Plan Review Details - Permit 17120255
Plan Review Stops For Permit 17120255
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-01-08 Cont ID  
Sent By rmcdouga Date 2018-01-08 Time 11:51 Rev Time 0.00
Received By rmcdouga Date 2018-01-08 Time 10:06 Sent To E
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2017-12-19 Cont ID  
Sent By rmcdouga Date 2017-12-19 Time 09:38 Rev Time 0.00
Received By rmcdouga Date 2017-12-19 Time 09:38 Sent To G
Notes
2017-12-19 09:45:48PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) PROVIDE ANCHORING DETAILS TO INDICATE THE ATTACHMENT
 OF THE GENERATOR TO THE SLAB TO RESIST 170 MPH EXPOSURE
 D WINDLOADS. SPECIFY THE ANCHOR TYPE, SIZE, EMBED DEPTH
 AND LOCATIONS ON THE DRAWINGS. FBC-R301.2.1
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-01-08 Cont ID  
Sent By jleahy Date 2018-01-08 Time 17:01 Rev Time 0.00
Received By jleahy Date 2018-01-08 Time 17:01 Sent To I
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-12-18 Cont ID  
Sent By jleahy Date 2017-12-18 Time 09:12 Rev Time 0.00
Received By jleahy Date 2017-12-18 Time 09:12 Sent To G
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2018-01-08 Cont ID  
Sent By tklarge Date 2018-01-08 Time 06:00 Rev Time 0.00
Received By tklarge Date 2018-01-08 Time 05:39 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2017-12-27 Cont ID  
Sent By tklarge Date 2017-12-27 Time 11:05 Rev Time 0.00
Received By tklarge Date 2017-12-27 Time 09:35 Sent To  
Notes
2017-12-27 11:05:051) SUBMIT TWO COPIES OF MANUFACTURER'S SPECIFICATIONS
 FOR THE GAS REGULATOR TO BE INSTALLED. REGULATORS
 INSTALLED ON THE EXTERIOR SHALL BE APPROVED FOR OUTDOOR
 USE. 2014 FGC SEC.410.1.
 2) THE GENERATOR SHALL MEET THE REQUIREMENTS OF UL 2200
 PER THE FGC SEC. 616.1. THIS IS SHOWN AS AN OPTION IN
 THE GENERATOR SPECIFICATIONS. CLARIFY.
 3) SHT.P0.1- NOTE #7 - THE TRACER WIRE SHALL BE IN
 CONTACT WITH THE PE PIPE. FGC SEC.404.17.3.
 4) SHOW THE DISTANCE FROM THE OUTLET OF THE METER TO
 THE MOST REMOTE LINE PRESSURE REGULATOR ON THE 2 PSI
 SYSTEM.2014 FGC SEC.402.4.3.
 5) THE BTU LOAD OF THE GENERATOR AT 60HZ IS 757,000
 BTU'S AT 100% LOAD ACCORDING TO THE MANUFACTURER'S
 SPECIFICATIONS BUT THE GAS DRAWING SHOWS THE BTU LOAD
 AS 699,000 BTU'S. CLARIFY.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-01-08 Cont ID  
Sent By rmcdouga Date 2018-01-08 Time 17:01 Rev Time 0.00
Received By jleahy Date 2018-01-04 Time 13:39 Sent To  
Notes
2018-01-05 13:41:03RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-12-27 Cont ID  
Sent By tklarge Date 2017-12-27 Time 11:05 Rev Time 0.00
Received By tklarge Date 2017-12-07 Time 10:00 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2017-12-14 Cont ID  
Sent By tklarge Date 2017-12-27 Time 11:05 Rev Time 0.00
Received By jroach Date 2017-12-11 Time 14:23 Sent To E
Notes
***NONE***