| 2017-08-29 16:14:35 | 8/29/17 1ST REVIEW DENIED |
| | |
| | CITY RECORDS SHOW AN EXISTING GAS SYSTEM IN PLACE. |
| | PLEASE ADDRESS THE FOLLOWING REQUIREMENTS BELOW |
| | |
| | 1) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 FBC-FUEL |
| | GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC. G2413 |
| | |
| | 2) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| | BTU LOAD ON THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS |
| | SECS.401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 |
| | (37) OR 2014 FBC-RES. SEC. G2413 |
| | |
| | 3) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014 |
| | FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G |
| | 2413.3. |
| | |
| | 4) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 |
| | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1 |
| | |
| | 5) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE |
| | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM |
| | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE |
| | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL |
| | GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4 |
| | (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4, |
| | G2412.8, G2413.1, G2413.2, & G2413.3. |
| | |
| | 6) RECORDS INDICATE AN EXISTING GAS METER. THE BTU LOAD |
| | OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE TOTAL |
| | BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING SYSTEM IS |
| | PROPERLY SIZED. IF UNDERSIZED, THE EXISTING SYSTEM MUST |
| | BE REDONE TO ENSURE A SAFE OPERATING SYSTEM. SUBMIT A |
| | GAS PIPING RISER DIAGRAM THAT SHOWS THE TYPE OF |
| | EXISTING APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE |
| | PIPE SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE |
| | DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT |
| | OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF |
| | THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN |
| | A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO |
| | 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE |
| | EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1, |
| | 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1, |
| | G2413.2, G2413.3 |
| | |
| | 7)SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE |
| | APPLIANCE. COMPLY WITH 2014 FBC-FUEL GAS TABLE 402.4 |
| | (28) FOR THE PROPER PIPE SIZE AND BTU LOAD. |
| | |
| | TIM HUNT |
| | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | 561-805-6695 |
| | [email protected] |
| | |
| | |
| | |
| | |