Plan Review Details - Permit 18020458
Plan Review Stops For Permit 18020458
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2018-03-02 Cont ID  
Sent By squinone Date 2018-03-02 Time   Rev Time 0.00
Received By squinone Date 2018-03-02 Time   Sent To I
Notes
2018-03-02 10:40:241) REPLACE EXISTING ASPHALT APRON TO 6-INCH THICK
 CONCRETE, 3000 PSI. REFER TO CITY STANDARD DETAIL GC-6
 FOR MORE INFORMATION.
 2) PROPOSED CONCRETE DRIVEWAY MUST MAINTAIN
 SWALE/UNINTERRUPTED SLOPES.
 3) REQUIRED TO SUBMIT CONCRETE TICKETS FROM THE
 CONCRETE COMPANY.
 4) CONTRACTOR MUST CALL SUNSHINE 811 PRIOR TO DIGGING
 FOR UTILITY LOCATES.
  
 SOFIA QUINONES-BENEJAM, EI
 PROJECT ENGINEER
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33402
 (MAILING ADDRESS: PO BOX 3366)
 P: 561.494.1108
 C: 561.459.6518
 F: 561.494.1116
 EMAIL: [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-03-02 Cont ID  
Sent By cpuell Date 2018-03-02 Time 15:14 Rev Time 0.00
Received By cpuell Date 2018-02-12 Time 10:46 Sent To  
Notes
2018-02-13 10:46:34ROUTED TO ZONING

Review Stop Z ZONING
Rev No 1 Status P Date 2018-02-26 Cont ID  
Sent By ajones Date 2018-02-26 Time 15:33 Rev Time 0.00
Received By ajones Date 2018-02-16 Time 10:54 Sent To ENG
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved