| 2018-02-27 05:16:23 | 02/26/2018 1ST GAS REVIEW**DENIED** |
| | |
| | |
| | 1) THE VALUE OF THE JOB SEEMS LOW AND MUST INCLUDE THE |
| | TOTAL COST OF ALL LABOR, MATERIAL, AND PROFIT. PLEASE |
| | PROVIDE A BONA FIDE SIGNED CONTRACT TO COMPLY WITH WPB |
| | AMEND 109.3.BUILDING PERMIT VALUATIONS. IF, IN THE |
| | OPINION OF THE BUILDING OFFICIAL, THE CLAIMED VALUATION |
| | OF |
| | BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| | DENIED, UNLESS THE APPLICANT CAN SHOW |
| | DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED |
| | CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE |
| | APPROVAL OF THE BUILDING OFFICIAL. FOR PERMITTING |
| | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL |
| | BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING |
| | ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE |
| | LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION |
| | COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), |
| | AS PUBLISHED BY INTERNATIONAL CODE CONGRESS. |
| | FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| | BUILDING OFFICIAL. |
| | |
| | 2) CITY RECORDS SHOW AN EXISTING GAS SYSTEM ON THIS |
| | PROPERTY. THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST |
| | BE ADDED INTO THE TOTAL BTU LOAD ON THE SYSTEM TO |
| | ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED. IF |
| | UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO |
| | ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS PIPING |
| | RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING |
| | APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE |
| | SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE |
| | DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT |
| | OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF |
| | THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN |
| | A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO |
| | 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE |
| | EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1, |
| | 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1, |
| | G2413.2, G2413.3. |
| | |
| | 3) INDICATE ON THE PLAN IF THE TANKLESS WATER HEATER IS |
| | REPLACING AN EXISTING TANKLESS WATER HEATER OR IS IT |
| | REPLACING A STORAGE TANK TYPE WATER HEATER OR IS IT |
| | BEING ADDED TO THE EXISTING HOT WATER SYSTEM? INDICATE |
| | ON THE APPLICATION IN THE DESCRIPTION OF WORK. FBC |
| | 107.2.1 |
| | |
| | 4) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 |
| | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1 |
| | |
| | |
| | TIM HUNT |
| | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | 561-805-6695 |
| | [email protected] |
| | |