Plan Review Details - Permit 17061016
Plan Review Stops For Permit 17061016
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2017-10-03 Cont ID  
Sent By cthroop Date 2017-10-03 Time 17:12 Rev Time 0.00
Received By cthroop Date 2017-10-03 Time 16:58 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2017-07-10 Cont ID  
Sent By cthroop Date 2017-07-10 Time 09:34 Rev Time 0.00
Received By cthroop Date 2017-07-10 Time 09:14 Sent To E
Notes
2017-07-10 09:42:53BUILDING PLAN REVIEW
 2014 FLORIDA BUILDING CODE W/2010 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1
 ADMINISTRATION
  
 CHRISTOPHER S. THROOP, C.B.O.
 PLANS EXAMINER, PX3169
 CONSTRUCTION SERVICES DIVISION
 TEL: 561-805-6726
 FAX: 561-805-6676
  
 1ST REVIEW
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 1. PLANS SHALL BE SIGNED AND SEALED PER FS 481.
 2. PROVIDE FOUNDATION DETAILS FOR NEW MOTOR, PUMP AND
 FUEL TANK.
  
 PURSUANT TO FBC 107.1, AND FS 481.229 (1) (C), AS THIS
 DESIGN EXCEEDS $25,000.00 IN VALUE, THE DESIGN MUST BE
 PREPARED BY A LICENSED PROFESSIONAL PURSUANT TO FS 481.
 SEE BELOW:
 FBC107.1 GENERAL. SUBMITTAL DOCUMENTS CONSISTING OF
 CONSTRUCTION DOCUMENTS, STATEMENT OF SPECIAL
 INSPECTIONS, GEOTECHNICAL REPORT AND OTHER DATA SHALL
 BE SUBMITTED IN TWO OR MORE SETS WITH EACH PERMIT
 APPLICATION.
 THE CONSTRUCTION DOCUMENTS SHALL BE PREPARED BY A
 REGISTERED DESIGN PROFESSIONAL WHERE REQUIRED BY
 CHAPTER 471, FLORIDA STATUTES& 61G15 FLORIDA
 ADMINISTRATIVE CODE OR CHAPTER 481, FLORIDA STATUTES&
 61G1 FLORIDA ADMINISTRATIVE CODE.
 WHERE SPECIAL CONDITIONS EXIST, THE BUILDING OFFICIAL
 IS AUTHORIZED TO REQUIRE ADDITIONAL CONSTRUCTION
 DOCUMENTS TO BE PREPARED BY A REGISTERED DESIGN
 PROFESSIONAL. ELECTRONIC MEDIA DOCUMENTS SHALL BE
 SUBMITTED WHEN REQUIRED BY THE BUILDING OFFICIAL, AND
 MAY REQUIRE ONLY ONE SET OF SUBMITTALS.
 PLANS THAT HAVE BEEN PREPARED BY AN ENGINEER AND
 SUBMITTED FOR PUBLIC RECORD SHALL BEAR THE SIGNATURE,
 DATE AND SEAL OF THE ENGINEER PER FL ADMIN. CODE RULE
 61G15-23.001.
  
 FBC 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED AND DRAWN
 UPON SUITABLE MATERIAL. CONSTRUCTION DOCUMENTS SHALL BE
 OF SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE
 AND EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT
 IT WILL CONFORM TO THE PROVISIONS OF THIS CODE AND
 RELEVANT LAWS, ORDINANCES, RULES AND REGULATIONS, AS
 DETERMINED BY THE BUILDING OFFICIAL.
  

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2017-07-10 Cont ID  
Sent By jleahy Date 2017-07-10 Time 11:49 Rev Time 0.00
Received By jleahy Date 2017-07-10 Time 11:49 Sent To M
Notes
2017-07-10 11:55:36FLORIDA BUILDING CODE 2014 5TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH ED
 NFPA 70 2011 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
  
 NO ELECTRIC SHOWN IN THESE DRAWINGS

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2017-09-29 Cont ID  
Sent By pleduc Date 2017-09-29 Time   Rev Time 0.00
Received By pleduc Date 2017-09-29 Time 11:43 Sent To B
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2017-06-27 Cont ID  
Sent By pleduc Date 2017-06-27 Time   Rev Time 0.00
Received By pleduc Date 2017-06-26 Time 15:39 Sent To M
Notes
2017-06-27 12:35:38THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 ON REVIEW OF THE SUBMITTAL, THERE IS INSUFFICIENT
 INFORMATION PROVIDED THAT THE SPACE/AREA IS DESIGNED OR
 PROTECTED TO ACCOMODATE THE PROPOSED CHANGE.
  
 SHEET 1.1-
  
 PER NFPA 110
  
 1) 4.1.2 ENGINES LOCATED IN STRUCTURES.
  
 4.1.2.1 ENGINE ROOMS.
 4.1.2.1.1 ENGINE ROOMS LOCATED WITHIN STRUCTURES SHALL
 HAVE INTERIOR WALLS, FLOORS, AND CEILINGS OF AT LEAST
 1-HOUR FIRE RESISTANCE RATING, UNLESS OTHERWISE
 PERMITTED BY 4.1.2.1.2.
 4.1.2.1.2 THE CEILING OF ROOMS LOCATED ON THE TOP FLOOR
 OF A STRUCTURE SHALL BE PERMITTED TO BE NONCOMBUSTIBLE
 OR PROTECTED WITH AN AUTOMATIC FIRE SUPPRESSION SYSTEM.
 4.1.2.1.3* ENGINE ROOMS SHALL HAVE VENTILATION THAT IS
 ADEQUATE TO PREVENT A HAZARDOUS ACCUMULATION OF
 FLAMMABLE VAPORS OR GASES, BOTH WHEN THE ENGINE IS
 OPERATING AND WHEN IT IS SHUT DOWN.
 4.1.2.1.4 ENGINE ROOMS ATTACHED TO STRUCTURES SHALL
 COMPLY WITH 4.1.2.2.1 AND 4.1.2.2.3 EXCEPT THAT THE
 COMMON WALL SHALL HAVE A FIRE RESISTANCE RATING OF AT
 LEAST 1 HOUR.
 4.1.2.1.5* OPENINGS FROM AN ENGINE ROOM TO OTHER
 SECTIONS OF THE STRUCTURE SHALL BE PROVIDED WITH
 AUTOMATIC OR SELF-CLOSING FIRE DOORS OR DAMPERS
 CORRESPONDING TO THE RATING OF THE WALLS IN WHICH THEY
 ARE LOCATED.
 4.1.2.1.6 ROOMS CONTAINING ENGINES UTILIZING A CLASS I
 FUEL SHALL BE LOCATED ON AN EXTERIOR WALL, THE
 CONSTRUCTION OF WHICH SHALL PROVIDE READY ACCESSIBILITY
 FOR FIRE-FIGHTING OPERATIONS THROUGH THE PROVISION OF
 DOORS, ACCESS OPENINGS, WINDOWS, LOUVERS, OR
 LIGHTWEIGHT, NONCOMBUSTIBLE WALL PANELS.
  
 PLEASE PROVIDE DETAILS FOR THE REQUIRMENTS.
  
  
  
 2) 7.9 FUEL SYSTEM.
  
 7.9.1 FUEL TANKS SHALL BE SIZED TO ACCOMMODATE THE
 SPECIFIC EPS CLASS.
 7.9.1.1 ALL FUEL TANKS AND SYSTEMS SHALL BE INSTALLED
 AND MAINTAINED IN ACCORDANCE WITH NFPA 30, FLAMMABLE
 AND COMBUSTIBLE LIQUIDS CODE, NFPA 37, STANDARD FOR THE
 INSTALLATION AND USE OF STATIONARY COMBUSTION ENGINES
 AND GAS TURBINES, NFPA54, NATIONAL FUEL GAS CODE, AND
 NFPA 58, LIQUEFIED PETROLEUM GAS CODE.
 7.9.1.2* FUEL SYSTEM DESIGN SHALL PROVIDE FOR A SUPPLY
 OF CLEAN FUEL TO THE PRIME MOVER.
 7.9.1.3 TANKS SHALL BE SIZED SO THAT THE FUEL IS
 CONSUMED WITHIN THE STORAGE LIFE, OR PROVISION SHALL BE
 MADE TO REPLACE STALE FUEL WITH CLEAN FUEL.
 7.9.2 FUEL TANKS SHALL BE CLOSE ENOUGH TO THE PRIME
 MOVER FOR THE FUEL LIFT (SUCTION HEAD) OF THE PRIME
 MOVER FUEL PUMP TO MEET THE FUEL SYSTEM REQUIREMENTS,
 OR A FUEL TRANSFER PUMP AND DAY TANK SHALL BE PROVIDED.
 7.9.2.1 IF THE ENGINE MANUFACTURER?S FUEL PUMP STATIC
 HEAD PRESSURE LIMITS ARE EXCEEDED WHEN THE LEVEL OF
 FUEL IN THE TANK IS AT A MAXIMUM, A DAY TANK SHALL BE
 UTILIZED.
 7.9.3 FUEL PIPING SHALL BE OF COMPATIBLE METAL TO
 MINIMIZE ELECTROLYSIS AND SHALL BE PROPERLY SIZED, WITH
 VENT AND FILL PIPES LOCATED TO PREVENT ENTRY OF
 GROUNDWATER OR RAIN INTO THE TANK.
 7.9.3.1 GALVANIZED FUEL LINES SHALL NOT BE USED.
 7.9.3.2 APPROVED FLEXIBLE FUEL LINES SHALL BE USED
 BETWEEN THE PRIME MOVER AND THE FUEL PIPING.
 7.9.4 DAY TANKS ON DIESEL SYSTEMS SHALL BE INSTALLED
 BELOW THE ENGINE FUEL RETURN ELEVATION.
 7.9.4.1 THE RETURN LINE TO THE DAY TANK SHALL BE BELOW
 THE FUEL RETURN ELEVATION.
  
 PLEASE PROVIDE DETAILS FOR THE REQUIREMENTS.
  
  
  
  
 PER NFPA 37
  
 3) 6.3.2 FUEL TANKS INSIDE STRUCTURES.
  
 6.3.2.1 FUEL TANKS INSIDE STRUCTURES SHALL BE SECURELY
 MOUNTED ON NONCOMBUSTIBLE SUPPORTS.
 6.3.2.2* FUEL TANKS NOT IN A ROOM BY THEMSELVES SHALL
 NOT EXCEED 2500 L (660 GAL) CAPACITY. FUEL TANKS LARGER
 THAN 2500 L (660 GAL) CAPACITY SHALL BE ENCLOSED IN A
 ROOM IN ACCORDANCE WITH 6.3.5 OR
 6.3.6. NOT MORE THAN ONE 2500 L (660 GAL) CAPACITY
 TANK, OR TWO OR MORE TANKS WITH AN AGGREGATE CAPACITY
 OF NOT MORE THAN 2500 L (660 GAL), SHALL BE CONNECTED
 TO ANY ONE ENGINE.
 EXCEPTION: FUEL TANKS OF ANY SIZE SHALL BE PERMITTED
 WITHIN ENGINE ROOMS OR MECHANICAL SPACES, PROVIDED THE
 ENGINE OR MECHANICAL ROOM IS DESIGNED USING RECOGNIZED
 ENGINEERING PRACTICES WITH SUITABLE FIRE DETECTION,
 FIRE SUPPRESSION, AND CONTAINMENT MEANS TO PREVENT THE
 SPREAD OF FIRE BEYOND THE ROOM OF ORIGIN.
  
 6.3.2.4 FUEL TANKS WITHIN STRUCTURES SHALL BE PROVIDED
 WITH SPILL CONTAINMENT CONSISTING OF EITHER A WALL, A
 CURB, OR A DIKE HAVING A CAPACITY AT LEAST EQUAL TO
 THAT OF THE LARGEST TANK ENCLOSED.
 EXCEPTION: A SPILL CONTAINMENT SYSTEM OF LESSER
 CAPACITY EQUIPPED WITH AN OVERFLOW OR DRAINAGE SYSTEM
 THAT IS ADEQUATE IN SIZE AND LOCATION TO CONVEY ANY
 SPILLAGE OF FUEL TO A TANK (INSIDE OR OUTSIDE) OR TO A
 SAFE AREA OUTSIDE THE STRUCTURE.
  
 PLEASE PROVIDE DETAILS FOR THE REQUIREMENTS.
  
  
  
  
  
  
  
 PER NFPA 37
  
  
 4) 8.2.3 EXHAUST SYSTEM TERMINATION.
  
 8.2.3.1* EXHAUST SYSTEMS SHALL TERMINATE OUTSIDE THE
 STRUCTURE AT A POINT WHERE HOT GASES, SPARKS, OR
 PRODUCTS OF COMBUSTION WILL DISCHARGE TO A SAFE
 LOCATION.
 8.2.3.2 EXHAUST SYSTEM TERMINATIONS SHALL NOT BE
 DIRECTED TOWARD COMBUSTIBLE MATERIAL OR STRUCTURES OR
 INTO ATMOSPHERES CONTAINING FLAMMABLE GASES, FLAMMABLE
 VAPORS, OR COMBUSTIBLE DUSTS.
 8.2.3.3 EXHAUST SYSTEMS EQUIPPED WITH SPARK-ARRESTING
 MUFFLERS SHALL BE PERMITTED TO TERMINATE IN DIVISION 2
 LOCATIONS AS DEFINED IN ARTICLE 500 OF NFPA 70,
 NATIONAL ELECTRICAL CODE.
 8.2.4 WHERE NECESSARY TO PREVENT PERSONNEL BURNS,
 EXHAUST SYSTEMS SHALL BE GUARDED.
  
  
 PER NFPA 37
  
  
  
 5) 11.3 FIRE DETECTION AND ALARM SYSTEMS.
  
 11.3.1* AUTOMATIC FIRE DETECTION AND ALARM SYSTEMS,
 WHERE PROVIDED, SHALL COMPLY WITH NFPA72, NATIONAL
 FIREALARM AND SIGNALING CODE.
 11.3.2 THE ELECTRICAL INSTALLATION AND REQUIRED RATING
 OF SYSTEM COMPONENTS SHALL COMPLY WITH NFPA 70,
 NATIONAL ELECTRICAL CODE.
 11.3.3 AUTOMATIC FUEL STOP VALVES, WHERE REQUIRED BY
 OTHERSECTIONS OF THIS STANDARD, SHALL BE ARRANGED TO
 CLOSE UPON ACTIVATION OF THE FIRE DETECTION SYSTEM
 WITHIN THE FIRE ALARM ZONE THAT COVERS THE ENGINE
 INSTALLATION, INCLUDING AUXILIARY EQUIPMENT.
 11.3.3.1 WHERE WRITTEN PROCEDURES ARE IN PLACE TO
 DIRECT OPERATOR ACTIONS UPON ACTIVATION OF THE
 DETECTION SYSTEM, AUTOMATIC FUEL STOP VALVES FOR
 ENGINES THAT ARE USED FOR EMERGENCY USE OR FOR ENGINES
 THAT ARE CONSTANTLY ATTENDED SHALL BE PERMITTED TO
 REMAIN OPEN.
 11.3.4 MECHANICAL VENTILATION SYSTEMS, WHERE PROVIDED,
 SHALL BE ARRANGED TO SHUT DOWN UPON ACTIVATION OF THE
 FIRE DETECTION SYSTEM WITHIN THE ENGINE ENCLOSURE.
  
 11.3.4.1 WHERE PROCEDURES ARE IN PLACE TO DIRECT
 OPERATOR ACTIONS, MECHANICAL VENTILATION SYSTEMS FOR
 ENGINES THAT ARE USED FOR EMERGENCY USE OR FOR ENGINES
 THAT ARE CONSTANTLY ATTENDED SHALL BE PERMITTED TO
 REMAIN IN OPERATION.
  
  
 PLEASE PROVIDE DETAILS FOR THE REQUIREMENTS.
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-10-03 Cont ID  
Sent By cthroop Date 2017-10-03 Time 17:12 Rev Time 0.00
Received By cthroop Date 2017-09-26 Time 14:25 Sent To  
Notes
2017-09-27 14:26:07RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-09-27 Cont ID  
Sent By jleahy Date 2017-07-10 Time 11:57 Rev Time 0.00
Received By lmarchan Date 2017-06-22 Time 15:53 Sent To  
Notes
2017-06-23 15:53:52REVISION ROUTED TO FIRE INBOX

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2017-07-11 Cont ID  
Sent By ccole Date 2017-07-11 Time 13:49 Rev Time 0.00
Received By hmoser Date 2017-07-11 Time 13:47 Sent To  
Notes
2017-07-11 13:49:51SEPARATE PERMIT REQUIRED FOR FUEL TANK.
  
 PLAN REVIEW BY HAROLD MOSER
 [email protected]
 OFFICE 561-805-6732
 FAX 561-805-6676


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved