| Plan Review Stops For Permit 18010461 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2018-03-05 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-03-05 |
Time |
14:44 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2018-03-05 |
Time |
08:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2018-01-29 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2018-01-29 |
Time |
08:39 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2018-01-29 |
Time |
07:30 |
Sent To |
E |
|
| Notes |
| 2018-01-29 08:40:38 | BUILDING PLAN REVIEW | | | 2017 FLORIDA BUILDING CODE W/2010 WEST PALM BEACH | | | AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1 | | | ADMINISTRATION | | | | | | CHRISTOPHER S. THROOP, C.B.O. | | | PLANS EXAMINER, PX3169 | | | CONSTRUCTION SERVICES DIVISION | | | TEL: 561-805-6726 | | | FAX: 561-805-6676 | | | | | | 1ST REVIEW | | | RESULTS: DENIED | | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | | | | | SUBMITTAL STATES THE PHOTOVOLTAIC SYSTEM HAS BEEN | | | CERTIFIED PER CHPT. 377, TITLES XXVIII OF THE 2017 FBC | | | AND THE DESIGN WIND LOADS HAVE BEEN EVALUATED PER ASCE | | | 7-10. THE ENGINEERS COVER LETTER BY LUIS BARRETO, PE | | | STATES THE SOLAR ARRAY HAS BEEN EVALUATED PER THE 2014 | | | FBC 5TH ED. | | | PLEASE PROVIDE A COVER LETTER STATING THE SOLAR ARRAY | | | HAS BEEN EVALUATED TO THE CURRENT CODE ? 2017 FBC 6TH | | | ED AND THE 2017 FBC RESIDENTIAL 6TH ED. | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2018-03-05 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-02-28 |
Time |
14:03 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-02-28 |
Time |
14:03 |
Sent To |
B |
|
| Notes |
| 2018-03-05 07:28:39 | SEE ORIGINAL COMMENTS JLEAHY |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2018-01-29 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-01-29 |
Time |
12:10 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-01-25 |
Time |
11:49 |
Sent To |
I |
|
| Notes |
| 2018-01-29 12:10:07 | | | | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | SHOW PATHWAYS ON ROOF LAYOUT. | | | | | | NFPA 1 | | | | | | 11.12.2.2.2 ONE- AND TWO-FAMILY DWELLINGS AND | | | TOWNHOUSES | | | PHOTOVOLTAIC SYSTEMS INSTALLED IN ONE- AND TWO-FAMILY | | | DWELLINGS | | | AND TOWNHOUSES SHALL BE IN ACCORDANCE WITH THIS | | | SECTION. | | | | | | 11.12.2.2.2.1.1 HIP ROOF LAYOUTS. PHOTOVOLTAIC MODULES | | | SHALL | | | BE LOCATED IN A MANNER THAT PROVIDES A 3 FT (914 MM) | | | WIDE | | | CLEAR ACCESS PATHWAY FROM THE EAVE TO THE RIDGE OF EACH | | | ROOF | | | SLOPE WHERE THE PHOTOVOLTAIC MODULES ARE LOCATED. THE | | | ACCESS | | | PATHWAY SHALL BE LOCATED AT A STRUCTURALLY STRONG | | | LOCATION OF THE | | | BUILDING, SUCH AS A BEARING WALL. | | | | | | EXCEPTION: THE REQUIREMENT OF 11.12.2.2.2.1.1 SHALL NOT | | | APPLY WHERE | | | ADJOINING ROOF PLANES PROVIDE A 3 FT (914 MM) WIDE | | | CLEAR ACCESS PATHWAY. | | | | | | | | | 11.12.2.2.2.1.3 HIP AND VALLEY LAYOUTS. PHOTOVOLTAIC | | | MODULES | | | SHALL BE LOCATED NO CLOSER THAN 11?2 FT (457 MM) TO A | | | HIP OR | | | VALLEY IF MODULES ARE TO BE PLACED ON BOTH SIDES OF THE | | | HIP OR | | | VALLEY. WHERE MODULES ARE LOCATED ON ONLY ONE SIDE OF A | | | HIP OR | | | VALLEY OF EQUAL LENGTH, THE PHOTOVOLTAIC MODULES SHALL | | | BE ALLOWED | | | TO BE PLACED DIRECTLY ADJACENT TO THE HIP OR VALLEY. | | | | | | 11.12.2.2.2.2 RIDGE SETBACK. PHOTOVOLTAIC MODULES SHALL | | | BE LOCATED | | | NOT LESS THAN 3 FT (914 MM) BELOW THE RIDGE | | | | | 2018-01-18 09:40:15 | NEED TO ADDRESS ZONING COMMENT FOR AN ELECTRICAL | | | REVIEW. JL |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2018-03-05 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2018-03-05 |
Time |
08:54 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2018-02-15 |
Time |
12:50 |
Sent To |
I |
|
| Notes |
| 2018-02-16 12:50:25 | RESUB ROUTED TO HMTRIBOU VIA ZONING INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-01-29 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-01-29 |
Time |
12:13 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-01-12 |
Time |
09:51 |
Sent To |
|
|
| Notes |
| 2018-01-16 09:51:41 | ROUTED TO JLEAHY |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2018-01-29 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2018-01-29 |
Time |
08:38 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2018-01-29 |
Time |
08:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2018-02-26 |
|
|
Cont ID |
|
| Sent By |
HT |
Date |
2018-02-26 |
Time |
13:48 |
Rev Time |
0.00 |
| Received By |
hmtribou |
Date |
2018-02-26 |
Time |
13:48 |
Sent To |
E |
|
| Notes |
| 2018-02-26 13:49:14 | SOLAR COLLECTORS STILL SHOWN IN ROOF VALLEY WHICH MAY | | | ACCESS REQUIREMENTS. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2018-01-23 |
|
|
Cont ID |
|
| Sent By |
HT |
Date |
2018-01-23 |
Time |
17:49 |
Rev Time |
0.00 |
| Received By |
hmtribou |
Date |
2018-01-23 |
Time |
17:49 |
Sent To |
E |
|
| Notes |
| 2018-01-23 17:51:07 | COLLECTOR PANEL MAY NOT EXTEND PAST ROOF PEEK AND MAY | | | ONCE THEY ARE ADJUSTED TO FIT IN THE VALLEYS |
|
|