Plan Review Details - Permit 18010387
Plan Review Stops For Permit 18010387
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-03-16 Cont ID  
Sent By rmcdouga Date 2018-03-16 Time 09:16 Rev Time 0.00
Received By rmcdouga Date 2018-03-16 Time 06:52 Sent To  
Notes
2018-03-16 09:20:22FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-01-23 Cont ID  
Sent By rmcdouga Date 2018-01-23 Time 18:40 Rev Time 0.00
Received By rmcdouga Date 2018-01-23 Time 18:19 Sent To E
Notes
2018-01-23 18:27:43PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE PLANS HAVE SEVERAL REFERENCES TO THE 2014 FBC.
 THE FBC SIXTH EDITION (2017) WENT INTO EFFECT ON
 JANUARY 1, 2018. ALL NEW PERMITS APPLIED FOR ON OR
 AFTER THAT DATE ARE REQUIRED TO COMPLY WITH AND
 REFERENCE THE FBC SIXTH EDITION AND NEC 2014.
  
 2) THE $5,000.00 VALUE FOR THE SPA APPEARS TO BE LOW.
 SUNBMIT A COPY OF THE SIGNED CONTRACT TO VERIFY THE
 VALUE. FBC 109.3 BUILDING PERMIT VALUATION. FOR
 PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS
 SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 3) YOU WILL NEED TO SUBMIT ANOTHER APPLICATION FOR A
 POOL PLUMBING SUB PERMIT SO THAT YOU CAN GET A PERMIT
 NUMBER TO USE WHEN SCHEDULING THE POOL PLUMBING
 INSPECTIONS.
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-03-16 Cont ID  
Sent By rmcdouga Date 2018-03-16 Time 09:48 Rev Time 0.00
Received By rmcdouga Date 2018-03-16 Time 09:48 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-01-24 Cont ID  
Sent By jleahy Date 2018-01-24 Time 09:25 Rev Time 0.00
Received By jleahy Date 2018-01-24 Time 09:25 Sent To I
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-01-19 Cont ID  
Sent By thunt Date 2018-01-19 Time 06:07 Rev Time 0.00
Received By thunt Date 2018-01-19 Time 06:07 Sent To  
Notes
2018-01-19 06:07:51THERE WAS NO GAS REVIEW PERFORMED AS NO GAS IS SHOWN ON
 THE PLANS

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-03-16 Cont ID  
Sent By rmcdouga Date 2018-03-16 Time 09:48 Rev Time 0.00
Received By rmcdouga Date 2018-03-06 Time 10:24 Sent To P
Notes
2018-03-07 10:25:00RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-01-24 Cont ID  
Sent By jleahy Date 2018-01-24 Time 09:31 Rev Time 0.00
Received By jleahy Date 2018-01-11 Time 10:59 Sent To  
Notes
2018-01-12 10:59:21ROUTED TO ZONING

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-03-16 Cont ID  
Sent By rmcdouga Date 2018-03-16 Time 09:48 Rev Time 0.00
Received By lcrespo Date 2018-03-15 Time 14:21 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2018-01-19 Cont ID  
Sent By thunt Date 2018-01-19 Time 06:06 Rev Time 0.00
Received By thunt Date 2018-01-19 Time 06:06 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2018-01-17 Cont ID  
Sent By AW Date 2018-01-17 Time 11:54 Rev Time 0.00
Received By awooten Date 2018-01-16 Time 15:33 Sent To  
Notes
***NONE***