Plan Review Details - Permit 17110374
Plan Review Stops For Permit 17110374
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2017-11-21 Cont ID  
Sent By cthroop Date 2017-11-21 Time 10:58 Rev Time 0.00
Received By cthroop Date 2017-11-21 Time 10:51 Sent To G
Notes
2017-11-21 10:59:21SENT TO P FOR GAS REVIEW UNDER SUB-PERMIT 17110377. CT

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-11-16 Cont ID  
Sent By jleahy Date 2017-11-16 Time 13:18 Rev Time 0.00
Received By jleahy Date 2017-11-16 Time 13:18 Sent To B
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2018-03-28 Cont ID  
Sent By thunt Date 2018-03-28 Time 10:51 Rev Time 0.00
Received By thunt Date 2018-03-28 Time 10:51 Sent To  
Notes
2018-03-28 10:53:12PROVIDE MANUFACTURES SPEC/ INSTALLATION MANUAL FOR 2ND
 STAGE REGUALTORS ON 1ST INSPECTION. SPEC PROVIDED ARE
 FOR SERVICE SIDE REGULATOR AND NOT APPROVED FOR USE ON
 2ND STAGE

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2018-03-13 Cont ID  
Sent By tklarge Date 2018-03-13 Time 05:39 Rev Time 0.00
Received By tklarge Date 2018-03-13 Time 04:54 Sent To I
Notes
2018-03-13 05:18:561) THERE ARE TWO DIFFERENT GAS DRAWINGS IN THIS
 SUBMITTAL PACKAGE. ONE SHOWS AN EXISTING GAS SYSTEM AND
 GAS METER TO WHICH THE GAS LINE FOR THE GENERATOR IS
 CONNECTED AND THE OTHER SHOWS A NEW GAS METER DEDICATED
 TO THE GENERATOR. IN ADDITION, THE GAS PERMIT
 APPLICATION DESCRIPTION OF WORK STATES "TIE INTO
 EXISTING NG METER FOR GENERATOR INSTALL." ALSO, THE
 RESPONSE LETTER FROM APS STATES THAT THIS IS A NEWW
 NATURAL GAS LINE FROM THE METER TO THE GENERATOR ONLY.
 NO OTHER APPLIANCES ARE ON THIS LINE WITH THE
 GENERATOR. AT THIS POINT, I HAVE NO IDEA WHAT IS BEING
 DONE OR HOW DUE TO THE CONFLICTING PLANS AND
 INFORMATION THAT HAS BEEN SUBMITTED. CLARIFY.
 2) REMOVE ALL OLD PLANS AND DOCUMENTS FROM THIS
 SUBMITTAL AND SUBMIT TWO COMPLETE SETS OF PLANS THAT
 CLEARLY REFLECT THE SCOPE OF PROPOSED WORK TO BE DONE.
 WPB AMEND. TO FBC SEC. 107.1, 107.2.1.
 3) THE REGULATOR SPECIFICATIONA THAT HAVE BEEN
 SUBMITTED ARE FOR SERVICE REGULATORS WHICH ARE
 INSTALLED BY THE GAS SUPPLIER. ARE YOU USING THESE AS
 THE 2ND STAGE REGULATOR AT THE GENERATOR? CLARIFY.
 4) SHEET P1 IS BECOMING DIFFICULT TO READ IN AREAS WITH
 SMALL PRINTING. SUBMIT TWO COPIES OF A CLEAR AND
 LEGIBLE PLAN. WPB AMEND. TO FBC SEC. 107.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2017-12-20 Cont ID  
Sent By thunt Date 2017-12-20 Time 06:18 Rev Time 0.00
Received By thunt Date 2017-12-20 Time 06:18 Sent To  
Notes
2017-12-20 06:38:4912/20/2017 2ND GAS REVIEW**DENIED88
  
 1) PLEASE PROVIDE SIZING TABLE FOR .5 LB SCH 40 PIPE
 GALV.SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL
 GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4
 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4,
 G2412.8, G2413.1, G2413.2, & G2413.3
  
 2) YOU ARE CONNECTING INTO AN EXISTING GAS SYSTEM AND
 ADDING BTU LOAD. YOU ARE REQUIRED TO SHOW POINT OF
 CONNECTING INTO THE EXISTING SYSTEM AND PIPE SIZING
 FROM METER TO SAID POINT OF CONNECTING WHILE LISTING
 ALL EXISTING BTU LOAD ON THAT SYSTEM. THE PLANS
 INDICATE AN EXISTING GAS METER. THE BTU LOAD OF THE
 EXISTING GAS SYSTEM MUST BE ADDED INTO THE TOTAL BTU
 LOAD ON THE SYSTEM TO ENSURE THE EXISTING SYSTEM IS
 PROPERLY SIZED. IF UNDERSIZED, THE EXISTING SYSTEM MUST
 BE REDONE TO ENSURE A SAFE OPERATING SYSTEM. SUBMIT A
 GAS PIPING RISER DIAGRAM THAT SHOWS THE TYPE OF
 EXISTING APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE
 PIPE SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE
 DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT
 OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF
 THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN
 A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO
 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE
 EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1,
 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1,
 G2413.2, G2413.3.
  
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2017-11-15 Cont ID  
Sent By destabro Date 2017-11-15 Time 11:13 Rev Time 0.00
Received By destabro Date 2017-11-15 Time 11:13 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2018-03-28 Cont ID  
Sent By thunt Date 2018-03-28 Time 10:53 Rev Time 0.00
Received By thunt Date 2018-03-26 Time 11:43 Sent To  
Notes
2018-03-27 11:43:16RESUB ROUTED TO THUNT

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-03-13 Cont ID  
Sent By tklarge Date 2018-03-13 Time 05:40 Rev Time 0.00
Received By tklarge Date 2018-03-08 Time 10:34 Sent To  
Notes
2018-03-09 10:34:25RESUB ROUTED TO THUNT

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-12-20 Cont ID  
Sent By thunt Date 2017-12-20 Time 06:39 Rev Time 0.00
Received By thunt Date 2017-12-11 Time 13:08 Sent To  
Notes
2017-12-12 13:08:28RESUB ROUTED TO THUNT

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-11-21 Cont ID  
Sent By cthroop Date 2017-11-21 Time 10:59 Rev Time 0.00
Received By cthroop Date 2017-11-09 Time 09:58 Sent To G
Notes
2017-11-13 09:58:15ROUTED TO ZONING

Review Stop Z ZONING
Rev No 1 Status P Date 2017-11-15 Cont ID  
Sent By destabro Date 2017-11-15 Time 11:13 Rev Time 0.00
Received By destabro Date 2017-11-15 Time 11:13 Sent To B
Notes
2017-11-15 11:14:1611/15/2017 - MEETS SIDE AND REAR SETBACK REQUIREMENTS.