Plan Review Details - Permit 18020046
Plan Review Stops For Permit 18020046
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2018-02-27 Cont ID  
Sent By squinone Date 2018-02-27 Time   Rev Time 0.00
Received By squinone Date 2018-02-27 Time   Sent To I
Notes
2018-02-27 11:21:031) CONTRACTOR MUST CALL SUNSHINE 811 PRIOR TO DIGGING
 FOR UTILITY LOCATES.
 2) CONCRETE DRIVEWAYS WITHIN CITY'S RIGHT-OF-WAY MUST
 BE 6-INCH THICK, 3000 PSI AND AT EXISTING SWALE GRADE.
  
 SOFIA QUINONES-BENEJAM, EI
 PROJECT ENGINEER
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33402
 (MAILING ADDRESS: PO BOX 3366)
 P: 561.494.1108
 C: 561.459.6518
 F: 561.494.1116
 EMAIL: [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-02-28 Cont ID  
Sent By cpuell Date 2018-02-28 Time 09:27 Rev Time 0.00
Received By cpuell Date 2018-02-01 Time 12:36 Sent To  
Notes
2018-02-02 12:37:03ROUTED TO ZONING

Review Stop Z ZONING
Rev No 1 Status P Date 2018-02-13 Cont ID  
Sent By ajones Date 2018-02-13 Time 15:00 Rev Time 0.00
Received By ajones Date 2018-02-07 Time 10:22 Sent To ENG
Notes
***NONE***