Plan Review Details - Permit 17110229
Plan Review Stops For Permit 17110229
Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2018-02-20 Cont ID  
Sent By tklarge Date 2018-02-20 Time 08:35 Rev Time 0.00
Received By tklarge Date 2018-02-15 Time 13:27 Sent To  
Notes
2018-02-16 13:27:34RESUB ROUTED TO THUNT

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-01-19 Cont ID  
Sent By thunt Date 2018-01-19 Time 05:48 Rev Time 0.00
Received By thunt Date 2018-01-17 Time 10:49 Sent To I
Notes
2018-01-18 10:49:46RESUB ROUTED TO THUNT

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-12-06 Cont ID  
Sent By thunt Date 2017-12-06 Time 15:30 Rev Time 0.00
Received By thunt Date 2017-12-04 Time 14:53 Sent To  
Notes
2017-12-05 14:53:42RESUB ROUTED TO THUNT

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-11-08 Cont ID  
Sent By cpuell Date 2017-11-08 Time 16:12 Rev Time 0.00
Received By cpuell Date 2017-11-06 Time 13:08 Sent To  
Notes
2017-11-07 13:09:02ROUTED TO PLUMBING INBOX

Review Stop P PLUMBING
Rev No 4 Status P Date 2018-02-20 Cont ID  
Sent By tklarge Date 2018-02-20 Time 08:34 Rev Time 0.00
Received By tklarge Date 2018-02-20 Time 06:02 Sent To I
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status F Date 2018-01-19 Cont ID  
Sent By thunt Date 2018-01-19 Time 05:22 Rev Time 0.00
Received By thunt Date 2018-01-19 Time 05:22 Sent To  
Notes
2018-01-19 05:32:1601/19/2018 PLUMBING 3RD REVIEW**DENIED**
  
 IF THE PLAN FAILS REVIEW AGAIN THE FOLLOWING WILL
 APPLY: COMPLY WITH IN 10 DAYS.
  
 FLORIDA STATE STATUTES 553.80 (2) (B):WITH RESPECT TO
 EVALUATION OF DESIGN PROFESSIONALS? DOCUMENTS, IF A
 LOCAL GOVERNMENT FINDS IT NECESSARY, IN ORDER TO
 ENFORCE COMPLIANCE WITH THE FLORIDA BUILDING CODE AND
 ISSUE A PERMIT, TO REJECT DESIGN DOCUMENTS REQUIRED BY
 THE CODE THREE OR MORE TIMES FOR FAILURE TO CORRECT A
 CODE VIOLATION SPECIFICALLY AND CONTINUOUSLY NOTED IN
 EACH REJECTION, INCLUDING, BUT NOT LIMITED TO, EGRESS,
 FIRE PROTECTION, STRUCTURAL STABILITY, ENERGY,
 ACCESSIBILITY, LIGHTING, VENTILATION, ELECTRICAL,
 MECHANICAL, PLUMBING, AND GAS SYSTEMS, OR OTHER
 REQUIREMENTS IDENTIFIED BY RULE OF THE FLORIDA BUILDING
 COMMISSION ADOPTED PURSUANT TO CHAPTER 120, THE LOCAL
 GOVERNMENT SHALL IMPOSE, EACH TIME AFTER THE THIRD SUCH
 REVIEW THE PLANS ARE REJECTED FOR THAT CODE VIOLATION,
 A FEE OF FOUR TIMES THE AMOUNT OF THE PROPORTION OF THE
 PERMIT FEE ATTRIBUTED TO PLANS REVIEW.
  
 1) THE SIGNATURES ARE NOT WET AS REQUESTED. THE
 SIGNATURE FOR THE ROOFING CONTRACTOR (ROOFING CONCEPTS
 UNLIMITED) APPREARS IS A LIGHT COPY THAT HAS BEEN
 TRACED OVER ANS COPIED.
  
 2) THE SIGNATURE FOR THE ROOFING CONTRACTOR ( ANTHONY
 JACBAZZI) IS NOT THE LISED QUALIFIER AS LISTED IN
 MYFLORIDALICENSE.COM
  
 3) PLEASE LIST THE CITY AS (CITY OF WEST PALM BEACH) IN
 YOUR LETTERS
  
 4) LETTER MUST BE IN DUPLICATE (2)
  
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2017-12-06 Cont ID  
Sent By thunt Date 2017-12-06 Time 14:41 Rev Time 0.00
Received By thunt Date 2017-12-06 Time 14:41 Sent To  
Notes
2017-12-06 14:42:5412/06/2017 2ND PLUMBING REVIEW**DENIED**
  
  
 REQUEST LETTER FROM QUALIFIER ( GREGG D'ATTILE)
 ADVISING THAT ROOF DRAINS ASSEMLIES HAVE ALREADY BEEN
 INSTALLED WITHOUT A PLUMBING PERMIT AND WITHOUT ANY
 INSPECTION BEING PERFORMED BY THE CITY OF WEST PALM
 BEACH. THE LETTER SHALL ALSO STATE THAT THE DRAINS HAVE
 BEEN INSTALLED PER THE MANUFACTURE SPECS AND
 INSTALLATION MANUAL AND ART PLUMBING, AC, AND ELECTRIAL
 ( GREGG D'ATTILE) IS TAKING FULL RESPONSIBILITY OF THE
 ENTIRE JOB. WET SIGNED 2 COPIES
  
 ANY QUESTION PLEASE CALL PLAN REVIEWER
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-11-08 Cont ID  
Sent By thunt Date 2017-11-08 Time 14:38 Rev Time 0.00
Received By thunt Date 2017-11-08 Time 14:38 Sent To  
Notes
2017-11-08 14:45:1611/8/17 1ST PLUMBING REVIEW**DENIED**
  
 1) PLEASE EXPLAIN IS THIS A LIKE FOR LIKE REPLACEMENT
 AND ARE ANY DRAINS BEING ADDED OR DELETED FROM THE
 EXISTING SYSTEM OR CHANGING OF SIZE OF ANY DRAINS. FBC
 107.2.1
  
 2) PLEASE EXPLAIN HOW YOU PLAN ON LEAK CHECKING IF YOU
 DO NOT PLAN ON ON CUTTING DRYWALL CEILING OPEN FROM
 BELOW AND HOW THE INSPECTOR IS INSPECT WORK HE IS
 UNABLE TO SEE. FPC 312.1- RUNNING TEST OK
  
 3) PROVIDE MANUFACTURE INSTALLATION MANUAL AND ROOF
 DRAIN SPEC (2-COPIES OF EACH)
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT