Plan Review Details - Permit 17070566
Plan Review Stops For Permit 17070566
Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2017-07-20 Cont ID  
Sent By wjolin Date 2017-07-20 Time 08:40 Rev Time 0.00
Received By wjolin Date 2017-07-20 Time 08:40 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2017-09-05 Time   Rev Time 0.00
Received By lmarchan Date 2017-08-29 Time 09:35 Sent To  
Notes
2017-08-30 09:35:48RESUB ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2017-07-26 Time   Rev Time 0.00
Received By lmarchan Date 2017-07-14 Time 16:09 Sent To  
Notes
2017-07-17 16:09:57ROUTED TO FIRE INBOX

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2017-09-05 Cont ID  
Sent By ccole Date 2017-09-05 Time 10:51 Rev Time 0.00
Received By ccole Date 2017-09-05 Time 08:00 Sent To  
Notes
2017-09-05 11:32:30MECHANICAL PROVISOS:
  
 1) PROVIDE SITE SPECIFIC WIND LOAD ENGINEERING FOR
 INSTALLATION OF THE MAKEUP AIR SYSTEM CONDENSER ON THE
 ROOF.
  
 2) COMPLETE MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE GREASE DUCT WRAP
 SHALL BE ONSITE AT TIME OF INSPECTION.
  
 CCOLE- 9/5/17

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2017-07-26 Cont ID  
Sent By ccole Date 2017-07-26 Time 14:52 Rev Time 0.00
Received By ccole Date 2017-07-26 Time 14:52 Sent To  
Notes
2017-07-26 15:13:571ST REVIEW FBC-2014 MECHANICAL
 PERMIT #17070566
 7/26/17
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) ADVISORY: SEPARATE PERMITS ARE REQUIRED FOR THE FIRE
 SUPPRESSION SYSTEM, AND THE KITCHEN BUILD-OUT INCLUDING
 THE COOKING APPLIANCES AND GAS WORK- SECTION 107.2.1
 WPB AMENDMENTS TO THE FBC.
  
 2) A SMOOTH, CLEANABLE, NON-ABSORBENT AND
 NON-COMBUSTIBLE MATERIAL SHALL BE INSTALLED BETWEEN THE
 HOOD AND THE WALL EXTENDING NOT LESS THAN 18" IN ALL
 DIRECTIONS FROM THE HOOD- SECTION 507.9 EXCEPTION.
  
 3) PROVIDE A ROOF PLAN SHOWING THE LOCATIONS OF THE MUA
 INTAKE AND THE EXHAUST FAN AND ALL REQUIRED CLEARANCE
 DISTANCE MEASUREMENTS FROM MECHANICAL AND GRAVITY
 EXHAUST OUTLETS AND AIR INTAKES, AND ROOF EDGES-
 SECTIONS 304.11, 401.4, 506.3.13.3
  
 4) PROVIDE WIND LOAD ENGINEERING AND WIND LOAD DESIGN
 CRITERIA FOR INSTALLATION OF THE MUA CURB AND THE
 EXHAUST FAN AND CURB- SECTION 301.15.
  
 5) SUBMIT MANUFACTURER'S SPECIFCATIONS FOR THE DUCT
 WRAP- SECTION 506.3.11.2.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved