| Plan Review Stops For Permit 17070680 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2017-09-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-09-22 |
Time |
17:30 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-09-22 |
Time |
17:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2017-08-02 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-08-02 |
Time |
11:23 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-08-02 |
Time |
11:23 |
Sent To |
|
|
| Notes |
| 2017-08-02 11:25:50 | PASSED BY JW ON 7/27/17 | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2017-09-28 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2017-09-28 |
Time |
16:37 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2017-09-28 |
Time |
16:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2017-07-27 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2017-07-27 |
Time |
10:28 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2017-07-27 |
Time |
10:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2017-09-20 |
|
|
Cont ID |
|
| Sent By |
wjolin |
Date |
2017-09-20 |
Time |
09:57 |
Rev Time |
0.00 |
| Received By |
wjolin |
Date |
2017-09-20 |
Time |
09:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2017-07-21 |
|
|
Cont ID |
|
| Sent By |
wjolin |
Date |
2017-07-21 |
Time |
13:46 |
Rev Time |
0.00 |
| Received By |
wjolin |
Date |
2017-07-21 |
Time |
13:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2017-10-03 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2017-10-03 |
Time |
14:43 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-09-18 |
Time |
13:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2017-08-02 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-08-02 |
Time |
11:25 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-07-18 |
Time |
16:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
N |
Date |
2017-09-28 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-09-28 |
Time |
08:44 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-09-28 |
Time |
07:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2017-10-31 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-07-25 |
Time |
11:51 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-07-25 |
Time |
11:51 |
Sent To |
|
|
| Notes |
| 2017-07-25 12:01:43 | 1ST REVIEW FBC-2014 MECHANICAL | | | PERMIT #17070680 | | | 7/25/17 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) PLEASE PROVIDE A MORE COMPREHENSIVE MECHANICAL PLAN | | | SHOWING ALL REQUIRED CHANGES TO THE EXISTING SYSTEM(S) | | | AS A RESULT OF THE CHANGE FROM ONE TO TWO TENANT | | | SPACES, AND THE INSTALLATION OF A DEMISING WALL. IT | | | WOULD APPEAR BY THE SCOPE OF THE PROJECT THAT SOME | | | DUCTS WOULD HAVED TO TE DEMOLISHED OR RELOCATED BECAUSE | | | OF THE DEMISING WALL. SHOW THE LOCATION OF THE AIR | | | HANDLER AND INDICATE HOW AIR IS BEING RETURN TO THE | | | UNIT FROM BOTH TENANT SPACES- SECTION 107.2.1 WPB | | | AMENDMENTS TO THE FBC. | | | | | | 2) PROVIDE THE SIZE OF THE SUPPLY DUCT IN THE OFFICE | | | WHERE THE 10" TRANSFER DUCT IS TO BE INSTALLED- SECTION | | | 601.5 EXCEPTION 1. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2017-10-03 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2017-10-03 |
Time |
14:42 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-10-03 |
Time |
14:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2017-07-26 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2017-07-26 |
Time |
11:19 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-07-26 |
Time |
11:19 |
Sent To |
|
|
| Notes |
| 2017-07-26 11:46:12 | 1ST REVIEW: FBC 2014 5TH EDITION | | | | | | PLUMBING COMMENTS: | | | | | | 1. NEW BAR SINK SHALL COMPLY WITH FBC ACC 606.2 CLEAR | | | FLOOR SPACE. | | | A CLEAR FLOOR SPACE COMPLYING WITH 305, POSITIONED FOR | | | A FORWARD APPROACH, AND KNEE AND TOE CLEARANCE | | | COMPLYING WITH 306 SHALL BE PROVIDED. | | | 606.3 HEIGHT. | | | LAVATORIES AND SINKS SHALL BE INSTALLED WITH THE FRONT | | | OF THE HIGHER OF THE RIM OR COUNTER SURFACE 34 INCHES | | | (865 MM) MAXIMUM ABOVE THE FINISH FLOOR OR GROUND. | | | | | | 2. PROVIDE SANITARY AND WATER RISER DIAGRAM. PER WPB | | | AMEND TO FBC 107.3.5.1.3(13) | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | | THE PREVIOUSLY REVIEWED SHEETS. | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] | | | |
|
|