| 2017-12-06 03:09:31 | 1) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE LIFT |
| | STATION. WPB AMEND. TO FBC SEC. 107.2.1. A SEPARATE |
| | PERMIT WILL BE REQUIRED FOR ANY ELECTRICAL WORK. |
| | 2) THE APPLICATION NOTES WORK TO BE DONE ON A 4 INCH |
| | SEWER LINE BUT THERE IS NOTHING ON THE SUBMITTED PLANS |
| | FOR THE REPLACEMENT OF A SEWER LINE. A DRAINAGE OR SOIL |
| | STACK IS NOT A SEWER LINE.SUBMIT A DRAWING OF THE |
| | BUILDING FOOTPRINT SHOWING THE LOCATION AND LENGTH OF |
| | THE BUILDING SEWER TO BE REPLACED IF APPLICABLE. WPB |
| | AMEND. TO FBC SEC. 107.2.1. NOTE: THE BUILDING SEWER |
| | BEGINS 30 INCHES OUTSIDE THE EXTERIOR WALL OF THE |
| | BUILDING. |
| | 3) SUBMIT A FLOOR PLAN SHOWING THE LOCATION OF THE WORK |
| | TO BE DONE. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 4) A CHECK VALVE AND FULL OPEN VALVE LOCATED ON THE |
| | DISCHARGE SIDE OF THE CHECK VALVE SHALL INSTALLED IN |
| | THE PUMP OR EJECTOR DISCHARGE PIPING BETWEEN THE PUMP |
| | OR EJECTOR AND THE GRAVITY DRAINAGE SYSTEM. VALVES |
| | SHALL BE ACCESSIBLE.FBC-PLUMBING SEC.712.2. |
| | 5) THE DRAWING SHOWS THE DRAIN DISCHARGING INTO A 4 |
| | INCH VENT. IF THIS IS A VENT STACK, THE DRAIN CANNOT |
| | DISCHARGE INTO THIS STACK. |
| | 6) THE PERMIT APPLICATION REFERS TO THE INSTALLATION OF |
| | A WATER LINE. SHOW THIS ON THE PLANS. WPB AMEND. TO FBC |
| | SEC. 107.2.1. |
| | 7) THE SUBMITTED APPLICATION REFERS TO A 2 INCH SEWER |
| | LINE BUT THE SUBMITTED PLUMBING DRAWING SHOWS AN 1 1/ 2 |
| | LINE. CLARIFY. SEE COMMENTT #2 FOR EXPLANATION OF |
| | BUILDING SEWER. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |