THAT DATE ARE REQUIRED
 TO COMPLY WITH AND REFERENCE THE FBC SIXTH EDITION
 (2017). FS CHAPTER 553
  
 2) THE ENGINEER THAT IS ON THE SLAB ANCHORING PLANS,
 RONALD H. WILSON P.E. LICENSE NO. 9710, HAS HAD HIS FL
 ENGINEERING LICENSE REVOKED SINCE 2/28/2017. SUBMIT
 PLANS FROM A CURRENTLY LICENSED FL ENGINEER. FS 471
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-03-13 Cont ID  
Sent By jleahy Date 2018-03-13 Time 16:22 Rev Time 0.00
Received By jleahy Date 2018-03-13 Time 16:22 Sent To G
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-03-02 Cont ID  
Sent By jleahy Date 2018-03-02 Time 09:58 Rev Time 0.00
Received By jleahy Date 2018-03-02 Time 09:58 Sent To  
Notes
2018-03-02 09:58:54NEED CUT SHEETS FOR TRANSFER SWITCH

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2018-03-13 Cont ID  
Sent By lcrespo Date 2018-03-13 Time 16:56 Rev Time 0.00
Received By lcrespo Date 2018-03-13 Time 16:37 Sent To B
Notes
2018-03-13 17:02:1203/13/18 APPROVED BY GAS AND SENT TO BUILDING, LAC

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-02-28 Cont ID  
Sent By lcrespo Date 2018-02-28 Time 16:14 Rev Time 0.00
Received By lcrespo Date 2018-02-28 Time 16:13 Sent To  
Notes
2018-02-28 16:17:48DENIED
  
 1. PE PIPE UNDER CONCRETE SLAB SHALL BE ENCASED IN A
 PROTECTIVE SLEEVE, SHOW ON THE ISOMETIC PLANS WHERE AND
 HOW LONG FBC FG G2415.6 UNDERGROUND PENETRATIONS.
  
 2. TABLES SUBMITTED ARE AND ARE NOT THE RECENTLY
 APPROVED. THE COPY OF THE TABLE FBC FG 2009 IS FROM AN
 OUTDATED FUEL GAS CODE. THE FUEL GAS CODE IN EFFECT IS
 THE 2017 FBC FUEL GAS. SUBMIT TWO COPIES OF THE CORRECT
 SIZING TABLE. WPB AMENDMENTS TO THE FBC SEC. 107.2.1.
  
 3. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS THE
 TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH
 APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH
 APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF
 PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE
 EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE
 SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE
 REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES
 2017 FBC FUEL GAS SECS. 401.4, 401.8, 402.1, 402.2,
 402.3 OR 2017 FBC FUEL GAS RES. SECS.G2412.4, G2412.8,
 G2413.1, G2413.2, G2413.3.
  
 4. THE MANUFACTURER'S SPECIFICATIONS FOR THE GENERATOR
 SHALL BE ONSITE FOR FINAL GAS INSPECTION. BTU RATING ON
 DORMANT FLEX LINE MUST NOT BE EXCEEDED.
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 [email protected]
 561-805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-03-26 Cont ID  
Sent By rmcdouga Date 2018-03-26 Time 18:03 Rev Time 0.00
Received By rmcdouga Date 2018-03-23 Time 13:30 Sent To  
Notes
2018-03-26 13:30:30RESUB ROUTED TO RMCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-03-15 Cont ID  
Sent By rmcdouga Date 2018-03-15 Time 07:59 Rev Time 0.00
Received By rmcdouga Date 2018-03-09 Time 13:20 Sent To  
Notes
2018-03-12 13:20:13RESUB ROUTED TO JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-03-06 Cont ID  
Sent By rmcdouga Date 2018-03-06 Time 19:00 Rev Time 0.00
Received By rmcdouga Date 2018-02-20 Time 10:31 Sent To  
Notes
2018-02-21 10:31:32ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date   Cont ID  
Sent By PG Date 2018-02-27 Time   Rev Time 0.00
Received By pgreilic Date 2018-02-26 Time 15:59 Sent To  
Notes
2018-02-27 16:57:201.) LANDSCAPE SCREENING REQUIRED
  
 PAUL GREILICH, SENIOR PLANNER