Plan Review Details - Permit 17101134
| Plan Review Stops For Permit 17101134 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2017-11-14 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-11-14 |
Time |
08:25 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-11-14 |
Time |
08:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2017-11-06 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2017-11-06 |
Time |
16:37 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2017-11-06 |
Time |
16:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2017-10-31 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2017-10-31 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2017-10-31 |
Time |
11:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2017-12-12 |
Time |
|
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2017-12-06 |
Time |
12:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2017-11-14 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-11-14 |
Time |
08:27 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-10-27 |
Time |
13:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2017-12-12 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-12-12 |
Time |
08:56 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-12-12 |
Time |
07:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2017-11-03 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-11-03 |
Time |
11:53 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-11-03 |
Time |
11:36 |
Sent To |
|
|
| Notes |
| 2017-11-03 12:10:12 | 1ST REVIEW FBC-2014 MECHANICAL | | | PERMIT #17101134 | | | 11/3/17 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) REFER TO 513 SMOKE CONTROL SYSTEMS, AND SPECIFICALLY | | | SECTIONS 513.10, AND 513.10.5. VERIFY THAT THE NEW | | | GREENHECK TFI-FS FAN IS RATED AND CERTIFIED BY THE | | | MANUFACTURER FOR THE PROBABLE TEMPERATURE RISE, IS UL | | | LISTED AS A POWER VENTILATOR FOR SMOKE CONTROL, AND | | | THAT IT IS EQUIPPED WITH TWO BELTS. | | | | | | 2) SHEET M3.1) PROVIDE THE WIND LOAD DESIGN CRITERIA | | | PER SECTION 1609 FBC-14 BUILDING. | | | | | | 3) M4.1) THE SHEET IS TOO FAINT TO READ AND NOT | | | LEGIBLE- SECTION 107.1 WPB AMENDMENTS TO THE FBC. | | | | | | 4) VERIFY THE FAN IS BEING SUPPLIED WITH TWO SOURCES OF | | | POWER- PRIMARY FROM THE NORMAL BUILDING SYSTEM, AND | | | SECONDARY FROM AN APPROVED STANDBY SOURCE- SECTION | | | 513.11. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2017-11-14 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-11-14 |
Time |
08:26 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-11-14 |
Time |
08:26 |
Sent To |
|
|
| Notes |
| 2017-12-19 14:11:38 | MECH DIG/SIGS GOOD- | | | CCOLE-12/19/17 | | 2017-11-14 08:26:52 | SIGNATURES OK | | | PROVISO - ANY NEW SHEETS SUBMITTED REQUIRE NEW REVIEW | | | | | | |
|
|
|