| 2017-12-22 14:59:27 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 2ND REVIEW: FBC FIFTH EDITION (2014) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) THE GAF ROOFING PRODUCT APPROVALS THAT WERE |
| | SUBMITTED REQUIRE SIGNED AND SEALED RAS 117 |
| | CALCULATIONS FOR ENHANCED FASTENING OF THE BASE SHEET |
| | IN THE PERIMETER AND CORNER AREAS OF THE ROOF. |
| | |
| | 2) FBC EXISTING BUILDING 708.1.1 - NOT MORE THAN 25 |
| | PERCENT OF THE TOTAL ROOF AREA OR ROOF SECTION OF ANY |
| | EXISTING BUILDING OR STRUCTURE SHALL BE REPAIRED, |
| | REPLACED OR RECOVERED IN ANY 12-MONTH PERIOD UNLESS THE |
| | ENTIRE ROOFING SYSTEM OR ROOF SECTION CONFORMS TO |
| | REQUIREMENTS OF THIS CODE. THE TOTAL AREA OF THE ROOF |
| | IS 1900 SQFT AND THE APPLICATION IS TO REPAIR 900 SQFT. |
| | THIS IS MORE THAN 25 PERCENT OF THE ROOF AREA, |
| | THEREFORE THE ENTIRE ROOF IS REQUIRED TO BE REPLACED. |
| | |
| | NOTE: THE OWNER'S AGENT EXPLAINED THAT THE OWNER WAS |
| | GOING TO DEMOLISH THE STRUCTURE IN ABOUT A YEAR AND DID |
| | NOT WANT TO PUT A LOT OF MONEY INTO IT BY INSTALLING A |
| | NEW ROOF. HE SAID THAT THE PEOPLE IN THE HIGH RISE |
| | ACROSS THE STREET WERE COMPLAINING ABOUT THE UNSIGHTLY |
| | ROOF. DOUG HARVEY AND I DISCUSSED SOME OPTIONS WITH THE |
| | CUSTOMER. DOUG HAD SOME KNOWLEDGE OF THE BUILDING AND |
| | APPARENTLY PART OF THE ROOF HAS FALLEN IN. HE WAS GIVEN |
| | THE FOLLOWING OPTIONS: |
| | 1) OBTAIN A DEMOLISION PERMIT AND DEMOLISH THE BUILDING |
| | NOW. |
| | 2) HAVE A STRUCTURAL ENGINEER EVALUATE THE STRUCTURE |
| | AND PROVIDE AN EVALUATION REPORT AND A REPAIR PLAN. |
| | INCLUDING A COMPLETE RE-ROOF OF THE BUILDING. |
| | 3) HAVE A STRUCTURAL ENGINEER EVALUATE THE STRUCTURE |
| | AND PROVIDE AN EVALUATION REPORT AND A REPAIR PLAN. |
| | INCLUDING A TEMPORARY REPAIR OF THE AFFECTED AREA AND A |
| | DATE THAT THE STRUCTURE WILL BE DEMOLISHED. THE CITY |
| | MAY REQUIRE THAT A BOND BE POSTED TO ENSURE THAT THE |
| | STRUCTURE IS DEMOLISHED BY THE AGREED UPON DATE. |
| | |
| | |