Plan Review Details - Permit 17070787
Plan Review Stops For Permit 17070787
Review Stop G GAS REVIEW
Rev No 3 Status P Date 2017-11-06 Cont ID  
Sent By thunt Date 2017-11-06 Time 14:16 Rev Time 0.00
Received By thunt Date 2017-11-06 Time 14:16 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2017-10-04 Cont ID  
Sent By thunt Date 2017-10-04 Time 16:35 Rev Time 0.00
Received By thunt Date 2017-10-04 Time 16:35 Sent To  
Notes
2017-10-04 16:43:1510/4/17 GAS 2ND REVIEW**DENIED**
  
 1ST REVIEW COMMENTS NOT ADDRESSED
  
 1) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 FBC-FUEL
 GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC.
 G2413.***YOU ARE ONLY SHOWER P.E PIPING***
  
 2) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE
 CORRUGATED STAINLESS STEEL TUBING
 (IF APPLICABLE) FOR EACH PIPE SIZE. WPB AMENDMENTS TO
 FBC SEC.107.2.1**YOU ARE NOT SHOWING WHAT PIPING
 MATERIAL THAT WILL BE INSTALLED ABOVE GROUND
  
 3) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1.**NONE
 SUBMITTED**
  
 4) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL
 GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4
 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4,
 G2412.8, G2413.1, G2413.2, & G2413.3.***YOU ONLY
 PROVIDED THE TABLE FOR P.E PIPING
  
 5) THE PLANS INDICATE AN EXISTING GAS METER. THE BTU
 LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE
 TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING
 SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING
 SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING
 SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS
 THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH
 APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH
 APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF
 PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE
 EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE
 SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE
 REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES.
 FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR
 SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3.**SHOW
 EXISTING SYSTEM ON ISOMETRIC**
  
  
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2017-07-24 Cont ID  
Sent By thunt Date 2017-07-24 Time 15:11 Rev Time 0.00
Received By tklarge Date 2017-07-24 Time 15:13 Sent To  
Notes
2017-07-24 15:11:041)DUE TO THE SUBMITTED GAS PLAN HAVING TOO MANY
 VIOLATIONS TO LIST I HAVE ATTACHED IN THE FOLDER A COPY
 OF THE APPLICATION REQUIREMENT AND HIGHLIGHTED THE
 FEILDS THAT NEED TO BE ADDRESSED.
  
 2) PLEASE PROVIDE COPY OF CONTRACT TO VALIDATE VALVE
 LISTED ON PERMIT APPLICATION PER FBC / WPB AMENDMENT
 109.3
  
 TIM HUNT
 PLUMBING INSPECTOR / PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6696
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-11-06 Cont ID  
Sent By cpuell Date 2017-11-06 Time 16:17 Rev Time 0.00
Received By cpuell Date 2017-11-01 Time 14:09 Sent To  
Notes
2017-11-02 14:09:27RESUB ROUTED TO THUNT

Review Stop I INCOMING/PROCESSING
Rev No 2 Status F Date 2017-10-04 Cont ID  
Sent By thunt Date 2017-10-04 Time 16:43 Rev Time 0.00
Received By thunt Date 2017-09-29 Time 12:44 Sent To  
Notes
2017-10-02 12:44:46RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-07-24 Cont ID  
Sent By tklarge Date 2017-07-24 Time 15:14 Rev Time 0.00
Received By tklarge Date 2017-07-19 Time 11:36 Sent To  
Notes
2017-07-20 11:37:07PLUMB -$5000

Review Stop P PLUMBING
Rev No 3 Status P Date 2017-11-06 Cont ID  
Sent By thunt Date 2017-11-06 Time 14:16 Rev Time 0.00
Received By thunt Date 2017-11-06 Time 14:16 Sent To I
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2017-10-04 Cont ID  
Sent By thunt Date 2017-10-04 Time 16:27 Rev Time 0.00
Received By thunt Date 2017-10-04 Time 16:26 Sent To  
Notes
2017-10-04 16:35:2310/4/17 PLUMBING 2ND REVIEW*DENIED*
  
 COMMENTS FROM 1ST REVIEW NOT ANSWERED IN FULL OR NOT
 ADDRESSED AT ALL. 2ND REQUEST
  
 1) SUBMIT SPECIFICATION SHEETS/ INSTALLATION MANUAL FOR
 EJECTOR PUMP AND BASIN FBC 107.2.1
  
 2) SHOW REQUIRED VALVES ON EJECTOR PUMP FBC-P3007.2
  
 3) AAV ARE NOT PERMITTED ON EJECTOR PUMP SHOW HOW YOU
 WILL COMPLY WITH FBC-P3114.8
  
 4) EXPLAIN AND SHOW WITH DETAIL HOW YOU INTENT TO
 CONNECTED THE EJECTOR PUMP DISCHARGE TO THE EXISTING
 SYSTEM AND IF ANY TUNNELIING WITH BE DONE.107.2.1

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-07-24 Cont ID  
Sent By thunt Date 2017-07-24 Time 14:59 Rev Time  
Received By thunt Date 2017-07-24 Time   Sent To  
Notes
2017-07-24 14:58:001) SUBMIT SPECIFICATION SHEETS / INSTALLATION MANUAL
 FOR EJECTOR PUMP AND BASIN
  
 2) SHOW GATE VALVE AFTER CHECK VALVE ON DRAWING
  
 3) SHOW AND EXPLAIN VENTING SYSTEM AND SHOW REQUIRED
 VENT AT PUMP BASIN
  
 4) REQUIRED SEPERATE ELECTRIC PERMIT FOR PUMP
  
 5) PLEASE ADVISE HOW YOU WILL BE CONNECTING TO THE
 EXISTING KITCHEN DRAIN LINE AND IF THERE WILL BE ANY
 TUNNELING UNDER THE HOME. IF TUNNELING IS TO BE DONE
 PLEASE SUBMIT THE FOLLOWING:
  
 A CLEAR AND LEGIBLE SANITARY RISER DIAGRAM SHALL BE
 SUBMITTED SHOWING ALL PIPE SIZES, CONNECTION POINTS TO
 EXISTING PIPING, HOW THE NEW PIPE WILL BE SUPPORTED,
 THE TYPE OF ADAPTERS USED FOR THE CONNECTIONS TO
 EXISTING PIPE, AND THE LOCATIONS OF REQUIRED CLEANOUTS.
 DETAILS AND BACKFILLING PROCEDURES SHALL BE SUBMITTED
 THAT CLEARLY SHOW HOW THE STRUCTURAL INTEGRITY OF THE
 CONCRETE SLAB WILL BE MAINTAINED DURING EXCAVATION AND
 BACKFILLING. STRUCTURAL FOAM IS NOT PERMITTED BELOW
 GROUND PER THE FLORIDA BUILDING CODE, RESIDENTIAL,
 SECTION 318 AND THE FLORIDA BUILDING CODE, BUILDING,
 SECTION 2603.8.
  
 TIM HUNT
 PLUMBING INSPECTOR / PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved