|
 |
 |
 |
 |
 |
Plan Review Details - Permit 17110631
| Plan Review Stops For Permit 17110631 |
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2017-12-18 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2017-12-13 |
Time |
09:14 |
Sent To |
|
|
| Notes |
| 2017-12-14 09:15:07 | RESUB ROUTED TO CCOLE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2017-11-17 |
Time |
|
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2017-11-15 |
Time |
14:43 |
Sent To |
M |
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2017-12-18 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-12-18 |
Time |
11:40 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-12-18 |
Time |
11:40 |
Sent To |
I |
|
| Notes |
| 2017-12-18 11:44:22 | 2ND REVIEW FBC-2014 MECHANICAL | | | PERMIT #17110631 | | | 12/18/17 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) THE SUBMITTED MECHANICAL PLAN IS ONE PART OF A | | | LARGER PLAN FOR INTERIOR RENOVATIONS, OR A TENANT | | | BUILD-OUT AT SUITE 215. ALL WORK AT THAT SUITE HAS BEEN | | | STOPPED UNDER A VIOLATION FOR WORK COMMENCING BEFORE | | | PERMIT. THEREFORE A THOROUGH REVIEW OF THE MECHANICAL | | | PLANS CANNOT BE PERFORMED AT THIS TIME UNTIL COMPLETE | | | ARCHITECTURAL AND MEP PLANS HAVE BEEN SUBMITTED THAT | | | CLARIFY THE USE AND OCCUPANCY OF THE SPACE. THE CURRENT | | | PLAN IS INDICATING PRESSURIZED "CLEAN ROOMS" WITH HEPA | | | FILTERING WHICH IS TYPICALLY FOUND IN MEDICAL OR | | | PHARMACEUTICAL PROCESSING FACILITIES. | | | | | | 2) CLARIFY HOW THE PRESSURIZATIONS AND HEPA FILTERING | | | SYSTEMS FOR THE ROOMS WAS ESTABLISHED- UNDER WHICH | | | DESIGN PARAMETERS, CRITERIA, CODE OR STANDARD, AND | | | PROVIDE A SUPPLEMENTAL TABLE THAT INDICATES THE | | | PRESSURE RELATIONSHIPS AND REQUIRED AIR CHANGES PER | | | HOUR FOR EACH ROOM. | | | | | | 3) THE 1/4"=1'0" SCALE DOES NOT MATCH THE PLAN. PLEASE | | | PROVIDE AN ACCURATELY SCALED PLAN- SECTION 107.2.1 WPB | | | AMENDMENTS TO THE FBC. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2017-11-17 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-11-17 |
Time |
13:17 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-11-17 |
Time |
13:17 |
Sent To |
|
|
| Notes |
| 2017-11-17 13:43:59 | 1ST REVIEW FBC-2014 MECHANICAL, WPB AMENDMENTS TO THE | | | FBC. | | | PERMIT #17110631 | | | 11/17/17 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) THE PLANS ARE NOT SUITABLE FOR REVIEW BECAUSE THEY | | | ARE A COPY OF ANOTHER FULL PLAN SHEET DRAWING THAT HAS | | | BEEN REDUCED DOWN IN SIZE, RESULTING IN THE DETAILS AND | | | NOTES ON THE PLAN TOO SMALL TO READ. PLEASE SEE | | | SECTIONS 107.2.1 AND 107.2.1.4 AND SUBMIT AN ORIGINAL | | | PLAN AT A MINIMUM 1/8" SCALE THAT IS OF SUFFICIENT | | | CLARIFY TO REVIEW. THE PLAN SHALL CLEARLY INDICATE THE | | | SCOPE | | | | | | OF WORK AND ALL NOTES AND DETAILS NOT APPLICABLE TO THE | | | PROPOSED WORK SHALL BE REMOVED. | | | | | | 2) SIGNATURE OF CONTRACTOR OR QUALIFIER ON PLANS | | | REQUIRED: SEE FLORIDA STATUTE 633.021, AND SECTION | | | 107.2.1 FBC. WPB AMENDMENTS TO THE FBC: ALL | | | INFORMATION, DRAWINGS, SPECIFICATIONS AND ACCOMPANYING | | | DATA SHALL BEAR THE NAME AND SIGNATURE OF THE PERSON | | | RESPONSIBLE FOR THE DESIGN. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |