Plan Review Details - Permit 17071138
Plan Review Stops For Permit 17071138
Review Stop G GAS REVIEW
Rev No 3 Status P Date 2017-08-23 Cont ID  
Sent By tklarge Date 2017-08-23 Time 05:19 Rev Time 0.00
Received By tklarge Date 2017-08-23 Time 05:08 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2017-08-15 Cont ID  
Sent By lcrespo Date 2017-08-15 Time 15:33 Rev Time 0.00
Received By lcrespo Date 2017-08-15 Time 15:22 Sent To  
Notes
2017-08-15 15:32:291) PLEASE SUBMIT TWO COPIES OF ANCHORING DETAILS FOR
 UNDERGROUND TIE DOWNS FOR LP TANK.
  
 PLEASE NOTE THAT THE ENGENIRING FROM SEAL FROM R. F.
 TUCKER IS NOT ACCEPTABLEBLE PER THE FL. ADMIN. CODE
 RULE 61G15-23.001.A

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2017-08-08 Cont ID  
Sent By tklarge Date 2017-08-08 Time 04:38 Rev Time 0.00
Received By tklarge Date 2017-08-08 Time 03:27 Sent To  
Notes
2017-08-08 04:19:021) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE
 GENERATOR. INDICATE THE TYPE OF PIPE TO BE USED TO
 CONNECT THE GENERATOR TO THE GAS SUPPLY LINE.
 2) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE LOW PRESSURE GAS SYSTEM TO THE
 GENERATOR OR PLACE A NOTE ON THE PLANS/DRAWINGS
 SPECIFYING WHICH SIZING TABLE(S) FROM THE GAS CODE OR
 OTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS GAS
 SYSTEM. REFER TO THE 2014 FBC-FUEL GAS SECS. 401.4,
 401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 (37)
 OR 2014 FBC-RES. SEC. G2412.4, G2412.8, G2413.1,
 G2413.2, & G2413.3.
 3) SHOW THE DISTANCE OF THE LP TANK FROM THE DRIVEWAY.
 IF THE TANK IS LOCATED IN AREAS WHERE VEHICULAR TRAFFIC
 IS EXPECTED, THE INSTALLATION SHALL CCOMPLY WITH NFPA
 58, SEC. 6.6.6.1 (B), (C), (E).
 4) SHOW THE DISTANCE OF THE LP TANK FROM THE STRUCTURE.
 COMPLY WITH NFPA 58, TABLE 6.3.1.
 5) THE SUBMITTED TANK ANCHORING DETAILS/ENGINEERING
 FROM R.F. TUCKER MUST BEAR AN ORIGINAL SEAL AND
 SIGNATURE PER THE FL. ADMIN. CODE RULE 61G15-23.001. A
 COPY OF THE ENGINEER'S SEAL AND SIGNATURE IS A
 VIOLATION OF THIS RULE.
 6) THE GENERATOR SHALL BE INSTALLED IN ACCCORDANCE WITH
 THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND NFPA
 37. THE GENERATOR SHALL MEET THE REQUIREMENTS OF UL
 2200. 2014 FBC-FUEL GAS SEC.616.1.
 7) SUBMIT THE MANUFACTURER'S SPECIFICATIONS FOR THE
 GENERATOR. FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3
 OR 2014 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE
 LISTED AND LABELED. THE INSTALLATION MANUALS FOR ALL
 GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME
 OF INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-08-23 Cont ID  
Sent By tklarge Date 2017-08-23 Time 05:19 Rev Time 0.00
Received By tklarge Date 2017-08-21 Time 13:53 Sent To  
Notes
2017-08-22 13:53:34RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status F Date 2017-08-15 Cont ID  
Sent By lcrespo Date 2017-08-15 Time 15:33 Rev Time 0.00
Received By lcrespo Date 2017-08-11 Time 16:07 Sent To  
Notes
2017-08-14 16:07:53TLARGE'S DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-08-08 Cont ID  
Sent By tklarge Date 2017-08-08 Time 04:39 Rev Time 0.00
Received By tklarge Date 2017-07-27 Time 13:22 Sent To  
Notes
2017-07-28 13:22:49PLUMB <5K