Plan Review Details - Permit 17061240
Plan Review Stops For Permit 17061240
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2017-07-20 Cont ID  
Sent By gjohnson Date 2017-07-20 Time 07:10 Rev Time 0.00
Received By gjohnson Date 2017-07-20 Time 07:10 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2017-06-29 Cont ID  
Sent By gjohnson Date 2017-06-29 Time 10:32 Rev Time 0.00
Received By gjohnson Date 2017-06-29 Time 10:31 Sent To  
Notes
2017-06-29 10:53:521ST REVIEW: FBC 2014 5TH EDITION
  
 PLUMBING COMMENTS:
  
 1. PROVIDE SIZING TABLE FOR CSST PIPING. PER WPB AMEND
 TO FBC 107.2.1
  
 2. PLEASE PROVIDE EHD # ON RISER FOR CSST PIPE. PER WPB
 AMEND TO FBC 107.2.1
  
 3. PROVIDE LONGEST RUN LENGTH FOR .5LB SYSTEM. PER FBC
 FG 402.4.1
  
 4. THE WAY THE RISER AND FLAT DRAWING ARE DRAWN IT
 SHOWS THE PE PIPING RUNNING UNDER THE BUILDING WHICH IS
 NOT ALLOWED PLEASE SHOW TRANSITION FROM PE TO GALV OR
 CSST BEFORE ENTERING BUILDING. PER FBC FG 404.17.1
  
 5. PLANS SHALL BE SIGNED AND SEALED BY DESIGN
 PROFESSIONAL OF RECORD. PER WPB AMEND TO FBC 107.2.1
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-07-20 Cont ID  
Sent By gjohnson Date 2017-07-20 Time 07:10 Rev Time 0.00
Received By gjohnson Date 2017-07-17 Time 14:20 Sent To  
Notes
2017-07-18 14:20:55RESUB ROUTED TO GJOHNSON

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-06-29 Cont ID  
Sent By gjohnson Date 2017-06-29 Time 10:54 Rev Time 0.00
Received By gjohnson Date 2017-06-27 Time 14:20 Sent To  
Notes
2017-06-28 14:20:39REVISION ROUTED TO GJOHNSON

Review Stop P PLUMBING
Rev No 1 Status N Date 2017-06-29 Cont ID  
Sent By gjohnson Date 2017-06-29 Time 10:31 Rev Time 0.00
Received By gjohnson Date 2017-06-29 Time 10:31 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved