|
 |
 |
 |
 |
 |
Plan Review Details - Permit 17120001
| Plan Review Stops For Permit 17120001 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2018-07-18 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2018-07-17 |
Time |
19:01 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2018-07-17 |
Time |
12:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2018-07-27 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2018-07-27 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2018-07-18 |
Time |
10:11 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2018-07-27 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2018-07-27 |
Time |
08:46 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2018-07-03 |
Time |
10:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2018-05-29 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2018-05-24 |
Time |
15:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2017-12-05 |
Time |
|
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2017-12-01 |
Time |
10:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2018-07-11 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2018-07-11 |
Time |
10:59 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2018-07-10 |
Time |
11:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2018-05-29 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2018-05-29 |
Time |
12:56 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2018-05-29 |
Time |
12:10 |
Sent To |
|
|
| Notes |
| 2018-05-29 13:02:06 | 2ND REVIEW FBC-2014 MECHANICAL | | | MASTER #15111020 THE BRISTOL | | | REVISION PERMIT #17120001 | | | 5/29/18 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | PLEASE SEE COMMENTS #1 AND #2 FROM THE 1ST REVIEW | | | PRINTED BELOW. THE REQUESTED DRAWINGS WERE NOT UPLOADED | | | FOR REVIEW IN DIGITAL PLAN SHEET FORM, BUT WERE SCANNED | | | AND ATTACHED AS DOCUMENTS. PLEASE PROVIDE THE REQUIRED | | | ELECTRONICALLY SIGNED AND SEALED PLAN SHEETS. | | | | | | 1) ELECTRONIC SIGNATURES AND SEALS ARE MISSING FROM ALL | | | OF THE UPLOADED REVISED PLAN SHEETS. PLEASE NOTE THAT | | | MECHANICAL SHEETS M2.0P1, M2.0P2, M2.01, M2.02, AND | | | M2.03 STILL BEAR THE TITLE BLOCK OF EDWARDS AND ZUCK | | | WHO HAVE BEEN REPLACED BY STANTEC AS THE MECHANICAL | | | ENGINEERS OF RECORD. THESE SHEETS DO NOT APPEAR TO BE | | | UPDATED BY THE DATES LISTED, HOWEVER ALL OTHER | | | | | | MECHANICAL SHEETS BY STANTEC HAVE REVISION DATES OF | | | 10/27/17. THE ARCHITECTURAL SHEETS A7.01, A7.02, ANSD | | | A7.03 ALSO NEED TO BE UPDATED. | | | | | | 2) SHEET A7.01: ACESS PANEL LOCATIONS NOT SHOWN IN RM | | | 142- HP1L-8, RM 116- HP-1L-2, AND RM 117-HP-1L-3. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2017-12-05 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-12-05 |
Time |
12:28 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-12-05 |
Time |
12:28 |
Sent To |
|
|
| Notes |
| 2017-12-05 13:10:53 | 1ST REVIEW FBC-2014 MECHANICAL | | | MASTER #15111020 THE BRISTOL | | | REVISION PERMIT #17120001 | | | 12/5/17 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) ELECTRONIC SIGNATURES AND SEALS ARE MISSING FROM ALL | | | OF THE UPLOADED REVISED PLAN SHEETS. PLEASE NOTE THAT | | | MECHANICAL SHEETS M2.0P1, M2.0P2, M2.01, M2.02, AND | | | M2.03 STILL BEAR THE TITLE BLOCK OF EDWARDS AND ZUCK | | | WHO HAVE BEEN REPLACED BY STANTEC AS THE MECHANICAL | | | ENGINEERS OF RECORD. THESE SHEETS DO NOT APPEAR TO BE | | | UPDATED BY THE DATES LISTED, HOWEVER ALL OTHER | | | | | | MECHANICAL SHEETS BY STANTEC HAVE REVISION DATES OF | | | 10/27/17. THE ARCHITECTURAL SHEETS A7.01, A7.02, ANSD | | | A7.03 ALSO NEED TO BE UPDATED. | | | | | | 2) SHEET A7.01: ACESS PANEL LOCATIONS NOT SHOWN IN RM | | | 142- HP1L-8, RM 116- HP-1L-2, AND RM 117-HP-1L-3. | | | | | | 3) PLEASE VERIFY THAT THE ACCESS PANELS ARE PLENUM | | | RATED IN ACCORDANCE WITH SECTION 602.2.1, AND THAT THEY | | | WILL BE SIZED LARGE ENOUGH TO REMOVE AND REPLACE ANY | | | HP'S OR OTHER MECHANICAL EQUIPMENT LOCATED ABOVE | | | CEILINGS- SECTION 306.1 | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2018-07-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-07-21 |
Time |
10:01 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-07-21 |
Time |
10:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2018-05-29 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2018-05-29 |
Time |
13:03 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2018-05-29 |
Time |
13:03 |
Sent To |
|
|
| Notes |
| 2018-05-29 13:04:27 | 2ND REVIEW FBC-2014 MECHANICAL | | | MASTER #15111020 THE BRISTOL | | | REVISION PERMIT #17120001 | | | 5/29/18 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | PLEASE SEE COMMENTS #1 AND #2 FROM THE 1ST MECHANICAL | | | REVIEW PRINTED BELOW. THE REQUESTED DRAWINGS WERE NOT | | | UPLOADED FOR REVIEW IN DIGITAL PLAN SHEET FORM, BUT | | | WERE SCANNED AND ATTACHED AS DOCUMENTS. PLEASE PROVIDE | | | THE REQUIRED ELECTRONICALLY SIGNED AND SEALED PLAN | | | SHEETS. | | | | | | 1) ELECTRONIC SIGNATURES AND SEALS ARE MISSING FROM ALL | | | OF THE UPLOADED REVISED PLAN SHEETS. PLEASE NOTE THAT | | | MECHANICAL SHEETS M2.0P1, M2.0P2, M2.01, M2.02, AND | | | M2.03 STILL BEAR THE TITLE BLOCK OF EDWARDS AND ZUCK | | | WHO HAVE BEEN REPLACED BY STANTEC AS THE MECHANICAL | | | ENGINEERS OF RECORD. THESE SHEETS DO NOT APPEAR TO BE | | | UPDATED BY THE DATES LISTED, HOWEVER ALL OTHER | | | | | | MECHANICAL SHEETS BY STANTEC HAVE REVISION DATES OF | | | 10/27/17. THE ARCHITECTURAL SHEETS A7.01, A7.02, ANSD | | | A7.03 ALSO NEED TO BE UPDATED. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |