Plan Review Details - Permit 17050949
Plan Review Stops For Permit 17050949
Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-05-25 Cont ID  
Sent By tklarge Date 2017-05-25 Time 09:42 Rev Time 0.00
Received By tklarge Date 2017-05-25 Time 09:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-05-25 Cont ID  
Sent By tklarge Date 2017-05-25 Time 06:44 Rev Time 0.00
Received By tklarge Date 2017-05-22 Time 09:54 Sent To  
Notes
2017-05-23 09:54:51ROUTED TO PLUMBING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2017-05-25 Cont ID  
Sent By tklarge Date 2017-05-25 Time 09:42 Rev Time 0.00
Received By tklarge Date 2017-05-25 Time 09:42 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-05-25 Cont ID  
Sent By tklarge Date 2017-05-25 Time 06:44 Rev Time 0.00
Received By tklarge Date 2017-05-25 Time 06:34 Sent To  
Notes
2017-05-25 06:44:461) SUBMIT 2 COPIES OF A SITE PLAN SHOWING THE LOCATION
 OF THE WORK TO BE DONE. WPB AMEND. TO FBC SEC. 107.2.1.
 2) IF THE NEW SEWER IS BEING RUN ALL THE WAY TO THE
 CITY LATERAL, A CLEANOUT BROUGHT TO GRADE MUST BE
 INSTALLED AT THE CITY LATERAL.
 3) A SAMPLING PORT SHLL BE INSTALLED AT THE OUTLET OF
 THE GREASE INTERCEPTOR. THE SAMPLING PORT SHALL BE THE
 SAME SIZE AS THE OUTLET LINE AND A MINIMUM OF 4 INCH. A
 TWO WAY CLEANOUT TEE WILL MEET THIS REQUIREMENT.
 NOTE: THE SITE PLAN CAN BE HAND DRAWN.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  