Plan Review Details - Permit 18020209
Plan Review Stops For Permit 18020209
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-02-15 Cont ID  
Sent By jleahy Date 2018-02-15 Time 10:35 Rev Time 0.00
Received By jleahy Date 2018-02-15 Time 10:34 Sent To G
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2018-03-30 Cont ID  
Sent By lcrespo Date 2018-03-30 Time 17:35 Rev Time 0.00
Received By lcrespo Date 2018-03-30 Time 17:35 Sent To  
Notes
2018-03-30 17:37:5303/30/18 APPROVED BY PLUMBING AND SENT TO PROCESSING,
 LAC

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-02-16 Cont ID  
Sent By thunt Date 2018-02-16 Time 05:56 Rev Time 0.00
Received By thunt Date 2018-02-16 Time 05:56 Sent To  
Notes
2018-02-16 06:35:3202/16/2018 1ST GAS REVIEW**DENIED**
  
 YOU PLANS CONTINUE TO HAVE THE SAME DEFICIENCIES EVEN
 AFTER REVIEWING WITH YOUR STAFF OVER THE PHONE AND
 HAVING SITE MEETINGS. IN ORDER TO HELP ME HELP YOU
 PLEASE PROVIDE THE FOLLOWING ON EACH GAS PERMIT.
  
 1) PROVIDE TOTAL BTU OF ANY EXISTING SYSTEM. THIS PLAN
 SHOWS NO EXISTING SYSTEM BUT CITY RECORDS OF A RECENT
 PERMIT SHOW A GAS POOL HEATER AND RANGE. REFER TO THE
 2017 FBC-FUEL GAS SECS.401.8 THRU 402.6.1 AND TABLES
 402.4 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2413.
  
 2) THE CURRENT CODE IN EFFECT IS THE 2017 FBC FUEL AND
 GAS BUT YOU CONTINUE TO LIST AND PROVIDE SIZING TABLES
 AS 2014.
  
 3) PROVIDE THE CORRECT SIZING TABLES. YOU CONTINUE TO
 NOT PROVIDE THE REQUIRE SIZING TABLES FOR SCH 40
 METALLIC PIPE .5 LB. REFER TO THE 2017 FBC- FUEL GAS
 SEC 402.4
  
 4) EXPLAIN YOUR INTENT TO CHANGE PIPING PRESSURES OF
 THE SYSTEM. THIS PLAN SHOWS A 2LB SYSTEM BUT AGAIN
 RECENT CITY RECORDS SHOW THIS AS A 12" WC (.5LB)
 SYSTEM. IS IT YOUR INTENT TO UPGRADE THE ENTIRE SYSTEM
 TO A 2LB SYSTEM? WPB AMEND 107.2.1
  
 5) IF YOUR DESIGNED SYSTEM IS GOING TO BE 2LB YOU MUST
 PROVIDE THE COMPLETE GAS REGULATOR INSTALLATION MANUAL.
 THIS PLAN SHOW IT AS A 2LB SYSTEM BUT NO INFORMATION ON
 THE GAS REGULATORS PROVIDED. 2017 FBC- FUEL GAS SEC
 410.1
  
  
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-03-30 Cont ID  
Sent By lcrespo Date 2018-03-30 Time 17:36 Rev Time 0.00
Received By lcrespo Date 2018-03-26 Time 11:41 Sent To  
Notes
2018-03-27 11:41:33RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-02-16 Cont ID  
Sent By thunt Date 2018-02-16 Time 06:37 Rev Time 0.00
Received By thunt Date 2018-02-06 Time 09:12 Sent To I
Notes
2018-02-07 09:12:15ROUTED TO ZONING

Review Stop Z ZONING
Rev No 2 Status P Date 2018-03-30 Cont ID  
Sent By ajones Date 2018-03-30 Time 08:36 Rev Time 0.00
Received By ajones Date 2018-03-30 Time 08:36 Sent To G
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2018-02-13 Cont ID  
Sent By llouie Date 2018-02-13 Time   Rev Time 0.00
Received By llouie Date 2018-02-13 Time 11:10 Sent To P
Notes
2018-02-13 15:45:19** FAILED **
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR ON THE PLANS WHERE
 APPLICABLE:
  
 1.) PLAN DIFFICULT TO READ. SHOW THE APPROXIMATE
 LOCATION OF THE PROPOSED GENERATOR ON THE PROPERTY WITH
 SETBACK DIMENSIONS FROM THE PROPERTY LINES.
  
 NOTES:
  
 * REVISIONS MAY RESULT IN ADDITIONAL COMMENTS.
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE
 QUESTIONS.
  
 * ZONE: SF7
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved