|
 |
 |
 |
 |
 |
Plan Review Details - Permit 17070566
| Plan Review Stops For Permit 17070566 |
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2017-07-20 |
|
|
Cont ID |
|
| Sent By |
wjolin |
Date |
2017-07-20 |
Time |
08:40 |
Rev Time |
0.00 |
| Received By |
wjolin |
Date |
2017-07-20 |
Time |
08:40 |
Sent To |
M |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2017-09-05 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2017-08-29 |
Time |
09:35 |
Sent To |
|
|
| Notes |
| 2017-08-30 09:35:48 | RESUB ROUTED TO CCOLE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2017-07-26 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2017-07-14 |
Time |
16:09 |
Sent To |
|
|
| Notes |
| 2017-07-17 16:09:57 | ROUTED TO FIRE INBOX |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2017-09-05 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-09-05 |
Time |
10:51 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-09-05 |
Time |
08:00 |
Sent To |
|
|
| Notes |
| 2017-09-05 11:32:30 | MECHANICAL PROVISOS: | | | | | | 1) PROVIDE SITE SPECIFIC WIND LOAD ENGINEERING FOR | | | INSTALLATION OF THE MAKEUP AIR SYSTEM CONDENSER ON THE | | | ROOF. | | | | | | 2) COMPLETE MANUFACTURER'S SPECIFICATIONS AND | | | INSTALLATION INSTRUCTIONS FOR THE GREASE DUCT WRAP | | | SHALL BE ONSITE AT TIME OF INSPECTION. | | | | | | CCOLE- 9/5/17 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2017-07-26 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-07-26 |
Time |
14:52 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-07-26 |
Time |
14:52 |
Sent To |
|
|
| Notes |
| 2017-07-26 15:13:57 | 1ST REVIEW FBC-2014 MECHANICAL | | | PERMIT #17070566 | | | 7/26/17 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) ADVISORY: SEPARATE PERMITS ARE REQUIRED FOR THE FIRE | | | SUPPRESSION SYSTEM, AND THE KITCHEN BUILD-OUT INCLUDING | | | THE COOKING APPLIANCES AND GAS WORK- SECTION 107.2.1 | | | WPB AMENDMENTS TO THE FBC. | | | | | | 2) A SMOOTH, CLEANABLE, NON-ABSORBENT AND | | | NON-COMBUSTIBLE MATERIAL SHALL BE INSTALLED BETWEEN THE | | | HOOD AND THE WALL EXTENDING NOT LESS THAN 18" IN ALL | | | DIRECTIONS FROM THE HOOD- SECTION 507.9 EXCEPTION. | | | | | | 3) PROVIDE A ROOF PLAN SHOWING THE LOCATIONS OF THE MUA | | | INTAKE AND THE EXHAUST FAN AND ALL REQUIRED CLEARANCE | | | DISTANCE MEASUREMENTS FROM MECHANICAL AND GRAVITY | | | EXHAUST OUTLETS AND AIR INTAKES, AND ROOF EDGES- | | | SECTIONS 304.11, 401.4, 506.3.13.3 | | | | | | 4) PROVIDE WIND LOAD ENGINEERING AND WIND LOAD DESIGN | | | CRITERIA FOR INSTALLATION OF THE MUA CURB AND THE | | | EXHAUST FAN AND CURB- SECTION 301.15. | | | | | | 5) SUBMIT MANUFACTURER'S SPECIFCATIONS FOR THE DUCT | | | WRAP- SECTION 506.3.11.2. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |