Plan Review Details - Permit 17081155
Plan Review Stops For Permit 17081155
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2017-09-07 Cont ID  
Sent By rmcdouga Date 2017-09-07 Time 16:49 Rev Time 0.00
Received By rmcdouga Date 2017-09-07 Time 15:47 Sent To  
Notes
2017-09-07 16:06:24FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-09-01 Cont ID  
Sent By jleahy Date 2017-09-01 Time 16:00 Rev Time 0.00
Received By jleahy Date 2017-09-01 Time 16:00 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2017-08-30 Cont ID  
Sent By thunt Date 2017-08-30 Time 13:52 Rev Time 0.00
Received By thunt Date 2017-08-30 Time 13:52 Sent To  
Notes
2017-08-30 13:53:14NO GAS ELECTRIC HEAT PUMP HEATER

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-09-07 Cont ID  
Sent By rmcdouga Date 2017-09-07 Time 16:49 Rev Time 0.00
Received By rmcdouga Date 2017-08-24 Time 13:25 Sent To  
Notes
2017-08-25 13:26:00ROUTED TO ZONING

Review Stop P PLUMBING
Rev No 1 Status P Date 2017-08-30 Cont ID  
Sent By thunt Date 2017-08-30 Time 13:51 Rev Time 0.00
Received By thunt Date 2017-08-30 Time 13:51 Sent To  
Notes
2017-08-30 13:52:44HEAT PUMP MANUEL/ SPECS REQUIRED BY 1ST
 INSPECTION**BACKFLOW REQUIRED WITH SEPERATE PERMIT BY
 PLUMBING CONTRACTOR

Review Stop Z ZONING
Rev No 1 Status P Date 2017-08-28 Cont ID  
Sent By njwira Date 2017-08-28 Time 17:25 Rev Time 0.00
Received By njwira Date 2017-08-25 Time 16:50 Sent To  
Notes
***NONE***