Plan Review Details - Permit 17061232
Plan Review Stops For Permit 17061232
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2017-06-29 Cont ID  
Sent By rmcdouga Date 2017-06-29 Time 08:17 Rev Time 0.00
Received By rmcdouga Date 2017-06-29 Time 08:17 Sent To  
Notes
2017-06-29 10:19:32PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE PLANS SPECIFY A TPO (THERMOPLASTIC POLYOLEFIN)
 ROOF COVERING. THE PRODUCT APPROVAL THAT WAS SUBMITTED
 IS FOR A SBS (MODIFIED ASPHALT) ROOF COVERING. SUBMIT
 PRODUCT APPROVALS FOR THE TPO ROOFING OR PROVIDE A
 SIGNED AND SEALED LETTER FROM THE ARCHITECT, EUGENE R.
 FAGAN III, REVISING THE ROOF COVERING. FBC 107.2.1
  
 2) THE PLANS SPECIFY THE REQUIRED ROOF DESIGN PRESSURES
 OF +36, -101 PSF FOR ROOF ZONE 2 AND +36, -149 PSF FOR
 ROOF ZONE 3. THE MAXIMUM DESIGN PRESSURE FOR THE SBS
 SELF ADHERED SYSTEM (W-138 FROM FL1654) THAT WAS
 SUBMITTED IS -90 PSF, WHICH IS TOO LOW. FBC-R301.1
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-06-29 Cont ID  
Sent By rmcdouga Date 2017-06-29 Time 08:18 Rev Time 0.00
Received By rmcdouga Date 2017-06-27 Time 10:24 Sent To  
Notes
2017-06-28 10:24:11RMCDOUGAL


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved