Review Stop G GAS REVIEW
Rev No 3 Status P Date 2018-01-18 Cont ID  
Sent By gjohnson Date 2018-01-18 Time 13:43 Rev Time 0.00
Received By gjohnson Date 2018-01-18 Time 13:43 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2018-01-04 Cont ID  
Sent By gjohnson Date 2018-01-04 Time 07:35 Rev Time 0.00
Received By gjohnson Date 2018-01-04 Time 07:35 Sent To  
Notes
2018-01-04 08:05:412ND REVIEW: FBC 2014 5TH EDITION
  
 PLUMBING COMMENTS: PREVIOUS COMMENTS NOT COMPLIED WITH.
 I SUGGEST A MEETING BE SET UP TO EXPEDITE APPROVAL OF
 THIS REVISION MY CONTACT INFO IS BELOW.
  
 1. THE APPROVED SET OF DRAWINGS WAS SIGNED AND SEALED
 BY DESIGN PROFESSIONAL ANY REVISIONS SHALL BE SIGNED
 AND SEALED BY THE SAME DESIGN PROFESSIONAL. PER WPB
 AMEND TO FBC 107.2 AND FS 61G15-23.003
  
 2. PLEASE PROVIDE REVISED FLOOR PLAN SHT. P.1. PER WPB
 AMEND TO FBC 107.2.1
  
 NEW COMMENT:
  
 1. PER FBC FG TABLE 402.4(2) YOUR DEVELOPED LENGTH
 WOULD BE ROUNDED UP TO 30' AND MAX BTU LOAD FOR 1" PIPE
 IS 374,000 WHICH MAKES YOUR FIRST SECTION OF PIPE
 UNDERSIZED. IT SHALL BE 11/4" TO ALLOW FOR A BTU LOAD
 OVER 374,000.
  
 2. ON THE ORIGINAL SET OF PLANS IT SHOWS THE TANKLESS
 HEATER WITH A MAX BTU LOAD OF 199,000 THE REVISED
 DRAWING SHOWS IT AT 190,000. PLEASE PROVIDE THE
 MANUFACTURE SPECIFICATIONS OF ALL THE GAS APPLIANCES TO
 MORE ACCURATELY CALCULATE THE BTU LOAD OF THE SYSTEM.
 PER WPB AMEND TO FBC 107.2.1
  
 3. PROVIDE A RISER DIAGRAM THAT SHOWS THE LENGTH OF OF
 EACH CUT SECTION OF PIPE TO MORE ACCURATELY CALCULATE
 THE BTU LOAD OF THE SYSTEM. PER WPB AMEND TO FBC
 107.2.1
  
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2017-12-16 Cont ID  
Sent By gjohnson Date 2017-12-16 Time 11:19 Rev Time 0.00
Received By gjohnson Date 2017-12-16 Time 11:19 Sent To  
Notes
2017-12-16 11:47:031ST REVIEW: FBC 2014 5TH EDITION
  
 PLUMBING COMMENTS:
  
 1. THE APPROVED SET OF DRAWINGS WAS SIGNED AND SEALED
 BY DESIGN PROFESSIONAL ANY REVISIONS SHALL BE SIGNED
 AND SEALED BY THE SAME DESIGN PROFESSIONAL. PER WPB
 AMEND TO FBC 107.2 AND FS 61G15-23.003
  
 2. PLEASE PROVIDE REVISED FLOOR PLAN SHT. P.1. PER WPB
 AMEND TO FBC 107.2.1
  
 3. THE TOTAL DEVELOPED LENGTH IS STATED AS 18' YET THE
 LAST SECTION OF PIPE TO THE DRYER IS LABELED AS 18'
 PLEASE LABEL ALL SECTIONS OF PIPE INCLUDING THE FIRST
 SECTION FROM THE METER AND THEY SHALL MATCH THE TOTAL
 DEVELOPED LENGTH. PER WPB AMEND TO FBC 107.2.1
  
 4. INDICATE THE DELIVERY PRESSURE (PSI) AND TYPE OF
 GAS, (LP OR NATURAL).PER FBC-2014 FUEL GAS SEC. 402.2.
 IF NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
  
 5. PLEASE PROVIDE TABLE THAT WAS USED FOR SIZING
 SYSTEM. PER FBC FG 402.4
  
 6. SHOW SHUT OFF VALVE FOR COOK TOP ON THE BRANCH
 CONNECTING APPLIANCE. PER WPB AMEND TO FBC 107.2.1
  
 7. SHOW THE REQUIRED DIRT LEG ON THE SYSTEM. PER FBC FG
 408.4
  
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-01-18 Cont ID  
Sent By gjohnson Date 2018-01-18 Time 13:43 Rev Time 0.00
Received By gjohnson Date 2018-01-10 Time 11:38 Sent To  
Notes
2018-01-11 11:39:09RESUB ROUTED TO GJOHNSON

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-01-04 Cont ID  
Sent By gjohnson Date 2018-01-04 Time 08:05 Rev Time 0.00
Received By gjohnson Date 2017-12-27 Time 11:49 Sent To  
Notes
2017-12-28 11:50:02GJOHNSON'S DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-12-16 Cont ID  
Sent By gjohnson Date 2017-12-16 Time 11:47 Rev Time 0.00
Received By gjohnson Date 2017-12-12 Time 13:45 Sent To  
Notes
2017-12-13 13:46:09REVISION ROUTED TO GJOHNSON