Plan Review Details - Permit 18020367
Plan Review Stops For Permit 18020367
Review Stop E ELECTRICAL
Rev No 3 Status P Date 2018-04-12 Cont ID  
Sent By jleahy Date 2018-04-12 Time 15:18 Rev Time 0.00
Received By jleahy Date 2018-04-12 Time 15:18 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2018-03-09 Cont ID  
Sent By jleahy Date 2018-03-09 Time 13:55 Rev Time 0.00
Received By jleahy Date 2018-03-09 Time 13:55 Sent To I
Notes
2018-03-09 14:20:57PLANS NEED TO BE SIGNED AND SEALED

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-02-15 Cont ID  
Sent By jleahy Date 2018-02-15 Time 13:24 Rev Time 0.00
Received By jleahy Date 2018-02-15 Time 13:24 Sent To I
Notes
2018-02-15 13:32:49FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 PLEASE CLAIRFY SCOPE OF WORK?
  
 APPLICATION STATES ELECTRIC TO AC SYSTEM!
  
 WHAT DOES PAGES E-01, THROUGH E-1.3, AND E-2.1, E-3.1.
 E-3.2, E-4.1 HAVE TO DO WITH THE AC SYSTEM?
  
 PG E-2.2 SHOWS NO SIZE OF BRANCH CIRCUIT OR WIRE SIZES,
 PLEASE IN CLUDE IN RESUBMITTAL.
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date   Cont ID  
Sent By   Date 2018-05-21 Time   Rev Time 0.00
Received By lmarchan Date 2018-05-16 Time 14:27 Sent To  
Notes
2018-05-17 14:27:40RESUB ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-04-12 Cont ID  
Sent By jleahy Date 2018-04-12 Time 15:19 Rev Time 0.00
Received By jleahy Date 2018-03-29 Time 13:15 Sent To  
Notes
2018-03-30 13:15:40RESUB ROUTED TO JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-03-09 Cont ID  
Sent By jleahy Date 2018-03-09 Time 14:21 Rev Time 0.00
Received By jleahy Date 2018-03-06 Time 11:37 Sent To  
Notes
2018-03-08 11:37:17RESUB ROUTED TO JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-02-15 Cont ID  
Sent By jleahy Date 2018-02-15 Time 13:33 Rev Time 0.00
Received By jleahy Date 2018-02-08 Time 13:29 Sent To  
Notes
2018-02-09 13:29:41ROUTED TO MECHANICAL INBOX

Review Stop M MECHANICAL (A/C)
Rev No 4 Status P Date 2018-05-21 Cont ID  
Sent By ccole Date 2018-05-21 Time 11:23 Rev Time 0.00
Received By ccole Date 2018-05-21 Time 11:23 Sent To I
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2018-04-09 Cont ID  
Sent By ccole Date 2018-04-09 Time 08:54 Rev Time 0.00
Received By ccole Date 2018-04-09 Time 08:54 Sent To  
Notes
2018-04-09 08:59:193RD REVIEW FBC-2017 MECHANICAL, WEST PALM BEACH
 AMENDMENTS TO THE FBC-17
 PERMIT #18020367
 4/9/18
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) ONE OF THE TWO APPROVED MECHANICAL PLANS HAS BEEN
 REMOVED FROM THE PLAN SETS, AND THE OTHER IS INCLUDED
 IN A VOIDED SET. PLEASE PROVIDE NEW MECHANICAL PLANS OR
 ATTACH THE PREVIOUSLY APPROVED PLANS INTO THE NEW
 ELECTRICAL PLAN SETS- SECTION 107.2.1 WPB AMENDMENTS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2018-03-09 Cont ID  
Sent By ccole Date 2018-03-09 Time 09:31 Rev Time 0.00
Received By ccole Date 2018-03-09 Time 09:31 Sent To E
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2018-02-13 Cont ID  
Sent By ccole Date 2018-02-13 Time 15:47 Rev Time 0.00
Received By ccole Date 2018-02-13 Time 15:47 Sent To E
Notes
2018-02-13 15:55:411ST REVIEW FBC-2017 MECHANICAL
 PERMIT #18020367
 2/13/18
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) CLARIFY HOW THE NEW SYSTEM WAS SIZED- PROVIDE HEAT
 LOAD CALCULATIONS- SECTION 312.1
  
 2) CONTINUOUS VENTILATION IS REQUIRED IN THE POWER
 (BATTERY STORAGE) ROOM AT A RATE THAT WILL LIMIT THE
 MAXIMUM CONCENTRATION OF HYDROGEN TO 1.0 % OF THE TOTAL
 VOLUME OF THE ROOM- SECTION 502.4.1 THE MINIMUM RATE
 SHALL BE NOT LESS THAN 1.0 CFM PER SQ. FT. - SECTION
 502.4.2.
  
 3) PROVIDE THE WIND LOAD DESIGN CRITERIA AND ENGINEERED
 DETAILS FOR INSTALLATION OF THE EXTERIOR CONDENSER-
 SECTION 1609 FBC-17 BUILDING.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved