| 2017-12-19 18:16:14 | 2ND REVIEW: FBC 2014 5TH EDITION |
| | |
| | PLUMBING COMMENTS: TO EXPEDITE THE APPROVAL OF THIS |
| | PERMIT I SUGGEST A MEETING TO GO OVER THE COMMENTS BE |
| | SCHEDULED SEE MY CONNECT INFO BELOW. |
| | |
| | 1. RESPONSE TO COMMENT #1 DOES NOT COMPLY YOU AND I |
| | MIGHT UNDERSTAND BUT THE PERSON INSTALLING THE GRAB BAR |
| | MAY NOT IF THEY MEASURE 36" TO THE CENTER THE GRAB BAR |
| | WILL BE MOUNTED TO HIGH PLEASE PLACE NOT ON PLAN OR |
| | SHOW THE DIMENSION TO THE TOP OF GRAB BAR. PER WPB |
| | AMEND TO FBC 107.2.1 AND FBC ACC 609.4 |
| | |
| | 2. RESPONSE TO COMMENT #8 DOES NOT COMPLY, THE SPECS ON |
| | P-1 ARE VERY LIGHT AND WILL NOT SCAN FOR OUR RECORDS |
| | PLEASE PLACE A NOTE ON THE PLAN THAT STATES THAT THE |
| | MANUFACTURE SPECIFICATIONS AND INSTALLATION GUIDES |
| | SHALL BE ON THE JOBSITE FOR INSPECTIONS. PER WPB AMEND |
| | TO FBC 107.2.1 AND 107.2.1.4 |
| | |
| | 3. RESPONSE TO COMMENT #9 DOES NOT COMPLY, THE DETAIL |
| | ON P-3 FOR DENTAL UNIT IS ILLEGIBLE AND CONFUSING, IF |
| | THIS IS A MANUFACTURED UNIT THE NOTE ON THE PLAN FOR |
| | SPECIFICATIONS ON JOBSITE FOR INSPECTION WILL SUFFICE, |
| | IF NOT PLEASE PROVIDE A DETAIL THAT IS CLEAR AND HAS |
| | PIPE SIZES AND TYPE OF PIPE ON IT. PER WPB AMEND TO FBC |
| | 107.2.1 AND 107.2.1.4 |
| | |
| | 4. THE EXHAUSTS FROM A VACUUM PUMP SERVING A VACUUM |
| | (FLUID SUCTION) SYSTEM SHALL DISCHARGE SEPARATELY TO |
| | OPEN AIR ABOVE THE ROOF. PLEASE SHOW ON P-4. PER FBC |
| | 713.6 |
| | |
| | 5. RESPONSE TO COMMENT #11 DOES NOT COMPLY, THE |
| | DIRECTIONAL FITTINGS ARE STILL SHOWN WITH THE WRONG |
| | FLOW DIRECTION PLEASE CLARIFY. PER WPB AMEND TO FBC |
| | 107.2.1 |
| | |
| | 6. RESPONSE TO COMMENT #12 DOES NOT COMPLY, PLEASE SHOW |
| | HOT WATER RETURN PIPING ON WATER ISOMETRIC DRAWING. PER |
| | WPB AMEND TO FBC 107.2.1 |
| | |
| | 7. SHT. P-2 THE SANITARY AND WATER ISOMETRIC DRAWINGS |
| | ARE VERY LIGHT ON THE PLAN SHEET WHEN SCANNED IN FO |
| | ROUR RECORDS WILL NOT SHOW UP AND THEY ARE DIFFICULT TO |
| | READ THEY TO COMPRESSED PLEASE DARKEN AND EXPAND THE |
| | DIAGRAMS. PER WPB AMEND TO FBC 107.2.1 AND 107.2.1.4 |
| | |
| | 8. SHT. P-2 THE NOTE ON THE PLAN THAT READS TRAP SEAL |
| | TIE INTO SANITARY FOR COMPRESSOR, DOES NOT MAKE ANY |
| | SENSE TO ME PLEASE CLARIFY. PER WPB AMEND TO FBC |
| | 107.2.1 |
| | |
| | 9. SHT. P-2 THE SANITARY PIPING FOR THE EQUIPMENT ROOM |
| | IS UN CLEAR PLEASE EXPAND AND SHOW THE TRAP FOR THE MOP |
| | SINK. TRAP FOR THE FLOOR DRAIN AND THE TRAP FOR THE |
| | VACUUM TANK DRAIN ALSO THE VENT FOR THESE FIXTURE. |
| | 912.1 AND FBC PL 1002.1, 901.2.1 |
| | |
| | 10. SHT. P-2 IT DOES NOT APPEAR THAT THE SANITARY |
| | SYSTEM HAS A VENT THAT EXTENDS TO THE OUTDOORS AT LEAST |
| | ONE VENT SHALL PLEAS CLEARLY SHOW ON THE ISOMETRIC |
| | DRAWING PER FBC PL 904.1 |
| | |
| | 11. SHT. P-2 THE WATER CLOSET SHOULD CONNECT TO THE WET |
| | VENTS OF EACH BATHROOM GROUP. PER FBC PL 912.1 |
| | |
| | 12. SHT. P-2 ON THE SANITARY RISER WHAT IS THE PIPING |
| | SHOWN WITH AN S THAT IS GOING UP TH THE NOTE ABOUT THE |
| | COMPRESSOR INTAKE IF IT IS THE PIPE FOR THE INTAKE |
| | REMOVE FROM SANITARY AND SHOW ON P-4 RISER. PER WPB |
| | AMEND TO FBC 107.2.1 |
| | |
| | 13. PLEASE CLARIFY ON PLAN TEMPERED WATER SHALL BE |
| | DELIVERED FROM LAVATORIES AND GROUP WASH FIXTURES |
| | LOCATED IN PUBLIC TOILET FACILITIES PROVIDED FOR |
| | CUSTOMERS, PATRONS AND VISITORS. TEMPERED WATER SHALL |
| | BE DELIVERED THROUGH AN APPROVED WATER-TEMPERATURE |
| | LIMITING DEVICE THAT CONFORMS TO ASSE 1070 OR CSA |
| | B125.3. PER FBC PL 416.5 |
| | |
| | 14. SHT. P-3 WHERE OR HOW WILL THE ECONOMY SELF |
| | CONTAINED WATER SYSTEM BE USED PLEASE CLARIFY. PER WPB |
| | AMEND TO FBC 107.2.1 |
| | |
| | 15. SHT. P-5 THE STATE MANUFACTURE SPECIFICATIONS FOR |
| | THE WATER HEATER ARE FOR SMALLER RESIDENTIAL MODELS |
| | UNDER THE NOTES IT LIST A 50 GAL RHEEM WATER HEATER |
| | PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 16. SHT. P-5 UNDER THE NOTES IT REFERENCES THE FBC 2010 |
| | THIS PROJECT IS UNDER FBC 2014 5TH EDITION P[LEASE |
| | CLARIFY. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 17. PLEASE SHOW COMPLIANCE WITH FBC PL 607.3 THERMAL |
| | EXPANSION CONTROL. |
| | A MEANS OF CONTROLLING INCREASED PRESSURE CAUSED BY |
| | THERMAL EXPANSION SHALL BE PROVIDED WHERE REQUIRED IN |
| | ACCORDANCE WITH SECTIONS 607.3.1 AND 607.3.2. |
| | |
| | 607.3.1 PRESSURE-REDUCING VALVE. |
| | FOR WATER SERVICE SYSTEM SIZES UP TO AND INCLUDING 2 |
| | INCHES (51 MM), A DEVICE FOR CONTROLLING PRESSURE SHALL |
| | BE INSTALLED WHERE, BECAUSE OF THERMAL EXPANSION, THE |
| | PRESSURE ON THE DOWNSTREAM SIDE OF A PRESSURE-REDUCING |
| | VALVE EXCEEDS THE PRESSURE-REDUCING VALVE SETTING. |
| | |
| | 607.3.2 BACKFLOW PREVENTION DEVICE OR CHECK VALVE. |
| | WHERE A BACKFLOW PREVENTION DEVICE, CHECK VALVE OR |
| | OTHER DEVICE IS INSTALLED ON A WATER SUPPLY SYSTEM |
| | UTILIZING STORAGE WATER HEATING EQUIPMENT SUCH THAT |
| | THERMAL EXPANSION CAUSES AN INCREASE IN PRESSURE, A |
| | DEVICE FOR CONTROLLING PRESSURE SHALL BE INSTALLED. |
| | |
| | |
| | 18. SHT. P-5 THE DISCHARGE PIPING SERVING A PRESSURE |
| | RELIEF VALVE, TEMPERATURE RELIEF VALVE OR COMBINATION |
| | THEREOF SHALL DISCHARGE THROUGH AN AIR GAP LOCATED IN |
| | THE SAME ROOM AS THE WATER HEATER. PER FBC PL 504.6 |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |