Plan Review Details - Permit 17060393
Plan Review Stops For Permit 17060393
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2017-06-28 Cont ID  
Sent By jgomez Date 2017-06-28 Time 08:09 Rev Time 0.00
Received By jgomez Date 2017-06-28 Time 06:52 Sent To  
Notes
2017-06-28 06:54:11 
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2017-06-23 Cont ID  
Sent By jgomez Date 2017-06-23 Time 11:07 Rev Time 0.00
Received By jgomez Date 2017-06-23 Time 07:47 Sent To  
Notes
2017-06-23 10:58:50RESIDENTIAL (R2) ALTERATION. SECOND BUILDING REVIEW
 CHECKLIST.
 CODE: FBC 5TH EDITION (2014).
  
 ORIGINAL COMMENT:
 1- SOUND INSULATION MATERIAL SUBMITTED:
 A) PROVIDE 2 COPIES OF THE FLAME SPREAD INDEX AND SMOKE
 DEVELOPED TEST DONE IN ACCORDANCE WITH ASTM E 84 OR UL
 723 AS REQUIRED BY SEC. 720.1 OF FBC 5TH EDITION
 (2014).
 B) PROVIDE 2 COPIES OF THE SOUND TRANSMISSION CLASS
 (STC) TEST DONE IN ACCORDANCE WITH ASTM E 90 AS
 REQUIRED BY SEC. 1207.2 OF FBC 5TH EDITION (2014).
 NOTE: TEST SAMPLE TO MATCH ACTUAL BUILDING
 CONSTRUCTION. TECHNICAL DATA SUBMITTED SHOWS THAT THE
 TESTS WERE CONDUCTED ON 8" CONCRETE SLAB WITH
 ACOUSTICAL CEILING. THIS ASSEMBLY DOESN'T MATCH THE
 ASSEMBLY ON THIS BUILDING. THIS BUILDING HAS A 7"
 CONCRETE SLAB AND THERE IS NO ACOUSTICAL CEILING. THERE
 ARE TESTS FOR 6" CONCRETE SLABS WITHOUT ACOUSTICAL
 CEILING. PROVIDE INFORMATION THAT MORE CLOSELY MATCHES
 THIS BUILDING ASSEMBLY.
  
 RESPONSE TO ITEMS (A) AND (B) ABOVE:
 ALL TESTS SUBMITTED ARE FOR 8" CONCRETE SLAB WITH
 ACOUSTICAL CEILING. THAT'S WHY THE RESULTS ARE SO HIGH.
 THIS BUILDING HAS A 7" CONCRETE SLAB AND THERE IS NO
 ACOUSTICAL CEILING. SUBMIT COPIES FOR TESTS DONE ON THE
 TYPE OF ASSEMBLY THAT CLOSELY MATCHES THIS BUILDING
 ASSEMBLY. REPEAT COMMENT.
  
  
 ORIGINAL COMMENT:
 C) PROVIDE 2 COPIES OF THE IMPACT INSULATION CLASS
 (IIC) TEST DONE IN ACCORDANCE WITH ASTM E 492 AS
 REQUIRED BY SEC. 1207.3 OF FBC 5TH EDITION (2014).
 NOTE: TEST SAMPLE TO MATCH ACTUAL BUILDING
 CONSTRUCTION. TECHNICAL DATA SUBMITTED SHOWS THAT THE
 TESTS WERE CONDUCTED ON 8" CONCRETE SLAB WITH
 ACOUSTICAL CEILING. THIS ASSEMBLY DOESN'T MATCH THE
 ASSEMBLY ON THIS BUILDING. THIS BUILDING HAS A 7"
 CONCRETE SLAB AND THERE IS NO ACOUSTICAL CEILING. THERE
 ARE TESTS FOR 6" CONCRETE SLABS WITHOUT ACOUSTICAL
 CEILING. PROVIDE INFORMATION THAT MORE CLOSELY MATCHES
 THIS BUILDING ASSEMBLY.
  
 RESPONSE:
 NO INFORMATION WAS SUBMITTED. REPEAT COMMENT.
  
 ORIGINAL COMMENT:
 2- VALUATION DECLARED IN THE PERMIT APPLICATION IS TOO
 LOW. VALUATION TO INCLUDE ALL LABOR, MATERIALS AND
 CONTRACTOR'S OVERHEAD AND PROFIT AS REQUIRED BY SEC.
 109.3 CITY AMENDMENTS. NOTE: PROVIDE COPY OF SIGNED
 CONTRACT FOR ALL SCOPE OF WORK TO BE DONE FOR BUILDING
 OFFICIAL APPROVAL.
  
 RESPONSE:
 IT LOOKS LIKE THE ESTIMATE SUBMITTED IS ONLY FOR
 INSTALLATION AND OWNER IS SUPPLYING THE MATERIALS. NEED
 TO INCLUDE THE COST OF ALL MATERIALS IN THE VALUATION.
  
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2017-06-21 Cont ID  
Sent By jgomez Date 2017-06-21 Time 10:14 Rev Time 0.00
Received By jgomez Date 2017-06-21 Time 10:13 Sent To  
Notes
2017-06-21 10:13:36E-MAIL RESPONSE FROM MARK CONRAD:
 HI MR. GOMEZ-THANKS FOR YOUR EMAIL-ATTACHED IS THE
 QUOTE FROM MY TILE GUY TO PERFORM THE WORK AT 300
 AUSTRALIAN UNIT 213-I DID NOT INCLUDE MY 20%
 PROFIT/OVERHEAD TO PERMIT VALUE-WILL THIS BE SUFFICIENT
 DOCUMENTATION? AS FOR SOUND MEMBRANE DOCUMENTATION-I
 BELIEVE WE INADVERTENTLY GAVE THIS TO THE BUILDING
 MANAGER SO I WILL BE SURE TO FORWARD THIS DOCUMENTATION
 TO YOU? WILL THIS BE SATISFACTORY TO ALLOW FOR THE
 RELEASE OF THIS PERMIT? THANKS VERY MUCH-MARK CONRAD.
  
  
 RESPONSE TO MARK CONRAD:
 1- REGARDING THE SOUND MEMBRANE DOCUMENTATION, PLEASE
 MAKE SURE COPIES OF THE TESTS ARE FOR THE ACTUAL
 ASSEMBLY OF THIS BUILDING. REVIEW THE DOCUMENTATION
 BEFORE SUBMITTAL. CHECK THE THICKNESS OF THE CONCRETE
 SLAB AND IF ACOUSTICAL CEILING IS CONSIDERED IN THE
 TESTS. SEE ITEMS A,B AND C OF ITEM #1 BELOW.
  
 2- REGARDING THE VALUE. IT LOOKS LIKE THE ESTIMATE
 SUBMITTED IS ONLY FOR INSTALLATION AND OWNER IS
 SUPPLYING THE MATERIALS. NEED TO INCLUDE THE COST OF
 ALL MATERIALS IN THE VALUATION.
  
  
 RESIDENTIAL (R2) ALTERATION. BUILDING REVIEW COMMENTS.
 CODE: FBC 5TH EDITION (2014).
  
 1- SOUND INSULATION MATERIAL SUBMITTED:
 A) PROVIDE 2 COPIES OF THE FLAME SPREAD INDEX AND SMOKE
 DEVELOPED TEST DONE IN ACCORDANCE WITH ASTM E 84 OR UL
 723 AS REQUIRED BY SEC. 720.1 OF FBC 5TH EDITION
 (2014).
  
 B) PROVIDE 2 COPIES OF THE SOUND TRANSMISSION CLASS
 (STC) TEST DONE IN ACCORDANCE WITH ASTM E 90 AS
 REQUIRED BY SEC. 1207.2 OF FBC 5TH EDITION (2014).
  
 NOTE: TEST SAMPLE TO MATCH ACTUAL BUILDING
 CONSTRUCTION. TECHNICAL DATA SUBMITTED SHOWS THAT THE
 TESTS WERE CONDUCTED ON 8" CONCRETE SLAB WITH
 ACOUSTICAL CEILING. THIS ASSEMBLY DOESN'T MATCH THE
 ASSEMBLY ON THIS BUILDING. THIS BUILDING HAS A 7"
 CONCRETE SLAB AND THERE IS NO ACOUSTICAL CEILING. THERE
 ARE TESTS FOR 6" CONCRETE SLABS WITHOUT ACOUSTICAL
 CEILING. PROVIDE INFORMATION THAT MORE CLOSELY MATCHES
 THIS BUILDING ASSEMBLY.
  
 C) PROVIDE 2 COPIES OF THE IMPACT INSULATION CLASS
 (IIC) TEST DONE IN ACCORDANCE WITH ASTM E 492 AS
 REQUIRED BY SEC. 1207.3 OF FBC 5TH EDITION (2014).
  
 NOTE: TEST SAMPLE TO MATCH ACTUAL BUILDING
 CONSTRUCTION. TECHNICAL DATA SUBMITTED SHOWS THAT THE
 TESTS WERE CONDUCTED ON 8" CONCRETE SLAB WITH
 ACOUSTICAL CEILING. THIS ASSEMBLY DOESN'T MATCH THE
 ASSEMBLY ON THIS BUILDING. THIS BUILDING HAS A 7"
 CONCRETE SLAB AND THERE IS NO ACOUSTICAL CEILING. THERE
 ARE TESTS FOR 6" CONCRETE SLABS WITHOUT ACOUSTICAL
 CEILING. PROVIDE INFORMATION THAT MORE CLOSELY MATCHES
 THIS BUILDING ASSEMBLY.
  
 2- VALUATION DECLARED IN THE PERMIT APPLICATION IS TOO
 LOW. VALUATION TO INCLUDE ALL LABOR, MATERIALS AND
 CONTRACTOR'S OVERHEAD AND PROFIT AS REQUIRED BY SEC.
 109.3 CITY AMENDMENTS. NOTE: PROVIDE COPY OF SIGNED
 CONTRACT FOR ALL SCOPE OF WORK TO BE DONE FOR BUILDING
 OFFICIAL APPROVAL.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2017-06-20 Cont ID  
Sent By jgomez Date 2017-06-20 Time 17:50 Rev Time 0.00
Received By jgomez Date 2017-06-20 Time 17:29 Sent To  
Notes
2017-06-20 18:02:03RESIDENTIAL (R2) ALTERATION. BUILDING REVIEW COMMENTS.
 CODE: FBC 5TH EDITION (2014).
  
 1- SOUND INSULATION MATERIAL SUBMITTED:
 A) PROVIDE 2 COPIES OF THE FLAME SPREAD INDEX AND SMOKE
 DEVELOPED TEST DONE IN ACCORDANCE WITH ASTM E 84 OR UL
 723 AS REQUIRED BY SEC. 720.1 OF FBC 5TH EDITION
 (2014).
  
 B) PROVIDE 2 COPIES OF THE SOUND TRANSMISSION CLASS
 (STC) TEST DONE IN ACCORDANCE WITH ASTM E 90 AS
 REQUIRED BY SEC. 1207.2 OF FBC 5TH EDITION (2014).
  
 NOTE: TEST SAMPLE TO MATCH ACTUAL BUILDING
 CONSTRUCTION. TECHNICAL DATA SUBMITTED SHOWS THAT THE
 TESTS WERE CONDUCTED ON 8" CONCRETE SLAB WITH
 ACOUSTICAL CEILING. THIS ASSEMBLY DOESN'T MATCH THE
 ASSEMBLY ON THIS BUILDING. THIS BUILDING HAS A 7"
 CONCRETE SLAB AND THERE IS NO ACOUSTICAL CEILING. THERE
 ARE TESTS FOR 6" CONCRETE SLABS WITHOUT ACOUSTICAL
 CEILING. PROVIDE INFORMATION THAT MORE CLOSELY MATCHES
 THIS BUILDING ASSEMBLY.
  
 C) PROVIDE 2 COPIES OF THE IMPACT INSULATION CLASS
 (IIC) TEST DONE IN ACCORDANCE WITH ASTM E 492 AS
 REQUIRED BY SEC. 1207.3 OF FBC 5TH EDITION (2014).
  
 NOTE: TEST SAMPLE TO MATCH ACTUAL BUILDING
 CONSTRUCTION. TECHNICAL DATA SUBMITTED SHOWS THAT THE
 TESTS WERE CONDUCTED ON 8" CONCRETE SLAB WITH
 ACOUSTICAL CEILING. THIS ASSEMBLY DOESN'T MATCH THE
 ASSEMBLY ON THIS BUILDING. THIS BUILDING HAS A 7"
 CONCRETE SLAB AND THERE IS NO ACOUSTICAL CEILING. THERE
 ARE TESTS FOR 6" CONCRETE SLABS WITHOUT ACOUSTICAL
 CEILING. PROVIDE INFORMATION THAT MORE CLOSELY MATCHES
 THIS BUILDING ASSEMBLY.
  
 2- VALUATION DECLARED IN THE PERMIT APPLICATION IS TOO
 LOW. VALUATION TO INCLUDE ALL LABOR, MATERIALS AND
 CONTRACTOR'S OVERHEAD AND PROFIT AS REQUIRED BY SEC.
 109.3 CITY AMENDMENTS. NOTE: PROVIDE COPY OF SIGNED
 CONTRACT FOR ALL SCOPE OF WORK TO BE DONE FOR BUILDING
 OFFICIAL APPROVAL.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2017-06-28 Cont ID  
Sent By jgomez Date 2017-06-28 Time 08:09 Rev Time 0.00
Received By jgomez Date 2017-06-26 Time 11:09 Sent To  
Notes
2017-06-27 11:10:03RESUB ROUTED TO JGOMEZ

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-06-23 Cont ID  
Sent By jgomez Date 2017-06-23 Time 11:22 Rev Time 0.00
Received By jgomez Date 2017-06-21 Time 13:03 Sent To  
Notes
2017-06-22 13:03:31RESUB ROUTED TO JGOMEZ

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-06-21 Cont ID  
Sent By jgomez Date 2017-06-21 Time 10:25 Rev Time 0.00
Received By jgomez Date 2017-06-21 Time 10:09 Sent To  
Notes
2017-06-21 10:14:00E-MAIL RESPONSE FROM MARK CONRAD:
 HI MR. GOMEZ-THANKS FOR YOUR EMAIL-ATTACHED IS THE
 QUOTE FROM MY TILE GUY TO PERFORM THE WORK AT 300
 AUSTRALIAN UNIT 213-I DID NOT INCLUDE MY 20%
 PROFIT/OVERHEAD TO PERMIT VALUE-WILL THIS BE SUFFICIENT
 DOCUMENTATION? AS FOR SOUND MEMBRANE DOCUMENTATION-I
 BELIEVE WE INADVERTENTLY GAVE THIS TO THE BUILDING
 MANAGER SO I WILL BE SURE TO FORWARD THIS DOCUMENTATION
 TO YOU? WILL THIS BE SATISFACTORY TO ALLOW FOR THE
 RELEASE OF THIS PERMIT? THANKS VERY MUCH-MARK CONRAD.
  
  
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-06-20 Cont ID  
Sent By jgomez Date 2017-06-20 Time 18:02 Rev Time 0.00
Received By jgomez Date 2017-06-09 Time 11:13 Sent To  
Notes
2017-06-12 11:13:20BLDG <5K