Plan Review Details - Permit 18010525
Plan Review Stops For Permit 18010525
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2018-01-31 Cont ID  
Sent By Mgonzale Date 2018-01-31 Time   Rev Time 1.00
Received By mgonzale Date 2018-01-31 Time   Sent To I
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2018-02-09 Cont ID  
Sent By pleduc Date 2018-02-09 Time   Rev Time 0.00
Received By pleduc Date 2018-02-09 Time 10:24 Sent To I
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2018-01-18 Cont ID  
Sent By pleduc Date 2018-01-18 Time   Rev Time 0.00
Received By pleduc Date 2018-01-18 Time 12:19 Sent To ENG
Notes
2018-01-18 15:25:03THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) THE LINE INDICATED AS "F" AND CONNECTED TO THE FDC
 APPEARS TO RUN UNDER OR INTO THE BUILDING SLAB.
  
 THERE IS NO DETAIL INDICATED ON WHERE OR HOW THIS LINE
 "F" ATTACHED TO THE SPRINKLER SYSTEM.
  
 PLEASE PROVIDE DETAILS ON WHERE THIS FDC LINE ATTACHES
 TO THE SPRINKLER SYSTEM.
  
  
  
 2) THE LINE INDICATED AS "F" AND CONNECTED TO THE FDC
 APPEARS TO RUN UNDER OR INTO THE BUILDING SLAB.
  
 PER NFPA 13
  
 10.6 PROTECTION AGAINST DAMAGE. [24:10.6]
 10.6.1 PIPE SHALL NOT BE RUN UNDER BUILDINGS.
 [24:10.6.1]
 10.6.2 WHERE PIPE MUST BE RUN UNDER BUILDINGS, SPECIAL
 PRECAUTIONS SHALL BE TAKEN, INCLUDING THE FOLLOWING:
 (1) ARCHING THE FOUNDATION WALLS OVER THE PIPE
 (2) RUNNING PIPE IN COVERED TRENCHES
 (3) PROVIDING VALVES TO ISOLATE SECTIONS OF PIPE UNDER
 BUILDINGS [24:10.6.2]
  
  
 PLEASE REVIEW AND CORRECT OR PROVIDE JUSTIFICATIONS.
  
  
 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-02-12 Cont ID  
Sent By cpuell Date 2018-02-12 Time 09:51 Rev Time 0.00
Received By cpuell Date 2018-02-07 Time 10:20 Sent To  
Notes
2018-02-08 10:20:54ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-01-31 Cont ID  
Sent By cpuell Date 2018-01-31 Time 11:02 Rev Time 0.00
Received By cpuell Date 2018-01-16 Time 11:40 Sent To  
Notes
2018-01-17 11:40:16ROUTED TO FIRE INBOX

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2018-01-18 Cont ID  
Sent By pleduc Date 2018-01-18 Time   Rev Time  
Received By pleduc Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved