Plan Review Details - Permit 18020397
Plan Review Stops For Permit 18020397
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-03-08 Cont ID  
Sent By rmcdouga Date 2018-03-08 Time 18:36 Rev Time 0.00
Received By rmcdouga Date 2018-03-08 Time 18:36 Sent To G
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-02-13 Cont ID  
Sent By rmcdouga Date 2018-02-13 Time 18:43 Rev Time 0.00
Received By rmcdouga Date 2018-02-13 Time 18:43 Sent To  
Notes
2018-02-13 18:51:15PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE ENGINEER THAT IS ON THE SLAB ANCHORING PLANS,
 RONALD H. WILSON P.E. LICENSE NO. 9710, HAS HAD HIS FL
 ENGINEERING LICENSE REVOKED SINCE 2/28/2017. SUBMIT
 PLANS FROM A CURRENTLY LICENSED FL ENGINEER. FS 471
  
 2) THE DATE ON THE SLAB ENGINEERING IS NOVEMBER 3,
 2014. PLEASE INFORM THE PERSON THAT IS PROVIDING THESE
 OUTDATED DRAWINGS THAT THE ENGINEER'S LICENSE IS
 REVOKED AND THEY NEED TO DISPOSE OF ANY MORE OF THESE
 THAT ARE IN THEIR POSSESION.
  

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2018-05-10 Cont ID  
Sent By jleahy Date 2018-05-10 Time 14:50 Rev Time 0.00
Received By jleahy Date 2018-05-10 Time 14:50 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2018-03-28 Cont ID  
Sent By jleahy Date 2018-03-28 Time 13:46 Rev Time 0.00
Received By jleahy Date 2018-03-28 Time 13:46 Sent To G
Notes
2018-03-28 13:46:42SAME NOTE AS THE LAST TWO TIMES JLEAHY

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2018-03-07 Cont ID  
Sent By jleahy Date 2018-03-07 Time 16:37 Rev Time 0.00
Received By jleahy Date 2018-03-07 Time 16:37 Sent To  
Notes
2018-03-07 16:38:26RISER DIAGRAM STILL SHOWS 38KW GENERATOR AND SUBMITALS
 SHOW 48KW
  
 PLEASE CORRECT RISER TO REFLECT 48KW GENERATOR

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-02-15 Cont ID  
Sent By jleahy Date 2018-02-15 Time 10:30 Rev Time 0.00
Received By jleahy Date 2018-02-15 Time 10:30 Sent To  
Notes
2018-02-15 10:31:27WHAT SIZE IS THE GENERATOR 38KW OR 48KW?
  
 PAPER WORK SHOWS BOTH

Review Stop G GAS REVIEW
Rev No 5 Status P Date 2018-05-10 Cont ID  
Sent By tklarge Date 2018-05-10 Time 13:31 Rev Time 0.00
Received By tklarge Date 2018-05-10 Time 13:31 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 4 Status F Date 2018-05-07 Cont ID  
Sent By tklarge Date 2018-05-07 Time 12:43 Rev Time 0.00
Received By tklarge Date 2018-05-07 Time 09:18 Sent To I
Notes
2018-05-07 10:13:381) THE SUBMITTTED SIZING TABLES FOR THE GAS SYSTEM ARE
 FROM THE 2014 FBC-FUEL GAS CODE. THE CODE IN EFFECT FOR
 THIS PERMIT IS THE 2017 FBC-FUEL GAS.SUBMIT TWO COPIES
 OF THE SIZING TABLES FROM THE 2017 FBC-FUEL GAS CODE.
 4TH REQUEST.
 2) THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE
 ADDED INTO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE
 THE EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED,
 THE EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE
 OPERATING SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM
 THAT SHOWS THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD
 OF EACH APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO
 EACH APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH
 OF PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE
 EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE
 SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE
 REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES.
 FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR
 SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3.
 3) SHOW THE DISTANCE FROM THE MEDIUM PRESSURE REGULATOR
 FOR THE EXISTING APPLIANCES TO THE MOST REMOTE OUTLET
 ON THE SYSTEM.
 4) A GAS SIZING TABLE FOR SCH. 40 METALLIC PIPE 2 PSI
 SHOWING A 70 FEET LENGTH HAS BEEN SUBMITTED AND ALSO A
 SIZING TABLE FOR PE PIPE AT A 2 PSI SYSTEM AT 90 FEET
 LENGTH. WHICH IS IT? METALLIC PIPE IS NOT PERMITTED TO
 BE UNDERGROUND PER 2017 FBC - FUEL GAS SEC. 404.11.1.
 THE PE PIPE IS UNDERSIZED IF THE LENGTH IS 90 FEET. THE
 MAXIMUM BTU LOAD IS 1,130,000. CLARIFY.
 5) SIZE THE PIPE FROM THE GAS METER TO THE FIRST TEE
 AND ALSO FROM THE TEE FITTING TO THE MEDIUM PRESSURE
 REGULATOR FOR THE EXISTING APPLIANCES.
  
 NOTE: SOMEONE FROM THE CONTRACTOR NEEDS TO COME TO THE
 BUILDING DIVISION AND STRAIGHTEN OUT ALL THE PAPERWORK
 INTO TWO COMPLETE PACKAGES FOR PLAN REVIEW. AS OF NOW,
 THIS PAPERWORK IS A CONFUSING MESS.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop G GAS REVIEW
Rev No 3 Status F Date 2018-03-28 Cont ID  
Sent By thunt Date 2018-03-28 Time 14:34 Rev Time 0.00
Received By thunt Date 2018-03-28 Time 14:34 Sent To  
Notes
2018-03-28 14:46:4803/28/2018 3RD GAS REVIEW**DENIED** PLEASE CALL AND
 SPEAK TO TIM LARGE 561-805-6692 TO SET A MEETING DATE
 AND TIME TO REVIEW THE PLAN DEFICIENCIES AS THIS IS THE
 3RD REVIEW AND ONLY 3 OF 10 COMMENTS HAVE BEEN
 RESOLVED.DO NOT RESUBMIT WITHOUT FIRST HAVING A
 MEETING. IT IS ADVISED YOU ALSO CONTACT THE ELECTRIC
 PLAN REVIEW AND MEET AT THE SAME TIME.
  
 1) WE ARE CURRENTLY USING THE 2017 FBC CODE 6TH ED.
 YOUR PAPERWORK STILL REFERS TO THE 2014 FOR THE 3RD
 TIME
  
 2) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE. YOU ARE NOT SHOWING
 THE PIPING SIZE LEAVING THE GAS METER. 2017 FBC-FUEL
 GAS, SECS. 402.4.1, 402.4.2. OR 2017 FBC-RES SEC.
 G2413.4.1, G2413.4.2.
  
 3) SUBMIT FULL INSTALLATION MANUAL FOR THE GAS PRESSURE
 REGUALTOR. FGC 410.1
  
 4) SUBMIT 2 COPIES OF SIZING TABLES FOR ALL PIPING
 MATERIAL BEING USED. YOU SUPPLIED SCH 40 METALLIC
 SIZING CHART BUT YOUR ISOMETRIC SHOWS YOUR RUNNING NE
 P.E. SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1)
 THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8,
 G2413.1, G2413.2, & G2413.3.
  
 5) REVISE YOUR ISOMETRIC TO SHOW REQUIRED SEDIMENT TRAP
 ON THE GENERATOR. FGC 408.3
  
 6) YOUR PLAN STILL IS SHOWING BOTH 38KW AND 48KW.
 PLEASE REMOVE THE INCORRECT SHEETS. FBC 107.2.1
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2018-03-09 Cont ID  
Sent By thunt Date 2018-03-09 Time 05:45 Rev Time 0.00
Received By thunt Date 2018-03-09 Time 05:45 Sent To  
Notes
2018-03-09 05:49:5603/09/2018 2ND GAS REVIEW**DENIED**
  
 YOU HAVE FAILED TO ANSWER ANY OF MY COMMENTS OR ADDRESS
 ANY OF THE DRAWINGS. IF THE SUBMITTED PLANS ARE DENIED
 ON THE NEXT REVIEW A 4X PLAN REVIEW FEE WILL BE APPLIED
 TO THIS PERMIT PER FL STATE STATUE 553.80 (2B). IT IS
 IN YOUR BEST INTEREST TO MEET WITH THIS PLAN REVIEWER
 BEFORE SUBMITTING ANY OTHER PLANS EITHER FOR THIS OR
 OTHER JOBS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1) WHAT SIZE GENERATOR IS BEING USED? PLAN SHOWS BOTH
 38KW AND 48KW. FBC 107.2.1
  
 2) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL
 GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC. G2413
  
 3) WHAT IS THE EXISTING SYSTEM PRESSURE? IS IT YOUR
 INTENT TO CHANGE THE 12" WC TO 2LB SYSTEM OR IS THE
 SYSTEM ALREADY 2 PSI. FBC 107.2.1
  
 4) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS
 SECS.401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4
 (37) OR 2014 FBC-RES. SEC. G2413. THE PLANS INDICATE AN
 EXISTING GAS METER. THE BTU LOAD OF THE EXISTING GAS
 SYSTEM MUST BE ADDED INTO THE TOTAL BTU LOAD ON THE
 SYSTEM TO ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED.
 IF UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO
 ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS PIPING
 RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING
 APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE
 SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE
 DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT
 OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF
 THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN
 A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO
 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE
 EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1,
 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1,
 G2413.2, G2413.3
  
 5) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. 2017 FGC SEC.410.1.
  
 6) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS.
 A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY
 AHEAD OF EACH MP REGULATOR. FBC-FUEL GAS SEC.409.4,
 FBC-RESIDENTIAL SEC. G 2420.4. I
  
 7) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4
 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4,
 G2412.8, G2413.1, G2413.2, & G2413.3.
  
 8) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE
 APPLIANCE. COMPLY WITH 2017 FBC-FUEL GAS TABLE 402.4
 (28) FOR THE PROPER PIPE SIZE AND BTU LOAD
  
 9) REVISE YOUR FLAT DRAWING TO SHOW THE REQUIRED
 SEDIMENT TRAP. 2017 FBC-FUEL GAS 408.4.
  
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-02-16 Cont ID  
Sent By thunt Date 2018-02-16 Time 12:16 Rev Time 0.00
Received By thunt Date 2018-02-16 Time 12:16 Sent To I
Notes
2018-02-16 12:35:3002/16/2018 1ST GAS REVIEW**DENIED**
  
 PLEASE BE ADVISED THE CURRENT CODE IN EFFECT IN THE 6TH
 ED. 2017 FBC. SOME OF YOUR SIZING CHARTS REFERENCE THE
 2014 FBC
  
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1) WHAT SIZE GENERATOR IS BEING USED? PLAN SHOWS BOTH
 38KW AND 48KW. FBC 107.2.1
  
 2) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL
 GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC. G2413
  
 3) WHAT IS THE EXISTING SYSTEM PRESSURE? IS IT YOUR
 INTENT TO CHANGE THE 12" WC TO 2LB SYSTEM OR IS THE
 SYSTEM ALREADY 2 PSI. FBC 107.2.1
  
 4) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS
 SECS.401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4
 (37) OR 2014 FBC-RES. SEC. G2413. THE PLANS INDICATE AN
 EXISTING GAS METER. THE BTU LOAD OF THE EXISTING GAS
 SYSTEM MUST BE ADDED INTO THE TOTAL BTU LOAD ON THE
 SYSTEM TO ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED.
 IF UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO
 ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS PIPING
 RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING
 APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE
 SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE
 DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT
 OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF
 THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN
 A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO
 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE
 EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1,
 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1,
 G2413.2, G2413.3
  
 5) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. 2017 FGC SEC.410.1.
  
 6) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS.
 A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY
 AHEAD OF EACH MP REGULATOR. FBC-FUEL GAS SEC.409.4,
 FBC-RESIDENTIAL SEC. G 2420.4. I
  
 7) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4
 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4,
 G2412.8, G2413.1, G2413.2, & G2413.3.
  
 8) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE
 APPLIANCE. COMPLY WITH 2017 FBC-FUEL GAS TABLE 402.4
 (28) FOR THE PROPER PIPE SIZE AND BTU LOAD
  
 9) REVISE YOUR FLAT DRAWING TO SHOW THE REQUIRED
 SEDIMENT TRAP. 2017 FBC-FUEL GAS 408.4.
  
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2018-05-07 Cont ID  
Sent By tklarge Date 2018-05-07 Time 12:44 Rev Time 0.00
Received By tklarge Date 2018-05-01 Time 09:39 Sent To  
Notes
2018-05-02 09:39:49RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-03-28 Cont ID  
Sent By thunt Date 2018-03-28 Time 14:47 Rev Time 0.00
Received By thunt Date 2018-03-22 Time 12:43 Sent To I
Notes
2018-03-23 12:43:44RESUB ROUTED TO JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-03-09 Cont ID  
Sent By thunt Date 2018-03-09 Time 05:50 Rev Time 0.00
Received By thunt Date 2018-03-06 Time 10:31 Sent To  
Notes
2018-03-07 10:31:44RESUB ROUTED TO JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-02-15 Cont ID  
Sent By jleahy Date 2018-02-15 Time 10:34 Rev Time 0.00
Received By thunt Date 2018-02-08 Time 11:34 Sent To  
Notes
2018-02-09 11:35:01ROUTED TO ZONING

Review Stop Z ZONING
Rev No 2 Status P Date   Cont ID  
Sent By   Date 2018-05-04 Time   Rev Time 0.00
Received By pgreilic Date 2018-05-04 Time 14:14 Sent To G
Notes
2018-05-04 14:15:26LANDSCAPE SCREENING REQUIRED
  
 PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]

Review Stop Z ZONING
Rev No 1 Status P Date 2018-02-13 Cont ID  
Sent By PG Date 2018-02-13 Time 15:12 Rev Time 0.00
Received By pgreilic Date 2018-02-13 Time 11:59 Sent To  
Notes
2018-02-13 15:13:58LANDSCAPE SCREENING REQUIRED
  
 PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved