Plan Review Stops For Permit 18010130
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-06-09 Cont ID  
Sent By jwitmer Date 2018-05-24 Time 16:28 Rev Time 0.00
Received By shill Date 2018-05-24 Time 16:28 Sent To  
Notes
2018-06-09 07:18:56THIS RESULT WAS ENTERED AS A MISTAKE.T.LARGE

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-01-22 Cont ID  
Sent By jwitmer Date 2018-01-22 Time 15:43 Rev Time 0.00
Received By jwitmer Date 2018-01-22 Time 14:42 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-05-24 Cont ID  
Sent By jleahy Date 2018-05-24 Time 13:39 Rev Time 0.00
Received By ppetty Date 2018-05-24 Time 13:39 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-01-24 Cont ID  
Sent By jleahy Date 2018-01-18 Time 10:33 Rev Time 0.00
Received By jleahy Date 2018-01-18 Time 10:33 Sent To  
Notes
2018-01-18 10:42:56FLORIDA BUILDING CODE 2014 5TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH ED
 NFPA 70 2011 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 210.8 GROUND-FAULT CIRCUIT-INTERRUPTER PROTECTION
 FOR PERSONNEL GROUND -FAULT CIRCUIT-INTERRUPTER
 PROTECTION FOR PERSONNEL SHALL
 BE PROVIDED AS REQUIRED IN 210.8(A) THROUGH (D). THE
 GROUNDFAULT
 CIRCUIT-INTERRUPTER SHALL BE INSTALLED IN A READILY
 ACCESSIBLE
 LOCATION.
  
 (B) OTHER THAN DWELLING UNITS. ALL 125-VOLT,
 SINGLE-PHASE,
 15- AND 20-AMPERE RECEPTACLES INSTA LLED IN THE
 LOCATIONS SPECIFIED
 IN 210.8(B)(1) THROUGH (8) SHALL HAVE GROUND-FAULT
 CIRCUITINTERRUPTER
 PROTECTION FOR PERSONNEL.
 (1) BATHROOMS
 (2) KITCHENS
 (3) ROOFTOPS
 (4) OUTDOORS
 (5) SINKS ? WHERE RECEPTACLES ARE INSTALLED WITHIN 1.8
 M (6 FT) OF THE OUTSIDE EDGE OF THE SINK
  
 (6) INDOOR WET LOCATIONS
 (7) LOCKER ROOMS WITH ASSOCIATED SHOWERING FACILITIES
 (8) GARAGES, SERVICE BAYS, AND SIMILAR AREAS
  
 PAGES E2.110, E2.112, E2.113, E2.114, E2.117, E2.118,
 E2.119,
  
 GFCI PROTECTION SEEMS TO BE MISSING IN ALL LOCKER ROOMS
 THAT HAVE ASSOCIATED SHOWERS AS STATED IN 210.8(B)(7)
  
 SEVERAL OTHER AREAS WHERE THERE ARE MOP SINKS OR SOME
 OTHER TYPE OF SINK ARE MISSING GFCI PROTECTION IS THOSE
 AREAS.
  
 (E) RECEPTACLES. ALL RECEPTACLES WITHIN 1.83 M (6 FT)
 OF A THERAPEUTIC
 TUB SHALL BE PROTECTED BY A GROUND-FAULT CIRCUIT
 INTERRUPTER.
  
 PROTECTION, GENERAL. RECEPTACLES RATED 125 VOLTS AND 30
 AMPERES OR LESS AND LOCATED WITHIN 3.0 M (10 FT) OF THE
 INSIDE
 WALLS OF A SPA OR HO T TUB SHALL BE PROTECTED BY A
 GROUND-FAULT
 CIRCUIT INTERRUPTER.
  
 PAGE E4.01 DETAIL #1
  
 MAIN SWITCH GEAR ROOM DOES NOT APPEAR TO MEET THE
 REQUIREMENTS OF 110.26 (C)(2) FOR WORKING CLEARANCES.
  
 THIS WILL BE FIELD VERIFIED BY INSPECTIONS.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2018-01-09 Cont ID  
Sent By wjolin Date 2018-01-09 Time 11:14 Rev Time 0.00
Received By wjolin Date 2018-01-09 Time 10:01 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2018-06-27 Cont ID  
Sent By tklarge Date 2018-06-27 Time 10:53 Rev Time 0.00
Received By tklarge Date 2018-06-27 Time 10:52 Sent To I
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-06-09 Cont ID  
Sent By tklarge Date 2018-06-09 Time 07:03 Rev Time 0.00
Received By tklarge Date 2018-06-03 Time 13:17 Sent To  
Notes
2018-06-09 07:03:441) SHT. P5.402.1. - THE GAS RISER SHOWS AN 1 1/2 GAS
 LINE SERVING 1840 MBH. PER TABLE 402.4 (5) OF THE 2014
 FBC-FUEL GAS, A MAXIMUM OF 1710 MBH CAN BE ON AN 1 1/2
 INCH LINE AT 800 FT. CLARIFY. THERE ARE ALSO PIPE
 SECTIONS MISSING ON THE GAS RISER
 2) SHT. P5.403 - THE BTU LOADS NOTED IN THE CLOUDED
 AREA ON THE PLAN ARE SET OVER OTHER BTU LOADS MAKING
 THE BTU LOAD OF THE APPLIANCES ILLEGIBLE. THIS NEEDS TO
 BE CLEANED UP SO THE PLAN CLEARLY REFLECTS THE BTU
 LOADS OF THE APPLIANCES.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-06-27 Cont ID  
Sent By lmarchan Date 2018-06-27 Time 11:26 Rev Time 0.00
Received By lmarchan Date 2018-06-27 Time 08:30 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-06-09 Cont ID  
Sent By shill Date 2018-06-09 Time 16:28 Rev Time 0.00
Received By shill Date 2018-05-17 Time 10:17 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-01-30 Cont ID  
Sent By tklarge Date 2018-01-30 Time 09:33 Rev Time 0.00
Received By tklarge Date 2018-01-05 Time 15:42 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2018-06-05 Cont ID  
Sent By ccole Date 2018-06-05 Time 10:55 Rev Time 0.00
Received By ccole Date 2018-06-05 Time 08:03 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2018-01-22 Cont ID  
Sent By ccole Date 2018-01-22 Time 12:36 Rev Time 0.00
Received By ccole Date 2018-01-18 Time 10:51 Sent To  
Notes
2018-01-22 12:39:531ST REVIEW FBC-2014 MECHANICAL
 PERMIT #18010130
 1/18/18
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET M2.111: FIRE DAMPERS ARE NOT PERMITTED ON THE
 HAZARDOUS EXHAUST DUCTS IN THE CHEMICAL AND PAINT
 STORAGE ROOMS- SECTION 510.5.7.
  
 2) M2.111: PLEASE LABEL ALL ROOMS ON THE PLAN.
  
 3) M2.117: PLEASE CLARIFY THE FUNCTION OF THE TWO NEW
 CR-A RETURNS IN THE LAUNDRY THAT ARE CONNECTED TO THE
 34X16 TRANSFER DUCT, AND PROVIDE EXHAUST AND AIR
 BALANCE CALCULATIONS FOR THE ROOM.
  
 4) M2.118: NOTE #19 APPEARS TO INDICATE TRANSFER DUCTS
 PROVIDING MAKEUP AIR FROM THE CORRIDOR FOR THE EXHAUST
 SYSTEMS. PLEASE SEE SECTION 601.2 EXCEPTION 1 WHICH
 PERMITS THE TRANSFERS ONLY IF OUTDOOR AIR IS BEING
 SUPPLIED TO THE ROOMS AT A RATE GREATER THAN THAT OF
 THE MAKEUP AIR. PLEASE NOTE THIS REVISED PLAN WAS ALSO
 SUBMITTED UNDER PERMIT #17040185, AND THE SAME COMMENT
 WAS WRITTEN, HOWEVER PER PHONE CONVERSATION WITH EOR
 MICHAEL CALAME, THE TRANSFERS WILL BE ELIMINATED AND
 REPLACED WITH MAKEUP AIR DUCTS DRAWING AIR DIRECTLY
 FROM THE ROOF ABOVE. THIS DECISION WAS BASED ON
 INADEQUATE OUTSIDE AIR FROM THE CORRIDOR AND ALSO TO
 PREVENT POSSIBLE AIR FROM BEING BACK DRAFTED FROM THE
 ROOMS INTO THE CORRIDORS.
  
 5) M2.118: PLEASE CLARIFY THE PURPOSE OF THE NEW 30X24
 TRANSFER DUCT AT THE WEIGHT ROOM/OFFICE WALL.
  
 6) M2.128: PLEASE SHOW THE DISCHARGE LOCATIONS OF EF
 A-2-4.
  
 7) M4.02: IT APPEARS THAT VAV-2-7 HAS EITHER BEEN
 DELETED OR NOT LABELED ON THE PLAN.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 3 Status P Date 2018-06-27 Cont ID  
Sent By tklarge Date 2018-06-27 Time 10:52 Rev Time 0.00
Received By tklarge Date 2018-06-27 Time 08:46 Sent To I
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2018-06-09 Cont ID  
Sent By tklarge Date 2018-06-09 Time 07:01 Rev Time 0.00
Received By tklarge Date 2018-06-03 Time 13:16 Sent To  
Notes
2018-06-07 04:14:191) SHTS.A2.111 & A2.119 - SUBMIT DETAILS FOR THE
 BOLLARDS ADDED AT THE GAS NETER. SHOW TYPE OF MATERIAL
 & DIAMETER, HEIGHT ABOVE GROUND AND EMBEDMENT DEPTH
 INTO GROUND. WPB AMEND. TO FBC SEC. 107.2.1.
 2) SHT.P2.119.4 - DETAIL #1 - CLUBHOUSE LEVEL - SECTOR
 3A - PROVIDE THE MATCH LINE FOR THE BOTTOM OF THE
 DETAIL ON THE LEFT SIDE WHERE THE 1 INCH CW LINE IS
 SHOWN.WPB AMEND. TO FBC SEC. 107.2.1.
 3) SHTS. P2.121 & P2.122 - IDENTIFY THE PIPE LINES IN
 THE PIPING UTILITY TRAY IN THE CEILING .WPB AMEND. TO
 FBC SEC. 107.2.1.
 4) SHT. P2.122 - THERE ARE A FEW SECTIONS OF PIPE AT
 THE TOP OF THE DRAWING BY THE SEATS THAT GO NOWHERE.
 AREA DRAINS ARE SHOWN WITH NO PIPING TO THEM. IT
 APPEARS AS THOUGH PORTIONS OF THE PLUMBING SYSTEM WERE
 NOT CAPTURED WHEN THE PLANS WERE UPLOADED. CLARIFY.
 5) SHT. P2.128 - THERE IS A DASHED LINE THAT RUNS
 THROUGH THE EXERCISE AREA THAT APPEARS TO BE A GAS LINE
 BUT IT IS NOT IDENTIFIED. IDENTIFY THE LINE AS TO ITS
 USE AND SHOW THE PIPE SIZE. ALSO, REFER TO NUMBERED
 NOTE #5.IT APPEARS THE PIPING TO AND FROM THIS
 REGULATOR HAS NOT BEEN CAPTURED WHEN THE DOCUMENT WAS
 UPLOADED.
 6) PLEASE IDENTIFY THE AREAS AND ROOMS ON THE PLANS
 WITH NAMES AND NUMBERS. THIS WILL HELP EXPEDITE THE
 REVIEW AND ASSIST IN IDENTIFYING THE CHANGES FROM THE
 ORIGINAL PLANS. WPB AMEND. TO FBC SEC. 107.2.1.
 7) SHT. P4.001 - DETAIL #3 - WATER RISER - IT APPEARS
 THERE ARE SECTIONS OF PIPE MISSING. THERE IS A SECTION
 OF PIPE THAT APPEARS TO BE SANITARY THAT GOES
 NOWHERE.THERE IS NO CLOUD, NO DETAIL NUMBER, NO
 IDENTIFICATION, CLARIFY.
 8) SHT. P.4.001 - DETAIL #3 - THERE APPEARS TO BE
 SECTIONS OF PIPING ON THE WATER RISER MISSING . SUBMIT
 COMPLETE WATER AND SANITARY RISERS FOR REVIEW. IT SEEMS
 AS THOUGH ALL THE IMAGES ARE NOT BEING CAPTURED WHEN
 THE PLANS ARE BEING UPLOADED. WPB AMEND. TO FBC SEC.
 107.2.1.
 9) SHT. P4.001.1 - DETAIL #1 - ASTROS DUGOUT ENLARGED
 PLAN - PROVIDE MATCH LINES FOR THIS DETAIL WPB AMEND.
 TO FBC SEC. 107.2.1.
 10) SHT. P4.003 - SIZE ALL DROP PIPES ENTERING THE FUEL
 TANKS.
 11) SHT. P4.100 - PIPE SIZES ARE MISSING ON THE AREAS
 OF THE WATER AND SANITARY RISER DIAGRAMS.
 12) SHT. P4.101 - PIPE SIZES ARE MISSING ON AREAS OF
 THE SANITARY AND WATER RISERS.
 13) P4.102 - PIPE SIZES ARE MISSING FROM SEVERAL AREAS
 ON THE SANITARY AND WATER RISER DIAGRAMS AND THERE ARE
 SECTIONS OF PIPE THAT ARE MISSING. IT APPEARS AS THOUGH
 NOT EVERYTING IS BEING CAPTURED WHEN THE DRAWINGS ARE
 BING UPLOADED.
 14) P4.103 - PIPE SIZES ARE MISSING FROM THE SANITARY
 AND WATER RISERS. THERE ARE SECTIONS OF PIPE SHOWN ON
 THE SANITARY RISERS THAT GO NOWHERE.
 15) SHT. P4.112 - PIPE SIZES ARE MISSING ON THE WATER
 AND SANITARY RISERS.
 16) SHT. P4.114 - PIPE SIZES ARE MISSING ON THE
 SANITARY AND WATER RISER DIAGRAMS. SIZE THE OVERHEAD
 PIPE LINES IN DETAIL #6.
 17) SHT. P4.116 - PIPE SIZES ARE MISSING ON THE
 SANITARY AND WATER RISERS.
 18) SHT. P4.118 - PIPE SIZES ARE MISSING ON THE
 SANITARY AND WATER RISERS. SUBMIT AN EXPANDED WATER
 RISER FOR DETAIL #3. THE PIPE LINES ARE TOO CLOSE
 TOGETHER TO DO A REVIEW OR TO IDENTIFY THE PIPE.
 19) SHT. P4.119 - SIZE ALL SECTIONS OF THE SANITARY AND
 WATER RISERS.
 20) SHTS. P4.121 & 122 - SIZE ALL SECTIONS OF THE
 SANITARY AND WATER RISER DIGRAMS.SECTIONS OF PIPE ARE
 SHOWN AS GOING NOWHERE.
 21) SHTS. P4.201, P4.202, P4.203 - SIZE ALL SECTIONS OF
 THE WATER AND SANITARY RISERS.
 22) SHTS. P4.205 & P4.206 - SIZE ALL SECTIONS OF THE
 WATER AND SANITARY RISERS.
 23) SHT.P4.210 - SIZE ALL SECTIONS OF THE WATER AND
 SANITARY RISERS. THERE ARE PIPE SECTIONS MISSING
 24) SHTS. P4.300, P4.301, P4.303, P4.304, P4.305,
 P4.306 - THERE ARE PIPE SIZES MISSING ON THE SANITARY
 AND WATER RISERS, THERE ARE SECTIONS OF PIPE MISSING,
 NO CONTINUATION REFERENCE SHEETS ON THE PIPE RISERS.
 25) SHTS. P4.301 THRU P4.307 ARE NOT LISTED INTHE INDEX
 OF DRAWINGS. SUBMIT A NARRATIVE FOR THESE SHEETS
 EXPLAINING THE CHANGES THAT WERE MADE.
 25) SHT.P5.01 - SIZE ALL SECTIONS OF THE WATER AND
 SANITARY RISERS. THERE ARE PIPE SECTIONS MISSING AND
 PLUMBING FIXTURES NOT LABELED.
 26) SHT. P5.101 - GENERAL NOTE #1 STATES THAT WATER
 DISTRIBUTION PIPE SHALL BE STAINLESS STEEL. THIS IS NOT
 WHAT WAS INSTALLED.
 27) SHT. P5.101.1, P5.101.2, P5101.3, P5.101.4, - SIZE
 ALL SECTIONS OF THE WATER RISERS, AND IDENTIFY ALL
 FIXTURES ON THE RISERS. THERE ARE ALSO SECTIONS OF PIPE
 MISSING ON THE RISERS.
 28) SHTS. P5.102 ,1, P5.102.2, P5.103 - SIZE ALL
 SECTIONS OF THE WATER RISERS. THERE ARE ALSO PIPE
 SECTION MISSING AND FIXTURES NOT LABELED .
 29) SHT. P5.402.1. - THE GAS RISER SHOWS AN 1 1/2 GAS
 LINE SERVING 1840 MBH. PER TABLE 402.4 (5) OF THE 2014
 FBC-FUEL GAS, A MAXIMUM OF 1710 MBH CAN BE ON AN 1 1/2
 INCH LINE AT 800 FT. CLARIFY. THERE ARE ALSO PIPE
 SECTIONS MISSING ON THE GAS RISER
 32) SHT. P5.403 - THE BTU LOADS NOTED IN THE CLOUDED
 AREA ON THE PLAN ARE SET OVER OTHER BTU LOADS MAKING
 THE BTU LOAD OF THE APPLIANCES ILLEGIBLE. THIS NEEDS TO
 BE CLEANED UP SO THE PLAN CLEARLY REFLECTS THE BTU
 LOADS OF THE APPLIANCES.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2018-01-30 Cont ID  
Sent By tklarge Date 2018-01-30 Time 09:29 Rev Time 0.00
Received By tklarge Date 2018-01-29 Time 05:16 Sent To  
Notes
2018-01-30 09:31:40SIGNATURE ON PLUMBING SHEETS OK.TKL.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2018-05-24 Cont ID  
Sent By shill Date 2018-05-24 Time 10:53 Rev Time 0.00
Received By shill Date 2018-05-24 Time 10:53 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2018-01-30 Cont ID  
Sent By tklarge Date 2018-01-30 Time 09:32 Rev Time 0.00
Received By tklarge Date 2018-01-30 Time 09:32 Sent To  
Notes
2018-01-30 09:32:22SIGNATURES ON PLUMBING SHEETS REVIEWED AND ARE OK. TKL.
2018-01-22 15:12:03ARCHITECTURAL SIGNATURES, REVIEWED. 01/22/2018 JW