| 2017-12-18 10:06:04 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| | |
| | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED |
| | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE |
| | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE |
| | INSPECTION. |
| | |
| | |
| | 1) TEST TO ENSURE THE FOLLOWING IS COMPLIANT INCLUDING, |
| | BUT NOT LIMITED TO, DBA AT THE PILLOW HEIGHT. |
| | |
| | |
| | 14.4.1.2* REACCEPTANCE TESTING. |
| | 14.4.1.2.1 REACCEPTANCE TESTING SHALL BE PERFORMED AS |
| | REQUIRED IN 14.4.1.2.1.1 THROUGH 14.4.1.2.1.4. |
| | 14.4.1.2.1.1 WHEN AN INITIATING DEVICE, NOTIFICATION |
| | APPLIANCE, OR CONTROL RELAY IS ADDED, IT SHALL BE |
| | FUNCTIONALLY TESTED. |
| | 14.4.1.2.1.2 WHEN AN INITIATING DEVICE, NOTIFICATION |
| | APPLIANCE, OR CONTROL RELAY IS DELETED, ANOTHER DEVICE, |
| | APPLIANCE, OR CONTROL RELAY ON THE CIRCUIT SHALL BE |
| | OPERATED. |
| | 14.4.1.2.1.3 WHEN MODIFICATIONS OR REPAIRS TO CONTROL |
| | EQUIPMENT HARDWARE ARE MADE, THE CONTROL EQUIPMENT |
| | SHALL BE TESTED IN ACCORDANCE WITH TABLE 14.4.2.2, |
| | ITEMS 1(A) AND 1(D). |
| | 14.4.1.2.1.4 WHEN CHANGES ARE MADE TO SITE-SPECIFIC |
| | SOFTWARE, THE FOLLOWING SHALL APPLY: |
| | (1) ALL FUNCTIONS KNOWN TO BE AFFECTED BY THE CHANGE, |
| | OR IDENTIFIED BY A MEANS THAT INDICATES CHANGES, SHALL |
| | BE 100 PERCENT TESTED. |
| | (2) IN ADDITION, 10 PERCENT OF INITIATING DEVICES THAT |
| | ARE NOTDIRECTLY AFFECTED BY THE CHANGE, UP TO A MAXIMUM |
| | OF 50 DEVICES, ALSO SHALL BE TESTED AND CORRECT SYSTEM |
| | OPERATION SHALL BE VERIFIED. |
| | (3) AREVISED RECORD OF COMPLETION IN ACCORDANCE WITH |
| | 10.18.2.1 SHALL BE PREPARED TO REFLECT THESE CHANGES. |
| | 14.4.1.2.2 CHANGES TO ALL CONTROL UNITS CONNECTED OR |
| | CONTROLLED BY THE SYSTEM EXECUTIVE SOFTWARE SHALL |
| | REQUIRE A 10 PERCENT FUNCTIONAL TEST OF THE SYSTEM, |
| | INCLUDING A TEST OF AT LEAST ONE DEVICE ON EACH INPUT |
| | AND OUTPUT CIRCUIT TO VERIFY CRITICAL SYSTEM FUNCTIONS |
| | SUCH AS NOTIFICATION APPLIANCES, CONTROL FUNCTIONS, AND |
| | OFF-PREMISES REPORTING. |
| | 14.4.2* TEST METHODS. |
| | 14.4.2.1* AT THE REQUEST OF THE AUTHORITY HAVING |
| | JURISDICTION, THE CENTRAL STATION FACILITY INSTALLATION |
| | SHALL BE INSPECTED FOR COMPLETE INFORMATION REGARDING |
| | THE CENTRAL STATION SYSTEM, INCLUDING SPECIFICATIONS, |
| | WIRING DIAGRAMS, AND FLOOR PLANS THAT HAVE BEEN |
| | SUBMITTED FOR APPROVAL PRIOR TO INSTALLATION OF |
| | EQUIPMENT AND WIRING. |
| | 14.4.2.2* SYSTEMS AND ASSOCIATED EQUIPMENT SHALL BE |
| | TESTED ACCORDING TO TABLE 14.4.2.2. |
| | |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |